Expired Tender Bulgaria ICB TOT Ref. 42952757

Contract notice: Construction work Tender in Bulgaria - 42952757

Tender notice from Bulgaria, published on 19 May 2020.

Executive Summary

The „ВОДОСНАБДЯВАНЕ И КАНАЛИЗАЦИЯ“ ЕАД — БУРГАС has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 19 May 2020 and is scheduled to close on 29 Jun 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 42952757, while the tender notice number is 230349-2020 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
42952757
Document Ref. No.
230349-2020
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
19 May 2020
Bid deadline
29 Jun 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45000000
CPV Description: Construction work.
Engineering - design and construction of the site "Reconstruction of the water supply network of Izgrev, Zornitsa, Central City Hall, Acacias and Pobeda, Burgas"
Reference Number: ID №438
Engineering - design and construction of the project "Reconstruction of the water supply and sewerage network of Izgrev quarter, Zornitsa quarter, Central City Hall, Acacias quarter and Pobeda quarter, Burgas", included in the project "Integrated water project forBurgas region ".
Main Site: The territory of the city of Burgas: Izgrev quarter, Zornitsa quarter, Central City Hall, Acacias quarter and Pobeda quarter.
Subject of the contract includes design and construction of 12 150 m water supply network and 2 020 m sewerage network, as well as the facilities to them, in Izgrev quarter, Zornitsa quarter, Central City Hall, Acacias quarter and Pobeda quarter, Burgas, including:
- Review and analysis of the available project documentation for planningactivities, as well as bringing it in line with the current Bulgarian norms for design and construction, the Spatial Development Act and the bylaws on its implementation,
- Preparation of an investment project in the technical design phase according to Ordinance № 4 of 21.05.2001 on the scope and the content of the investment projects, the Spatial Development Act and the by-laws on its implementation,
- Coordination ofthe project with all control bodies, operating companies and institutions according to the requirements of the normative base,
- Obtaining all necessary opinions and permits according to the Bulgarian legislation,
- Ensuring the conformity assessment of the investment project,
- Obtaining a construction permit and legal start of construction,
- Execution of construction-assemblyworks and any other accompanying and related activities necessary for the execution of the construction, in accordance with the regulatory requirements, the requirements of the contracting authority, the drawings and tables,
- Implementation of author`s supervision under the Spatial Development Act, technical solutions, modifications and amendments to the project, technological control and assistance in putting the site into operation;
- Preparation of an executive todocumentation, cadastral survey of the entire construction and submission to the relevant service of geodesy, cartography and data cadastre according to Art. 54a, para. 2 of the Law for the cadastre and the property register,
- Training of the personnel of the assignor, monitoring and support of the operation and maintenance of the site,
- Handing over of the site and its acceptance by the assignor, with act form 15 under Ordinance № 3 of 31 Julyand 2003 for drawing up acts and protocols during the construction and Certificate for acceptance by the engineer,
- Samples after completion,
- Putting the site into operation with a protocol form 16 Ordinance № 3 of 31 July 2003 for drawing up acts and protocols during the construction (without the issuance of form 16 to be included in the time for completion),
- Period for notification and removal of eeffects - monitoring of the processes, reaching the design parameters and assisting the staff in the operation and maintenance of the newly built elements of the site;
Participants should be entered in an appropriate professional register and, for non-residents, in similar registers in accordance with the legislation of the Member State in which they are involved.
Minimum requirement: the participant must have legal capacity to perform constructions of the second category, fourth group, according to the Regulations for entry and maintenance of the Central Professional Register of Builders, and for a foreign person - to be entered in a similar register according to law of a Member State of the European Union in which it is established or of anothera state party to the Agreement on the European Economic Area or the Swiss Confederation and the same to have the right (according to its national legislation and under the conditions of mutual recognition) to perform the subject of the contract. Foreign economic operators can prove the right to perform the respective activity with equivalent documents according to the legislation in the state
When submitting the bid, the bidder declares its compliance with the selection criteria by submitting an ESDP - in Part IV, Section A "Suitability", field "Entry in the relevant professional register" of the ESDP shall provide the relevant information.
In the cases under Art. 67, para. 5 and / or Art. 112, para. 1, item 2 of the Public Procurement Act, the following documents shall be submitted, with which compliance shall be provedwith the set selection criteria, namely a certified copy of a certificate of registration in the CPRS, and for a foreign person - a certified copy of a certificate for one-time or temporary construction service for a specific construction on the territory of the Republic of BULGARIA, or equivalent document certifying the right to carries out such activity, issued by a competent authority of a Member State of Europethe European Union or another country party to the Agreement on the European Economic Area or equivalent (the requirement must be fulfilled by the selected contractor before the conclusion of the contract). The participant should for the last 3 (three) completed financial years have realized a minimum total turnover, calculated on the basis of the annual turnover for 2017, 2018 and 2019
2. ParticipantThe IC should have insured its professional responsibility for design and construction.
All communications and actions of the contracting authority and the participants related to this procedure are in writing, and the deadlines are calculated in accordance with Art. 28 of the Public Procurement Act (it should be borne in mind that the record keeping system, fax and e-mail of the contracting authority are not "an automated system for electronicThe exchange of information between the assignor and the participant is carried out in one of the following ways:
- in person - against signature,
- by fax, at the number indicated by the participant in EEDOP,
- by courier service,
- by e-mail - to the e-mail address indicated by the participant in EEDOP, electronically under the conditions and by the order of the Law for the electronic document and the electronic certification services (ZEDEUU).The message sent by electronic means shall be considered received, regardless of whether a confirmation of its delivery has been generated, from the moment of its receipt in an information system, individualized by the e-mail address indicated by the participant. In order to ensure legal certainty and to avoid disputes about the fact and time of receipt, participants should set up the e-mailour mailboxes to generate an automatic message delivery notification. Regardless of whether such settings are made or not, Art. 10, para. 1 of ZEDEUU - from its receipt in the e-mail of the participant,
- by a combination of these means - the date of receipt is considered the first occurred.
Internet address (URL): http://www.vik-burgas.com

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 29 Jun 2020. Bidding is closed.

This tender has been issued by „ВОДОСНАБДЯВАНЕ И КАНАЛИЗАЦИЯ“ ЕАД — БУРГАС in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 42952757. The purchaser document reference is 230349-2020.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.