Contract notice: Construction work Tender in Poland - 41208702
Tender notice from Poland, published on 04 Mar 2020.
Exeutive Summary
The PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE - NADLEŚNICTWO CISNA has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 04 Mar 2020 and is scheduled to close on 14 Apr 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 41208702, while the tender notice number is 105776-2020 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45000000, 45112200, 45240000, 45112210, 45246000, 45000000, 45112200, 45240000, 45112210, 45246000 CPV Description: Construction work. Soil-stripping work. Construction work for water projects. Topsoil-stripping work. River regulation and flood control works. "Construction of three small retention reservoirs in the Forests: Solinka, Dołżyca and Zawoj" Reference Number: Z.270.7.2020.ES. The subject of the order is the Execution of the Subject of the Order described in the Description (Design documentation constituting Annex 7 to the SIWZ) of the investment intention under the name "Construction of three small retention reservoirs in the Forests: Solinka, Dołżyca and Zawoj" on the terms specified in the Agreement, in accordance with applicable law, technical and construction regulations, principles of technical knowledge, maintaining the highest professional diligence and guidelines for the Operational Program Infrastructure and Environment 2014-2020 under the Priority Axisytetowa II Environmental Protection, including adaptation to climate change, ie Annex 8 to the ToR `PROJECT IMPLEMENTATION MANUAL - Guidelines for the implementation of tasks and facilities for small retention and prevention of water erosion. A comprehensive project of adaptation of forests and forestry to climate change, low retention and prevention of water erosion. Main Site: Plot No. 232/1, district 0013 Solinka. Solinka forestry. Sa detailed description of the subject of the contract is included in the description of the subject of the contract, i.e. design documentation being Annex 7 to this ToR. The Employer requires employment by the Contractor or subcontractor on the basis of an employment contract, within the meaning of the provisions of the Act of June 26, 1974, the Labor Code (i.e.included in the subject of the contract involving the implementation of the following works: a) Preparing the site for construction (grubbing up bushes and snags, removing the fertile soil layer), b) Earthworks (excavations, embankments, backfills, planting, relocation of earth masses, heap of islands); c) Carpentry works (construction of wooden structures) d) Bottom and embankment insurance works (execution of podsplastering, laying the nonwoven fabric, laying the geomembrane, making fascine reinforcements, making a stone coating, compaction, protection against rodents); e) Cleaning works (clearing the area after the work done, cutting the slopes). The above requirements are also specified in the content of documents related to this proceeding as the "Obligation to Employment". The Employer`s rights in zathe control of the Contractor`s compliance with the Employment Obligation and sanctions for failure to meet these requirements by the Contractor are specified in the contract template attached to this SIWZ. The contracting authority does not require employment on the basis of an employment contract of persons performing independent technical functions in construction, i.e. construction manager. In addition, the Employer does not require employeesand based on the employment contract of natural persons who are the Contractor or subcontractors, conducting sole proprietorship (including in the form of civil law partnerships) or being partners in commercial companies, if these persons personally perform the activities included in the subject of the contract. The ordering party informs that the deadline for completing the order will be from the day the contract is signed until (in the case of a shorter deadline for the performance of the subject of the contract being declared in the offer, the deadline indicated in the Contractor`s offer will be binding) in accordance with the Contractor`s offer, with the proviso that work cannot be carried out on dates excluded by administrative decisions constituting Annex No. 10 of the ToR. In all places of the Terms of Reference or technical documentation in which an exemplary mark was usedin a commodity, patent, origin, source or specific process or if the Employer described the subject of the contract by reference to standards, European technical assessments, approvals, technical specifications and technical reference systems referred to in art. 30 paragraph 1 point 2 and par. 3 of the Public Procurement Law, unless it is justified by the specifics of the subject of the contract, the Ordering Party cannot describethe subject of the contract using sufficiently precise terms, and in each case, acting in accordance with Article 29 paragraph 3 of the Act and art. 30 paragraph 4 of the Act, the Employer allows equivalent solutions, marking such indications or references with the words "or equivalent" or "or equivalent" (including the use of other materials and devices), provided that the parameters are not worsethan those specified in the description of the subject of the contract, as well as the preservation of the technology of implementation, i.e. as a result of a change in material, the technology of implementation may not change, which would result in a change in the technical documentation. The Employer requires a security deposit of PLN 10, 000.00. The Employer requires a performance bond to be provided by the Contractor, whose bid has beenThe best performance guarantee will be 7% of the total price resulting from the given part of the contract. The contracting authority does not provide for the possibility of awarding contracts referred to in art. 67 section 1 item 6 of the PZP. The deadline by which the Contractor will be bound by the submitted offer is 90 days. CONDITIONS FOR PARTICIPATION IN THE PROCEEDING: 1 For awarding the contract in accordance with art. 22 Public Procurement Law Acts mayContractors who are not subject to exclusion in the circumstances referred to in art. 24 paragraph 1 points 12-23 of the PZP Act and in art. 24 paragraph 5 points 1-8 of the PPL Act. Pursuant to the provision of art. 24 paragraph 5 of the Public Procurement Law, the Employer may exclude the Contractor from the public procurement procedure: 1) in relation to which liquidation was opened, in the arrangement approved by the court in the proceedingsthe restructuring plan is to satisfy creditors through the liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 paragraph 1 of the Act of 15 May 2015 - Restructuring Law (Journal of Laws of 2019, item 243, as amended) or whose bankruptcy was announced, with the exception of the contractor who, following the declaration of bankruptcy, entered into an arrangement approved by a final court decisionu, if the arrangement does not provide for satisfaction of creditors by the liquidation of the assets of the bankrupt, unless the court ordered the liquidation of his assets under art. 366 section 1 of the Act of February 28, 2003 - Bankruptcy Law (Journal of Laws of 2019, item 498, as amended); - art. 24 paragraph 5 point 1 of the Public Procurement Law; 2) who grossly violated his professional duties, which undermines his integrity, in particularif the contractor, as a result of the intended action or gross negligence, failed to perform or improperly performed the contract, which the contracting authority is able to demonstrate by means of appropriate evidence - art. 24 paragraph 5 point 2 of the PPL Act; 3) if the contractor or persons referred to in art. 24 paragraph 1 point 14 of the Public Procurement Law, authorized to represent the contractor remain in the relations specified in art. 17paragraph. 1 items 2-4 of the PPL Act with: a) the awarding entity; b) persons authorized to represent the contracting authority c) members of the tender committee; d) persons who have made the declaration referred to in art. 17 clause 2a of the Public Procurement Law, unless it is possible to ensure impartiality on the part of the awarding entity in a way other than by excluding the contractor from participation in the procedure - art. 24 paragraph 5 point 3 of the PPL Act; 4)who, for reasons attributable to him, did not or improperly significantly performed the previous public procurement contract or concession contract concluded with the contracting authority referred to in Article 3 clause 1 item 1-4 of the Public Procurement Law, which led to the termination of the contract or the award of damages - art. 24 paragraph 5 point 4 of the PPL Act; 5) being a natural person whose final convictionsano for an offense against an employee`s rights or an offense against the environment, if for committing a prison sentence, restriction of liberty or a fine of not less than PLN 3, 000 - art. 24 paragraph 5 point 5 of the PPL Act; 6) if an office member of his management or supervisory body, a partner in a public or partnership company or a general partner in a comasingle-parent or limited joint-stock partnership or commercial proxy, the convicted person has been legally convicted of an offense referred to in art. 24 paragraph 5 point 5 of the Public Procurement Law - art. 24 paragraph 5 point 6 of the Public Procurement Law; 7) for which a final administrative decision was issued regarding a breach of the obligations arising from the provisions of labor law, environmental protection law or social security provisions, if a financial penalty was imposed on that decisionnot lower than PLN 3, 000 - art. 24 paragraph 5 point 7 of the PPL Act; 8) which has violated the obligations regarding taxes, fees or contributions, social security or health insurance, which the contracting authority is able to prove by means of appropriate evidence, except in the case referred to in art. 24 paragraph 1 point 15 of the PZP Act, unless the contractor has made payments of taxes, fees or storage dueek for social or health insurance together with interest or fines or has entered into a binding agreement regarding the repayment of these debts - art. 24 paragraph 5 point 8 of the Public Procurement Law the Contractor may rely on the technical or professional abilities or financial standing of other entities, regardless of the legal nature of the relations between them. In such a situation, the contractor must prove he is orderingthat, by carrying out the contract, it will have the necessary resources of these entities, in particular, presenting the undertaking of those entities to make available to it the necessary resources for the purposes of the contract. The document from which the third party`s obligation will arise should clearly indicate the will to provide the Contractor with the order to the applicant, of a given resource, i.e. indicate which resource it concerns, specify its type, scope, time of access and other circumstances resulting from the specificity of a given resource. The content of the document must clearly show: (1) the scope of resources available to the contractor of another entity; (2) how the contractor uses the resources of another entity when performing a public contract; (3) scope and period of participation of another entity in the performance of the public contract; (4) whether the entity, on which the contractor relies in relation to the conditions of participation in the proceedings regarding education, professional qualifications or experience, will carry out the works to which the abilities relate. If the Contractor, demonstrating compliance with the conditions referred to in art. 22 paragraph 1b lipswy Pzp, relies on the resources of other entities on the principles set out in art. 22a paragraph 1 of the Public Procurement Law, the Contractor will be obliged to: 1) submit a third party statement on meeting the conditions for participation in the proceedings (in terms of the condition in relation to which he makes his potential available) and no grounds for exclusion submitted on the EAT form. EAT a third party should be submitted pbefore the expiry of the time limit for submission of tenders, otherwise being in electronic form, accompanied by a qualified electronic signature. 2) submission of a third party commitment or another document serving to demonstrate that the third party has made the potential available to the contractor. Third party commitment or other document used to demonstrate that the contractor has made the potential available to the contractorit should be submitted before the deadline for submission of tenders, otherwise being null and void, in an electronic form with a qualified electronic signature. 3) presentation in relation to these entities of documents listed in point 13.2. point e-m SIWZ. Documents mentioned in point 13.2. point e-m SIWZ The Contractor will be obliged to submit within the time limit indicated by the Employer, not shorterthan 10 days specified in the request issued by the Employer to the Contractor after opening the offers. In relation to the financial situation, information should be submitted to the bank or cooperative savings and credit union confirming the amount of financial resources or the creditworthiness of the contractor, not earlier than 1 month before the deadline for submitting bids, if duefor any reason, the contractor may not submit documents regarding the financial and economic situation required by the contracting authority, it may submit another document which sufficiently confirms the fulfillment of the condition of participation described by the contracting authority. contractors togetherabout orders. These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent that each of the contractors demonstrates compliance with the conditions for participation in the procedure and no grounds for exclusion. The statement of contractors jointly applying for the order placed on the EAT form should be submitted before the deadlineoffers, under pain of nullity, in electronic form, accompanied by a qualified electronic signature, by each of them to the extent that they confirm fulfillment of the conditions for participation in the procedure and the absence of grounds for exclusion. The documents referred to in point 13.2 letter SIWZ will be required to be submitted by each of the contractors jointly applying for the award of the contract. In the case ofawcow carrying out activities in the form of a civil partnership, the provisions regarding the offer of contractors jointly applying for the award of the contract shall apply accordingly, with the proviso that to answer the call of the Employer to submit documents should be attached a current certificate of the competent head of the tax office in accordance with - 5 paragraph 2 of the Regulation and the current relevant branch of the Social Insurance Institutionor KRUS in accordance with - 5 para. 3 of the Act The proceedings are conducted in accordance with the rules provided for "Reverse procedure", referred to in Article 24aa (1) and (2) of the Public Procurement Law. participation inproceedings. Information on the processing of personal data (applies to Contractors who are natural persons) is contained in chapter 27 of the ToR. Internet address (URL): http://bip.lasy.gov.pl/pl/bip/dg/rdlp_krosno/nadl_cisna
The bid deadline for Contract notice: Construction work was 14 Apr 2020. Bidding is closed.
This tender has been issued by PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE - NADLEŚNICTWO CISNA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 ~ Construction work ~ https://www.tendersontime.com/poland-tenders/construction-work-tenders/, 45112200 ~ Soil-stripping work ~ https://www.tendersontime.com/poland-tenders/soil-stripping-work-tenders/, 45240000 ~ Construction work for water projects ~ https://www.tendersontime.com/poland-tenders/construction-work-for-water-projects-tenders/, 45112210 ~ Topsoil-stripping work ~ https://www.tendersontime.com/poland-tenders/topsoil-stripping-work-tenders/, 45246000 ~ River regulation and flood control works ~ https://www.tendersontime.com/poland-tenders/river-regulation-and-flood-control-works-tenders/.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 41208702. The purchaser document reference is 105776-2020.