Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45112710, 45221250, 45231300, 45233120, 45233125, 45233141, 45233142, 45233162, 45233228, 45233260, 45247112, 71320000, 45000000, 45112710, 45221250, 45231300, 45233120, 45233125, 45233141, 45233142, 45233162, 45233228, 45233260, 45247112, 71320000
CPV Description: Construction work.
Landscaping work for green areas.
Underground work other than tunnels, shafts and subways.
Construction work for water and sewage pipelines.
Road construction works.
Road junction construction work.
Road-maintenance works.
Road-repair works.
Cycle path construction work.
Surface coating construction work.
Pedestrian ways construction work.
Drainage canal construction work.
Engineering design services.
Framework agreement for construction work, Dunakeszi
Reference Number: EKR000156332020
Framework agreement for Dunakeszi Varos County Council co-management area for construction works for construction works for construction works. task (ES) planned quantity:
- Construction of complete pavement pathway or wheelbarrow
22, 500 m2
- Detection of existing carboxylic acid on existing pavement
2, 000 m2
- Local repair of asphalt pavement with rolled asphalt pavement
7, 000 m2
- Repair of asphalt pavement with rolled asphalt pavement
25, 000 m2
stone pavement pavement test
2 000 m2
- Concrete stone pavement pavement
4 000 m2
- Koezvilagiconstruction of tasi candelabras
50 pcs
- Complex installation of highway junction with traffic light opening 2 pcs
- Renovation, development of parks, parks
- D 1800 vb. gravity trench channel - 365.5 m
- D 1000 b gravity trench channel - 1762.5 m
- D600 b trench channel structure - 232 m
With the help of the ETC, the task is provided by the other AT servicesasaval (additional planning, additional licensing),
For the commencement of the construction, the necessary concessions are for the purchase of the works, the provision of the time power is very good, the winner of the AT is able to gain all the benefits, a pre-event event, an average net of 1, 000, 000, 000 to 2, 000, 0000 0000 HUF oessz. capacity, planned number: min. 40 pieces
b) (KM): Maintenance, refurbishment, accident prevention, emergency response to the accident, perceived disaster on the campsite, acceptance of immediate order to be accepted where the aThe following signs:
- Katyu
- Koezvilagitas
- Arok not functional enough
- Accident risk yard
- Accident risk wheelbarrow
- Team duct
- Team diverter pivot
- Kidoentoett pillar, table
- Park and zoeldteruelet problem
- Other
KMs are typically, but not exclusively, overwhelming with AT`s assertive, self-updating daily databaseAs a result, the AT is responsible for monitoring this on a daily basis. error-correcting intervention should be done in 24 hours. 250 pcs.
AT is optionally, but not exclusiven, with immediate intervention in the case of affirmative error handling, the distress of the activity also exposes to work hours on Thursdays, Saturdays, Sundays, days before, and at night. AT does not qualify for a dij or co-pay allowance on Saturday, Sunday, Monday, night and night in the performance forest.not only does it fulfill the EPC implementation, but, in addition, during the long byte relationship with the AK, it must be continuously available to perform individual jobs of unknown amount and time. you need to be able to get enough (at the same time) (about 8-10 pcs) at a timeie, simultaneous submission of parallel work, additional KM and / or individual quotation and / or coordination of execution works, simultaneous execution of KMs and EPs. the exact geodetic survey of the completed co-works, and the documentation of the AK, the documented and corrected camera water prior to the work on the queue networkpreparation of the work, documenting the working area and the skids before commencement of construction, identification of the caused arms.
Jotallas Duration: Minimum 12 months. contracted (technical) atadas-avel-s resultant lezardate of entry
Cannot be AT, sub-contractor, and may not be certified in the suitability of an economic operator who is a Kbt. - 62 (1) - (2), is subject to the exclusion criteria. The AT must confirm in advance by entering the EKKD that it is not subject to the exclusion grounds, the certificates shall be exclusive to AK Kbt. 69. (4), must be submitted in accordance with Section 321/2015. (X.30.) Korm. (hereinafter referred to as "Kr."). The Kbt. Pursuant to Article 67 (4), the AT must declare that it will not use the sub-contractor for the performance of the contract. (ECR form) Attached to the 2017 LIII. Presentation of the names and residences of each of its owners, as defined in Section 3 (38) (a) to (b) or (d) of the Criminal Code (hereinafter: Pmt). Hif the economic operator is not the legal owner of the penzmosasrol wine license in accordance with - 3 (38) (a) to (b) or (d), a statement to this effect shall be attached. (- 8 (i) (ib) and - 10 (g) (gb) (gb) of the Government Decree) (ECR form). The Kbt. With respect to Article 62 (1) (k) (kc), the AT statement shall be attached as to whether or not there is a legal person orrint is a legal entity with more than 25% ownership or voting rights in the AT, either directly or indirectly; if it is, the AT states it in a statement (company name, headquarters), further declares that the Kbt. The exclusion clause referred to in - 62 (1) (k) (kc) is not all fulfilled (-- 8 (i) (ic) and 10 (g) of the Cr.(gc); (EKR Form)
The Kbt. Article 74 (1) (b) shall exclude from the procedure the AT, subcontractor or the organization certifying the suitability, which has been excluded during the procedure. thereof. The Kbt. -- 64 (1) - (2) es -- 3 (2) - (5), - 15 - (1) - (2)
For exclusion reasons, sales before the start of the co-purchaseSuch certificates may be retrieved for as long as the content of the breed or data contained in the certificates is correct. Unless proven otherwise, the data is validated by the tenderer in a statement to this effect by the tenderer.the aptitude for conducting professional and security activities. the sub-contractor or other entity (person) purchasing the certificate is not registered in the company registry or the register of the individual business; is not registered in the case of a non-Mo economic operator014/24 / EU iranyelv XI. or (b) any economic entity carrying out construction work in the construction industry fails to comply with the provisions of the Act on the Construction of Buildings, or of the construction industry, and the non-established economic roleIn the case of shooters, a certified statement of competence in the register of the country of establishment or in the country of establishment of the establishment, license or organization, or chamber of association.
.
(a) Host on Mog) in the case of an economic operator not established in Mo, in the case of an economic operator not established in Mo; a certificate (extract) or other certificate or statement in accordance with the records listed in Attachment 1 shall be provided.to verify in a substantiated manner that the Applicant (hereinafter referred to as "AT") meets the aptitude requirements specified by the Applicant (hereinafter referred to as "AK"). Sufficient IV. Kbt. Article 69 (4) requires the person called to justify it, as follows:
P / 1 Article 19 (1) of the Cr. (b) claim that he or she is entitled to one or three business years prior to the engagementhis predecessor has prepared a report in accordance with accounting laws, depending on when the AT came into operation or commenced operations, provided that this information is available., because after the beginning of the period she started an artificial experiment, AT is suitable ifthe net revenue from the execution of the renovation and maintenance works for the construction or construction of the construction site amounts to more than $ 1, 000, 000. .19 (1). c) According to the attachment must be in the form of a statement declared by the cloudfor the business year prior to the exercise, the extent to which the epitope capitol and its epitope upgrades and maintenance work is derived from the net net income and the total net income, depending on when and when the AT has received these data.
If AT with the document in P.1 or P.2 azert does not have one because it operates in a legal form which is not feasible with regard to submitting the required documents, it may prove its suitability by any other document deemed suitable by AK, instead of the appropriate certificate. The AT`s search for additional information proves that it works in a legal form that imprints on AK`s recordsit is not possible to seek information on the modality of eligibility accepted by AK in place of the required verification modality.
submitting a certificate is not required, howeverthis dogfood - along with the locations of the dogfood and the appropriate supporting document - should be referenced in the EEKD, if it is not possible, indicated in the Kueloen arrow attached to the offer.
proves that the host. acted on the occasion. Co-op AK is the electronically available office of qualified ATsa well-listed breed or a certificate from an organization listed on an official list of ATs recognized by its location in another EU Member State, accepts if not given in the EECD any possible statement to this effect must be included in the statement, indicating what it isIn case of records and data, and in case of electronic records, what is the reason for the agreement warehouse, building materials and machine storage, guarded premises, office, warehouseEthical physical and control staffing is possible with the development of temporary epuelets providing social care. All of these events are created, operationalized, and the resources provided to the colleges are covered by a single set of framework agreements for the winner of the AT. The case of Koezoes ATit must be accompanied by an agreement on joint and several liability. 2 / The quotation shall include a reading sheet, EEKD, and shall state in accordance with - 66 (2), - 65 (7), - 67 (4), a. - 62 (1) para. k) kb) and k) kc) (ECF forms). 3 / HP new host introduced. will not have a new hp. (Kbt. 71 - (6)). 4 / AK the Kbt. - 81 (5). 5 / Contact in Ireland: Kbt. Section 41-a es a 424/2017. (XII. 19.) Reg. According to. 6 / A IV.2.6) The time trial benefit is correctly 60 days. 7 / FAX: dr. Deak Krisztina00235 Deak Uegyvedi Office 7100 Szekszard, Jokai u.
[email protected] 8 / Kueloenboizer foreign currencies: Callers must give up their exchange rates on a daily basis, as determined by a large MNB. 9 / Iranyado law and time: Hungary iranyado. 10 / AK no alapply the Kbt. 75. - (2) (e) -t. 11 / In a river., registered. in this case, you must arrow and attach the item submitted to the company., registered. love, the truth is true
12 / AT / app. ig buyer host. named alairo cegalairas statement / Ctv. 9 of the sample. Term person / individual / kuelfoeldi AT: matching document
13 / AT, . to customers, if not available on www.e-cegjegyzek.hu, attach a company extract not older than 60 days from the attachment deadline
14 / Offerings: $ 50 million Bef. place: Dkeszi Varos OeK, Fő u. 25. Otp Bank 11784009-15731247
15 / Score: 0-10: 1st Modes: 1-3. straight gold. P = [Tested / Best] x Pmax # 3 gold. # 4 :: Reverse Gold. P = [Best / Qualified]x Pmax.
The ar 2: a) Exercise of the "Epitimate or epithelial refurbishment work" unit (60 suly) and b) Exercise "Maintenance, refurbishment or power plant" subassembly of the unit (10 suly) will also examine some of the verbs from kueloen-kueloen from the point of view of the term ar alatamasztottsaga.
16 / Attach professional report:
17 / The single swaps change automatically as follows (as of April 1, 2021): Ai = 0.8 * EPai 0.2 * ∆MMER
Legend in Koezeb Dock:
Rationale for agreement over 18/4 years: The AK is more technically lean or wholehearted, but timelydesigning a cost-effective, long-lasting investment is required, with uniform sections (technical content, warranty terms, single utilities, etc.) required. One example is the implementation of the Dunakeszi Wheeled Koerut (
10 km of the oenallo wheelbarrow;
1 km on the existing pavement display). AK wants the wheelbarrow to fit in more visual, technical contentNIF ZRT, currently in pre-production status. EUREVELO 6 in the field of clothing to the wheelbarrow to which it is attached. Thus, the construction of the wheeled dog canal is the production of a series of landscaped items, the preparation of the plans of the licensors, the preparation of the construction design documents, the earliest of which is the EUROVELO 6. according to your plans for the design of the wheelbarrow, according to csunlock points can start off - Preparing the licensing plans, obtaining the licenses - after consulting - the execution of the contractor, and the subsequent execution work, probably do not know the framework. from six. For 48 months, Beluel will come to fruition. Thousands of technical hosts. aspects of the Berkeley KoeleI would like to justify trying a framework agreement for a longer period of time.
19. / system case system and electronic coezeb. the legal person providing the service must comply with the requirements of the Public Service Act and Act 424/2017. (XII.19.) Corporal rend. Section 2 (2) - (5). (M1.2)
Internet address (URL): http://www.dunakeszi.hu