Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45314310, 45421100, 45262100, 45332000, 45100000, 45332200, 45315700, 45232130, 45232150, 45315600, 45331100, 45317300, 45310000, 45443000, 45312300, 45231220, 45223100, 45262120, 45261320, 45312310, 45320000, 45262110, 45223500, 45230000, 45333000, 45330000, 45231600, 45200000, 45231300, 45315300, 45211000, 45314000, 45111291, 45112100, 45311200, 45110000, 45324000, 45300000, 45312000, 45410000, 45311100, 45400000, 45331000, 45233000, 45262500, 45421152, 44130000, 45111300, 45232423, 45262522, 45316100, 45314300, 45331210, 45442100, 45351000, 45311000, 45315100, 45111100, 45450000, 45000000, 45314310, 45421100, 45262100, 45332000, 45100000, 45332200, 45315700, 45232130, 45232150, 45315600, 45331100, 45317300, 45310000, 45443000, 45312300, 45231220, 45223100, 45262120, 45261320, 45312310, 45320000, 45262110, 45223500, 45230000, 45333000, 45330000, 45231600, 45200000, 45231300, 45315300, 45211000, 45314000, 45111291, 45112100, 45311200, 45110000, 45324000, 45300000, 45312000, 45410000, 45311100, 45400000, 45331000, 45233000, 45262500, 45421152, 44130000, 45111300, 45232423, 45262522, 45316100, 45314300, 45331210, 45442100, 45351000, 45311000, 45315100, 45111100, 45450000
CPV Description: Construction work.
Installation of cable laying.
Installation of doors and windows and related components.
Scaffolding work.
Plumbing and drain-laying work.
Site preparation work.
Water plumbing work.
Switching station installation work.
Storm-water piping construction work.
Works related to water-distribution pipelines.
Low-voltage installation work.
Central-heating installation work.
Electricalinstallation work of electrical distribution apparatus.
Electrical installation work.
Facade work.
Antenna installation work.
Construction work for gas pipelines.
Assembly of metal structures.
Scaffolding erection work.
Guttering work.
Lightning-protection works.
Insulation work.
Scaffolding dismantling work.
Reinforced-concrete structures.
Construction work for pipelines, communication and powerlines, for highways, roads, airfields and railways; flatwork.
Gas-fitting installation work.
Plumbing and sanitary works.
Construction work for communication lines.
Works for complete or part construction and civil engineering work.
Construction work for water and sewage pipelines.
Electricity supply installations.
Construction work for multi-dwelling buildings and individual houses.
Installationof telecommunications equipment.
Site-development work.
Trench-digging work.
Electrical fitting work.
Building demolition and wrecking work and earthmoving work.
Plasterboard works.
Building installation work.
Alarm system and antenna installation work.
Plastering work.
Electrical wiring work.
Building completion work.
Heating, ventilation and air-conditioning installation work.
Construction, foundation and surface works for highways, roads.
Masonry and bricklaying work.
Installation of partition walls.
Sewer mains.
Dismantling works.
Sewage pumping stations construction work.
Masonry work.
Installation of outdoor illumination equipment.
Installation of cable infrastructure.
Ventilation installation work.
Painting work.
Mechanical engineering installation works.
Electrical wiring and fitting work.
Electrical engineering installation works.
Demolition work.
Other building completion work.
Execution of construction works consisting in thermomodernization of the building, with liquidation of low-emission sources of a residential building at ul. Dworcowa 21 in Knur-w as part of the task invest .: Thermomodernization ...
Reference Number: ZP.271.2.10.2020
Subject of the contract includes the execution of construction works afterlying on the thermo-modernization of the building, with the liquidation of low-emission residential building at ul. Dworcowa 21 in Knur-w as part of the investment task: Thermomodernization of historic buildings of Old Knur-w with the elimination of low emission sources.
Main Site: Knurow
1. The subject of the contract includes the execution of construction works consisting in thermomodernization of the building, with the liquidation of low emissions of the shackresidential area at ul. Dworcowa 21 in Knur-w as part of the investment task: Thermomodernization of historic buildings of Old Knur-w with the elimination of low emission sources.
Taking into account the proper operation of the building in the future, the implementation of:
1) demolition works related to the building`s thermomodernization;
2) construction works related to thermo-modernization building,
3) construction workrelated to the elimination of coal heating and gas installation, central heating, hot water and mechanical ventilation;
4) other construction works.
2. Scope of works:
1) demolition works related to building thermomodernization;
2) construction works related to building thermomodernization;
3) construction works related to gas installation, central heating, hot water installation and mech ventilationaniczna;
4) other construction works.
3. The detailed scope of the subject of the contract is specified in the design documentation and technical specification of execution and acceptance of the robot, bill of quantities and the arrangements resulting from the contract template.
4. In the event of a discrepancy between the bill of quantities and the design documentation, the Contractor is obliged to accept the data from the design documentation.
5. The Contractoris obliged to read the Terms of Reference and its attachments and complete the order on the terms and conditions described in them.
6. The use of equipment and equivalent materials is allowed wherever the subject of the order is described in the design documentation by means of trademarks, patents or origin, source or specific process that characterizes the products or services providedby a particular contractor.
7. All parameters, including technical and operational parameters as well as functional parameters of devices and materials used by the contractor during the performance of the contract must meet the requirements specified in the project documentation. Providing device types and manufacturers` names should be treated as examples
The Contractor is excluded from the procurement procedureunion to which any of the circumstances referred to in art. 24. paragraph 1 point 12-23 of the Public Procurement Law, in addition, when the circumstances referred to in art. 24. paragraph 5 point 1 Public Procurement Law, art. 24. paragraph 5 point 8 Public Procurement Law
1. The Contractor submits, in confirmation of the abovementioned circumstances:
a) information from the National Criminal Register in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the Public Procurement Law
b) certificatethe proper head of the tax office confirming that the Contractor is not in arrears with taxes, issued not earlier than 3 months before the deadline for submitting bids, or another document confirming that the Contractor has entered into an agreement with the competent tax authority regarding the repayment of these receivables together with any interest or fines in particular obtained providedrelease, deferment or installment of overdue payments by law, or suspension in full of the execution of the decision of the competent authority
c) certificate of the competent organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the Contractor is not in arrears with social security contributions or hEALTHe, issued not earlier than 3 months before the deadline for submission of bids, or other document confirming that the Contractor has entered into an agreement with the competent authority on the repayment of these receivables together with any interest or fines, in particular, he obtained the exemption, deferment or installment provided for by law outstanding payments or withholding in full ddecision of the competent authority
d) an excerpt from the relevant register or from the central register and information on economic activity, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 item 1 of the Public Procurement Law
e) the contractor`s declaration that he has not issued a final court judgment or final administrative decisionon arrears with the payment of taxes, fees or social security or health insurance contributions or - in the event of such a judgment or decision - documents confirming the payment of these receivables together with any interest or fines or the conclusion of a binding agreement on the repayment of these receivables
f) a statement contractors on the lack of a decision against him in the titlea preventive prohibition to apply for public procurement
g) a statement by the contractor not to pay taxes and local fees, referred to in the Act of 12.1.1991 on local taxes and fees
h) a declaration of belonging or not belonging to this the capital group itself, referred to in Article 24 (1) 1 point 23 Public Procurement Law, within 3 days from the day of posting on the websiteweb information from the opening of offers
2. The Contractor, which relies on the abilities or situation of other entities on the principles set out in Article 22 of the Public Procurement Law, is required to submit in relation to these entities the documents listed in point a) to g)
3. If the Contractor has its registered office / place of residence outside the territory of the Republic of Poland, instead of the documents listed in pointa) to d) submits other equivalent documents detailed in chapter 5 para. 2 point 2 of the ToR
4. If in the country where the contractor has its registered office / place of residence / place of residence there is a person to whom the document relates, no documents referred to above in point a) to d), are replaced by a document containing the contractor`s statement, indicating the person or person authorizedto his representation / statement of the person to whom the document was to be submitted, submitted to a notary public / before the court, administrative or professional / economic self-government body competent for the registered office / place of residence of the contractor / place of residence of that person
The contractor confirming the following circumstances, about referred to in art. 25 paragraph 1 point 1 of the PPL Act consists of:
a) docparts confirming that the Contractor is insured against civil liability in the scope of conducted activity related to the subject of the contract for the sum insured specified by the Employer in Chapter 4 paragraph 1 point 2) lit. a) ToR, i.e. at least PLN 300, 000.00. In the case of Contractors jointly applying for the order, these documents shall be submitted by at least one of the Contractors or maysubmit one joint document confirming that all Contractors are insured against civil liability in the scope of conducted activity related to the subject of the contract with a value not less than specified in Chapter 4 para. 1 point 2) lit. a) ToR. If for a justified reason the contractor cannot submit the documents required by the contracting authority referred to above when orderingy allows the contractor to submit other documents referred to in art. 26 section 2 of the Public Procurement Law,
b) information from the bank or cooperative savings and credit union confirming the amount of financial resources or creditworthiness of the Contractor specified by the Employer in Chapter 4 paragraph 1 item 2) lit. b) ToR, i.e. at least PLN 500, 000.00, not earlier than 1 monthbefore the submission deadline. In the case of Contractors jointly applying for the contract, the Employer requires that a document confirming the amount of financial resources or creditworthiness submitted by at least one of the Contractors. If, for a justified reason, the contractor cannot submit the documents required by the contracting authority referred to above, he will orderthe contractor allows the contractor to submit other documents referred to in art. 26 section 2 Public Procurement Law
If the documents referred to above in point a), b) will indicate values in a currency other than PLN, the Contractor should make a conversion into PLN at the average exchange rate of the National Bank of Poland on the day on which the contract notice was published in the Official Journal of the European Union (EU Journal of Laws). In the case oftowards when, in the documents referred to above in point a), b) values in a currency other than PLN will be indicated by the Contractor, these values will be converted into PLN according to the average exchange rate of the National Bank of Poland on the day on which the contract notice was published in the Journal of Laws The EU. If on the day of publication of the contract notice in the OJ The EU will not publish the NBP exchange rate table, it will be accepted for conversionPLN exchange rate from the last published NBP exchange rate table before the date of publication of the contract notice in the Official Journal The EU.
1. The Contractor submits the offer via the Form to submit, change, withdraw the offer or application available on ePUAP. The public key necessary to encrypt the offer by the Contractor is available to contractors on the miniPortal or in Annex 9 to the ToR.
2. Method of PLNoffer submission, including encryption of the offer, is described in the miniPortal and ePUAP Instructions for Use (Annex 11 to the ToR). The offer should be submitted in the original.
3. Contractors who jointly apply for the contract (e.g. consortium, civil partnership) submit documents specified in detail in chapter 5 SIWZ.
4. The contractor may confirm compliance with the conditions for participationin proceedings, where appropriate and in relation to a specific contract, or part thereof, rely on the technical or professional capacity or the financial or economic situation of other entities, irrespective of the legal nature of the legal relations with it. In such a situation, the Contractor must prove to the Employer that he will have the necessary at the time of carrying out the contractme the resources of these entities, in particular, presenting the commitment of these entities to make available to him the necessary resources for the purposes of the contract. An example of a third party liability template is Annex 8 to the ToR.
5. Contractor entered in the official list of approved contractors or contractor certified by certification bodies meeting the requirements of europEuropean certification standards may submit a certificate of entry in the official list issued by a competent authority or a certificate issued by the relevant certification body of the country in which the contractor has its registered office or place of residence, indicating the documents constituting the basis for entry or certification, in place of the relevant documents listed in Chapter 5 par. 1 and 2 of the ToR.
6. Youthe bidder entering the tender should submit a bid security of PLN 40, 000.00 (say: forty thousand zlotys) in accordance with the conditions set out in Chapter 11 of the SETC.
7. The awarding entity does not provide:
1) Award of contracts referred to in art. 67, paragraph 1, items 6 and 7 of the Public Procurement Law,
2) Submission of partial and variant offers,
3) Conclusion of a framework agreement,
4) Establishment of a dynamic purchasing system,
5) Selection of the best bid using electronic auction,
6) Settlements in a currency other than the Polish zloty.
8. Specification of the essential terms of the contract with attachments is available on the website: http: //www.knurow.pl//miasto/zamycji_publiczne.html.
9. Employer: Municipal Management of Housing and Administration, ul. Floriana 4, 44-190 Knurow, POLAND. PageOrdering Party`s website: http: //www.mzglia.pl.
10. The procedure for granting this order is conducted by the Employer`s Representative - Knurow Municipality, ul. dr. Floriana Ogana 5, 44-190 Knurow, POLAND (e-mail:
[email protected], URL: www.knurow.pl), acting on the basis of a power of attorney to perform specific actions in the procurement procedure on behalf of and for the benefit of Zamagranted on the basis of art. 15ust. 2 of the PPL Act
11. The procedure for granting this contract is part of the contract with an estimated value above the equivalent of the amount specified in the Regulation of the Minister of Development issued on the basis of art. 11 paragraph 8 of the PZP Act, Thermomodernization of historic buildings of Old Knur-w with elimination of low emission sources.
Internet address (URL): www.knurow.pl