Contract notice: Construction work for bridges Tender - 26907790
Tender notice from Bulgaria, published on 19 Sep 2018.
Executive Summary
The ???????? ??????????? „?????????? ???????? „??????????? ??????????????“ has issued a Tender notice for the procurement of a Contract notice: Construction work for bridges and tunnels, shafts and subways in the Bulgaria. This Tender notice was published on 19 Sep 2018 and is scheduled to close on 26 Oct 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 26907790, while the tender notice number is 407335-2018 and Register on the platform.
Key facts
Summary
Contract notice: Construction work for bridges and tunnels, shafts and subways
Object of the contract Construction work for bridges and tunnels, shafts and subways Description: Contract notice: Construction work for bridges and tunnels, shafts and subways Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 45221000, 45221000, 45221000 CPV Description: Construction work for bridges and tunnels, shafts and subways Repair of reinforced concrete bridges in 4 (four) detached positions Removal of defects from general revisions and reconstruction of anti-corrosion coatings and paths, painting, installation of paw bolts, repair of rivets, repair cracked and torn passage plates, switching of lead slabs to steel bridges. Main Site: Bridge at km 89 288 in the interstate Dyakovo-Dupnitsa and the bridge at km 95 368 in the Dupnitsa-Boboshevo interconnection Lot 1 "Restoration of waterproofing, repair of crossing joints and renovation of concrete on the bridge at km 123 494 in the Blagoevgrad-Simitli intermodal (waterproofing 160 m, transverse joints 30 m, rehabilitation of columns, vault and supports 50 m) includes the following activities: - dismantling and installation of countertops type 49 - 50 m, - disassembly of jelly. road type 49 of the county. traverse grill and load. of transport - 75 m, - transport of a demon. jel. Type 49 road with a crane transport. to a landing at Blagoevgrad station and landing. - 12, 30 tons, - scrap. of the ballast prism in the area of the transverse joints and the compromise. hydroisole. with loading of transport - 90 m, - excavation of the existence. filling of draining and unsorted rock mat, incl. excavation, loading, transport up to 5 km and unloading. at a temporary landfill - 173, 10 m, - spoiling a protective layer of concrete or concrete slabs, incl. load. - 215.52 m, - spoilage of old hydroisole. in cement screed - 201, 40 m, - demo. of existing dilatation joints of copper sheet - 41, 40m-, - cleaning. of concrete surfaces in the area of the transverse joints and the compressor. hydroisole - 201.40 m, - sanirof the existence. cement - 201, 40 m, - primer. on base with bitumen primer - 160 m, - waterproofing. on concrete surfaces with APP or SBS membrane 4 mm first layer and reinforced membrane 5 mm for second layer - 160 m, - hydroisole replacement. of cross joints - 41, 40 m, - hydroisole protection. on walls and under the embankment with high-density polyethylene HDPE drainage membrane 600-1000 g / m - 160 m, - cartridge replacementdrainage of drains - 8, - making a pack of suitable drainage material, using. the removed. filling - 129.83 m, - delivery of new ballast for railway lines and ballasting - 90 m, - loading of a demounter. jel. road type 49 from a site in Blagoevgrad station, transport to the site with a transport of the execution. and unloading. - 12.30 t, - installation and laying of jelly. road - 75 m, - leveling. of newcomershe drank it. road - 75 m, - leveling. mechanic. of jelly. road - the approaches to the bridge - 800 m, - shaping and planning of the ballast prism - 895 m, - making and breaking the suspended scaffolding - 50 m, - cleaning. of concrete surfaces in the zone of compromise. parts of the structure of the vault and supports. of remediation - 50 m, - repair of compromise. parts of the structure of a vault and supports by a torcreter- 50 m, - extension. of the water mains - 8, - cleaning of the building. landing site. Waste - 24 m. For items 1 to 4 1. The participant must be registered in the Central Professional Register of the Builder with the Chamber of Builders of BULGARIA for the execution of construction works of Group II - constructions from the transport infrastructure, according to Art. 5, para. 1, item 2 of the Rulesfor the procedure for entering and keeping the Central Professional Register of Constructors (PIRVPPRS), first category of construction according to Art. 5, para. 6 (2) of the RBIRPCA and foreign persons in a similar register according to the legislation of the Member State in which they are established - The criterion is applied to each lot separately - If the participant is an association which is not a legal entity, the selection criterion shall be evidenced by each of the persons included in it who will carry out the respective activity according to the distribution of the participation of the persons in the implementation of the activities provided in the constituting document /, subcontractors must meet the relevant selection criteria according to youyes and the share of the order they will perform and for them there are no grounds for removal from the procedure. When submitting the tender, compliance with the eligibility criterion is indicated in Part IV "Selection Criteria", Section A "Efficiency" of the eEEDOP 2. The following document shall be presented for proof of compliance with the criterion: certificate of entry in the Central Professional Register of Constructors to Camconstruction of buildings in BULGARIA for the execution of construction works of the second group: constructions from the transport infrastructure, according to art. 5, para. 1, item 2 of the Regulations for the procedure for registration and keeping of the Central Professional Register of Constructors (PIRVPPR), first category of construction according to Art. 5, para. 6, sub-paragraph 2.1 of the IPPCPRP. For foreign persons, which fall within the scope of Art. 25a of the Law on the Chamber of Sts(SIC), the document under Art. 25a, para. 2, item 1 of the CPS. The document shall be submitted by the participant designated as contractor in the case of Art. 67, para. 6 of the Public Procurement Act - for lots 1 to 4 - 1. The participant should have professional liability insurance for construction or design and construction according to Article 171 / Article 171a of the TDA If the participant is an association which is not a legal entityan individual, the compliance with the selection criterion by each of the persons included therein who will carry out the respective activity according to the distribution of the participation of the persons in the performance of the activities provided in the constituting document / subcontractors, subcontractors must comply with the relevant selection criteriono the type and the share of the order they will perform and for which there are no grounds for removal from the procedure. Where the participant envisages the participation of third parties, third parties must meet the relevant selection criterion to prove the participant refers to their capacity and for them not to have the reasons for removal from the procedure. When submitting the bid orthe criterion of "economic and financial standing" is set out in Part IV "Selection Criteria", Section B "Economic and Financial Situation" of the EDECO. 2. the requirement imposed: evidence of the existence of professional liability insurance for design and construction orequivalent. The document is presented under the terms of Art. 67, para. 5 and para. 6 of the Public Procurement Act. In the open procedure may participate a participant who meets the requirements of art. 10, para. 1 of the Public Procurement Act. The Assignor does not have the right to create a legal entity when the participant selected as a contractor is a union of natural and / or legal entities. Where a participant is an association that is not a legal entity, it is obligeda copy of a document showing the legal basis for the formation of the grouping shall be submitted, with a time limit not shorter than the time limit for completion. of this public procurement contract. The document must contain: 1. the rights and obligations of the members of the grouping; the distribution of responsibility among the members of the grouping; the activities that each member of the group will perform. The Contracting Authority shall remove from the procedure the participant for whom the grounds under Art. 54, para. 1, item 1-7 of the Public Procurement Act, Art. 55, para. 1, item 1, item 4 and item 5 of the Public Procurement Act and Art. 107 of the Public Procurement Act, as well as the circumstances under Art. 3, item 8 and Art. 4 of the Economic and Financial Relations Act with companies registered in jurisdictions with preferential tax regime, the persons controlled by them and their actual ownersand presence of circumstances under Art. 69 of the Law on Counteracting Corruption and for Removing the Unlawfully Acquired Property. Any member of the grouping which is not a legal person, subcontractors and third parties must meet the relevant selection criteria and there are no grounds for disqualification from the procedure. According to Art. 67, para. 1 of the PPA when submitting a tenderthe participant declares a lack of grounds for removal from the procedure and compliance with the selection criteria by presenting the ENEOP. Where the participant is a grouping which is not a legal entity, a separate ENDED shall be submitted for each member of the consortium when submitting the tender. Where a participant has indicated that it will use subcontractors and / or third parties when submitting a bidfor each of them a separate eEEDOP shall be presented. Documents demonstrating the information specified in the enEEDOP may be required additionally under the conditions of Art. 67, para. 5 of the Public Procurement Act. According to Art. 67, para. 6 of the Public Procurement Act before the conclusion of a public procurement contract, the tenderer designated as a contractor shall submit up-to-date documents certifying the absence of the grounds for removal from-procedure and compliance with selection criteria. Documents are submitted by any member of the grouping that is not a legal entity and subcontractors and third parties, if any. Participants can obtain the necessary information on the obligations relating to taxes and social security, environmental protection, employment protection and working conditions in the country that are in force and relevant to the subject matterand the order as follows: - taxes and social security - NRA, www.nap.bg/, - environmental protection - MOEW, www.moew.government.bg /, - employment protection - EA, https: /www.az.government.bg/ - the working conditions in the country IA GIT, www.gli.government.bg/.- When signing the contract the participant, for a contractor, provides a guarantee for the performance of the contract at a rate of 5% of the valueof the contract without VAT. The guarantee for securing the execution of the contract, respectively. the guarantee for advance payment. payment shall be made in one of the following forms: (a) unconditional, irrevocable bank guarantee in the original; or (b) a cash amount paid into a current account of NRIC, certified by a payment order; or (c) insurance that provides for the performance of the contract or can ancillary means through coverage in the original. When the collateral guarantee. fulfilled. the contract is provided in the form of a bank. warranty or insurance, their term of validity should be the term of the contract plus 30 days. Terms and conditions for detention and release. of the performance guarantee. are governed by the contract for the award of the OP. The warranty that provides advancewith. funds shall be valid until their recovery and shall be up to 3 days after the return or drawdown of the advance The total estimated value of the order includes 10% for unforeseen Internet address (URL): http://www.rail-infra.bg
The bid deadline for Contract notice: Construction work for bridges and tunnels, shafts and subways was 26 Oct 2018. Bidding is closed.
This tender has been issued by ???????? ??????????? „?????????? ???????? „??????????? ??????????????“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45221000 - Construction work for bridges and tunnels, shafts and subways.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 26907790. The purchaser document reference is 407335-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.