Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45246000, 45223500, 45240000, 45100000, 45262520, 45262510, 45261000, 45453000, 45247100, 45111000, 45262200, 45000000, 45246000, 45223500, 45240000, 45100000, 45262520, 45262510, 45261000, 45453000, 45247100, 45111000, 45262200
CPV Description: Construction work.
River regulation and flood control works.
Reinforced-concrete structures.
Construction work for water projects.
Site preparation work.
Bricklaying work.
Stonework.
Erection and related works of roof frames and coverings.
Overhaul and refurbishment work.
Construction work for waterways.
Demolition, site preparation and clearance work.
Foundation work and water-well drilling.
Przeconstruction of buildings on the Nickulina stream in the Nickulina forestry and on the Śmierdzący stream in the Gawłowski forestry in the Ujsoły Forest District
Reference Number: S.270.1.2020
1. The subject of the order is the reconstruction of buildings on the Nickulin stream in the Nickulin forest and on the Śmierdzący stream in the Gawłowski forestry within the Forest District Ujsoły implemented under the Operational Program Infrastructure andEnvironment in the financial perspective 2014 2020.
Main Site: Milowka commune, registration unit / precinct: 241709_2 / 0003 Milowka, plot numbers 9005 and 9010/3,
The subject of the contract includes the reconstruction of buildings on the Nickulin stream in the Nickulin forest, including in particular:
- construction of a stone rapids above the existing dam,
- construction of a stone coating in the slopes above the existing dam,
- budthis stone coating reinforced with concrete in the slopes above the existing dam,
- demolition of the existing anti-stain dam, liquidation of damming,
- construction of a reinforced concrete abutment with a frame bottom outlet in the place of the demolished dam,
- construction of a stone rapids with increased roughness between the bridge and the bridge with the bottom outlet,
- renovation of existing stone walls,
- renovation existingstone bridge with traditional masonry techniques (renovation of the vault, bottom, abutment),
- construction of strengthening of the fragment of the slopes and the bottom of the ditch flowing above the bridge with stone paving,
- cutting of the stone wall below the bridge on the right bank,
- cutting of wood porridge on the right bank,
- building of stone and stone porridge on the right bank,
- building of strengthening porridge in the form of bowsstone paving,
- construction of a retaining stone wall on the left bank below the stone bridge,
- demolition of the stone threshold below the stone bridge,
- construction of the stone rapids below the stone bridge,
- construction of the rapids protection in the form of a wooden palisade,
- construction of piles to secure the passage .
A detailed description of the subject of the contract is included in the project documentation constitutingAnnex No. 1.1. to the Terms of Reference, containing in particular: construction design, detailed designs, bill of quantities and technical specifications for the execution and acceptance of the works (STWiOR). who are not subject to exclusion from the procurement procedurein the circumstances referred to in art. 24 paragraph 1 point 12 23 Public procurement law.
The awarding entity does not specify the grounds for exclusion referred to in Art. 24 paragraph 5 Public Procurement Law.
1. The Awarding Entity does not impose specific requirements as to the description of compliance with the condition of participation in the procedure with respect to the condition regarding economic viability.
2. Condition for financial situationj, will be met if the Contractor demonstrates that it has the financial means or credit standing not less than:
2.1. for lot 1 of the contract Reconstruction of buildings on the Nickulin stream in the Nickulin forestry PLN 530, 000.00,
2.2. for lot 2 order Reconstruction of buildings on the Śmierdzący stream in the Gawłowski forestry PLN 440, 000.00.
3. The Employer will call the Contractor, whose offer will remainrated highest, to be submitted within a period of not less than 10 days, valid as at the date of submission of the following documents in order to demonstrate compliance with the condition regarding the financial situation: Information of the bank or cooperative savings and credit union confirming the amount of financial resources or creditworthiness of the Contractor, within not earlier than 1 monthd after the submission deadline. If, for a justified reason, the Contractor cannot submit documents regarding the financial or economic situation required by the Employer, he may submit another document that sufficiently confirms the fulfillment of the condition of participation in the procedure described by the Employer.
4. If the amounts required in the documents listed in point 6.2.2. SIWZ, expressthe wives will be in a currency other than PLN, the Purchaser will convert them into PLN at the average exchange rate of the National Bank of Poland on the day on which the contract notice was published in the Official Journal of the European Union. If, on the day of publication of the contract notice in the Official Journal of the European Union, the National Bank of Poland does not publish a table of exchange rates, the Employer will adopt a conversion rate according tothe latest NBP exchange rate table, published before the date of publication of the contract notice in the Official Journal of the European Union.
5. In order to confirm compliance with the conditions for participation in the procedure, the Contractor may rely on the technical or professional abilities of other entities, regardless of the legal nature of the legal relations linking it, after fulfilling the conditions set out in Art. 22aPublic procurement rights.
6. The Contractor, which relies on the abilities of other entities, must prove to the Employer that in carrying out the contract, he will have the necessary resources of these entities, in particular, presenting the commitment of these entities to make available to him the necessary resources for the purposes of the contract. The obligation referred to in the sentence above Contractor seeis bound to submit electronically with the offer.
1. In accordance with art. 10a paragraph 1 Public Procurement Law, in the present proceedings, communication between the Employer and Contractors takes place using electronic means of communication referred to in art. 2 point 17 of the Public Procurement Law.
2. The Contractor attaches to the offer a current statement on the day of submitting the offers in the form foform of the Single European Order Document (hereinafter EAT). The Contractor submits the EAT with the offer via the "Form for submitting, changing, withdrawing the offer" available on ePUAP and also made available on the miniPortal, in accordance with point 7. of the Terms of Reference.
3. Other communication (including calls, supplements, clarifications) will be held using the Contractor`s e-mail account and mailbox:
[email protected].
4. The Ordering Party shall call the Contractor whose offer has been rated the highest to be submitted within a period not shorter than 10 current days as at the date of submission. statements and documents confirming the absence of grounds for exclusion:
4.1. information from the National Criminal Register in the scope specified in art. 24 paragraph 1 point 13, 14 and 21 of the Public Procurement Law, issued not inmore than 6 months before the submission deadline;
4.2. the Contractor`s statement that he has not issued a final court judgment or final administrative decision regarding late payment of taxes, fees or social security or health insurance contributions, or in the case of such a judgment or decision of documents confirming payment of these amountstogether with any interest or fines, or concluding a binding agreement regarding the repayment of these debts;
4.3. the Contractor`s statement of the lack of a decision against him as a precautionary measure forbidding public procurement;
4.4. Contractor`s declaration of non-payment of local taxes and fees, as referred to in the Act of January 12, 1991 on Taxes and Oplocal patches (Journal of Laws of 2018, item 1445).
5. Requirements for submitted documents and statements are set out in the Regulation of the Minister of Development of 26 July 2016 on the types of documents that the Employer may request from the Contractor in the procurement procedure (Journal of Laws of 2016, item 1126, as amended).
6. Pursuant to - 16 of the Regulation of the Minister of Development of 26 July 2016 regardingtypes of documents that the Employer may request from the Contractor in the procurement procedure (Journal of Laws of 2016 item 1126 as amended), documents or statements made in a foreign language are submitted together with a translation into Polish. The interpretation of the content of documents or compound statements in a foreign language together with a translation into Polish will be carried out based on the subject crowdCombine.
7. The proceedings are conducted in accordance with the rules provided for "Reverse procedure", referred to in Article 24aa (1) and (2) of the Public Procurement Law, according to which the Employer will first evaluate the offers and then examine whether the Contractor whose offer has been assessed as the most favorable, is not subject to exclusion and meets the conditions participate in the proceedings.
8. Orderbased on art. 93 item 1a of the Public Procurement Law provides for the possibility of annulling this procurement procedure if funds from the European Union budget and non-refundable funds from assistance granted by the Member States of the European Free Trade Agreement (EFTA), which the Awarding Entity intended to spend on financing the whole orparts of the order will not be awarded.
9. The Employer requires Contractors to lodge a security deposit in the amount of respectively in parts of the contract:
9.1. for lot 1 Reconstruction of buildings on the Nickulin stream in the Nickulin forestry PLN 12, 000.00;
9.2. for part 2 Reconstruction of buildings on the Śmierdzący stream in the Gawłowski forestry PLN 10, 000.00.
Under the conditions specified in point 9 of the ToR.
Internet address (URL): www.katowice.lasy.gov.pl/ujsoly/index.php