Contract notice: Construction work Tender in Hungary - 41208429
Tender notice from Hungary, published on 04 Mar 2020.
Executive Summary
The SZOCIÁLIS ÉS GYERMEKVÉDELMI FŐIGAZGATÓSÁG has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 04 Mar 2020 and is scheduled to close on 03 Apr 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 41208429, while the tender notice number is 105705-2020 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45000000, 45100000, 45200000, 45210000, 45220000, 45223300, 45310000, 45315100, 45315300, 45320000, 45331000, 45332000, 45350000, 45400000, 45421151, 45421153, 45000000, 45100000, 45200000, 45210000, 45220000, 45223300, 45310000, 45315100, 45315300, 45320000, 45331000, 45332000, 45350000, 45400000, 45421151, 45421153 CPV Description: Construction work. Site preparation work. Works for complete or part construction and civil engineering work. Building construction work. Engineering works and construction works. Parking lot construction work. Electrical installation work. Electrical engineering installation works. Electricity supply installations. Insulation work. Heating, ventilation and air-conditioning installation work. Plumbing and drain-laying work. Mechanical installations Building completion work Installation of fitted kitchens Installation of built-in furniture EFOP-2.2.2-17-2017-00008 - Ketetes epites 3 (1326) Reference Number: EKR000110002020 Service Center Design, Upgrade, Energy Upgrade as Specified in Execution Design Documentation and Inexpensive Design. -8698 Somogyvar, Kaposvari u. 4. (HRSZ: 617/1) 1 piece of basic services with a net floor area of 621.60 m. The contractor is responsible for supplying electricity and water to the contractor and, if necessary, the contractor for the supply of the temporary electricity associated with it. During the execution periodthe cost of consuming the aram, water and gas is borne by the contractor. On the site of the Epite can be found the task and responsibility of the winner of the patented, documented delivery of the raw materials and wastes produced in the epitees. The contractor is responsible for the preparation of the plans for the co-operation, the installation of the air and the installation of the internal pipeline. Main Site: 8698 SOMOGYVAR Kaposvari u. 4. (HRSZ: 617/1) Creation, renovation, modernization of the service center in accordance with the provisions of the construction design documentation and the unexpected co-operation plan. The main quantitative data for the construction are as follows: - New lift shaft erection: 1pcs - New landing gear erection: 2.91 m3 - Reinforcement of existing epuelet in planned elevator shaft erection: 2.32 m3 - fsubdivision: 23.88 m3 - load-bearing masonry: 12.8 m2 - partition walls: 149.75 m2 - sidewall plaster: 357.27 m2 - facade plaster: 103.66 m2 - inner plaster repairs: 362.72 m2 - wall paneling: 336.05 m2 - floor paneling: 600.51 m2 - PVC floor paneling: 258.02 m2 - installation of bad structures: 156.83 m2 - new front arrowinstallation of gates: 35 pcs - installation of new interior doors: 28 pcs - interior refinishing: 1209.07 m2 - new flat roof insulated: 668.27 m2 - construction of external terraces: 16.58 m2 - installation of electric lighting: 125 m - kitchen equipment - kitchen equipment : 15 pcs - new electric lines: 414 - new radiators: 27 pcs - new electric wires: 2970 m - electric fittings: 347 pcs1/2015. (X. 30.) on the basis of Article 46 (3) of the Government Decree that reference shall only be made to the subject matter of the product, origin, type, procedure, activity, person, patent or trademark specified in the notice of invitation and co unambiguous definition of character must mean "or equivalent" for toert and for the denominatoreni. The burden of proof of equivalence lies with the proposer. Equivalent rooms and related services are accepted by the author. Government Decree 191/2009 (IX.15) on the export business in the field of construction related to construction materials. The detailed terms and conditions are contained in the technical documentation of the procurement documents, and the full, unedited coilza. Timeline for Kbt. Section 56 (7) informs bidders that they will not hold on-site bailouts. Benchmarking excludes any suggestion of detail for the following reasons: The construction work to be performed, the nature of the construction of the Epitex, shall be done in a defined area, the nature of the construction of the Epitex, the technical unit, andeconomic rationale, legal and warranty arrangements do not allow for a breakdown of the order in the execution phase. Providing further feedback would make it difficult for individual Entrepreneurs to co-operate with co-workers or labor organizations. Consideration of the aforementioned dogfoods, which is not negotiable, implies that a sign of further availabilityin particular, it would make it harder for a co-operative organization of companies to waste time on a project-to-co-test; it would not be possible to define a particular contractor responsible for the entire organization of epitex investment, since, contrary to the interest of one-man cooperative entrepreneurs, each entrepreneur would primarily consider his own (co-operative) delivery limit;as well as the almost impossible task with regard to Jotallas requirements, the customer would be more and more contracted, given the fact that more contracts mean more time and longer booking times. In addition to the aforementioned organs, it is not economically justifiable to further break down the procurement, as this variation would not result in the appearance of new economic operators in the coezoet of bidders, buton the think tank would result in specific arno increments, and on the referrer page due to fuegges from parallel projects, it would result in a drop in referrals. The procedure shall not include an offeror, coezoeist offerer (AT), sub-contractor, and shall not be eligible for certification as an economic operator who is a Kbt. Section 62 (1) - (2) are excluded. The Kbt. 7Section 4 (1) based on the suggestion (AK), the AT, the subcontractor or the organization certifying the suitability of the Kbt. Article 62 (1) - (2) is subject to the power of exclusion or is subject to exclusion in the course of the procedure. The Kbt. Section 64 (1) para. based on Kbt. Section 62 (1) para. (b) and (f)Contrary to any other exclusions, an economic operator who offers, submits, submits or submits a certificate of competency may not be excluded from the Co-Procurement Procedure if the Co-Procurement Authority pursuant to Section 188 (4). of the General Court, or in the case of co-administration proceedings in accordance with Section 188 para. a final decision underhe stated that the economic operator in question had, prior to the submission of the offer or application, brought in an interest which, contrary to the foregoing grounds, would justify its reliability. For exclusion reasons, certificates issued prior to the commencement of the co-procurement may be retrieved (used) for as long as the cultures contained in the certificates, or the data content is valid. Unless proven otherwise by the AK, the data content is claimed by the tenderer in a statement by kueloen to this effect. II. SZ / 1 .: AT is ineligible if the economic operator performing the construction activity is not listed in the Etv. in the list of construction contractors carrying out construction work in accordance with. W / 1st Yes. Section 65 (1) (c) and Section 322/2015. (X.30.) Cr. Section 26 (1) para. on the basis of the AK requirement for economic operators carrying out construction work in the construction industry in accordance with the provisions of the Etv. of the construction industry, or, in the case of economic operators not established in Hungary, allow registration in the country of establishment or prescribed in the country of establishment.with a degree, certificate, or organizational, chamber tag membership. The SZ / 1. in the case of non-resident economic operators who are not listed in the country of establishment or who do not have a permit, license or organizational tag in the country of establishment. Certified Mo.Doc: Together with your offer, you are required to provide proof of suitability and exclusion as well as specification of your technical specifications for co-procuring procedures. (X. 30.) Government Decree (hereinafter: Government Decree) 2-4. -, 6-7. - and the time taken in accordance with - 2 of the Single European Co-Procurement Document for Garden Mods(hereinafter referred to as `EEKD`). Instructions for the EEKD Kitelesseser are contained in the Co-Procurement Document (hereinafter referred to as "KD"), which is provided on a timely basis. Pursuant to Section 3 (2) of the Government Decree, organizations providing capacity are required to submit the EEKD. Article 3 (3a) of the Government Decree. based on the koezoes ATs representation in the statement ofthe offer is made by the economic operator who comes up. AT must confirm in advance that it does not belong to the Kbt by entering EEKD. Section 62 (1) - (2) has the authority. The exclusion grounds do not supersede the Kbt. - 69 (4) para. In the case of the above, the modality defined in Sections 8, 10, 12, and 16 of the Government Decree shall be verified. Exclusion reasons shall not be justified by Articles 1-4 of the Government Decree. -, 6-8.Articles 10, 10, 12, 16 to 16 contain the terms of reference. The excuse for the reasons given in section III.1.1) of this call for proposals is detailed in KD. Section 53 paraThe reason for this is the following: It is a condition of co-procuring a contract that, if the best value for money offer is not available, then there is no need to lower the amount of the deposit. Subject to the above conditions, I suggestforce of Kbt. Pursuant to Article 135 (12), the prospective contractor is required by the unconditional condemnator to determine the amount of support required for the successful bid to secure additional cover. In this case, the third day on which the contract is secured is the third working day of soliciting the toebblethorse, and at the very least working day of the working area.working day beluel sor keruel. The time-honored approach to doentes irishly conveys to the winning bidder. To the extent that I do not allow or disregard the right to do so in connection with the provision of additional coverage, or in the absence of doentes to do so, mu or less, tamogato) doentes written in the day, but at the very least on the 120th day of the day of the oestment, fueggetlenuel to deal with the result of the extension. The time-honored koezoes reviewers also accept the offer. Bidding from the successful bidder does not cost money to establish a company, but in case of a suggestion, zoes reviewers should co-operate with each other to regulate their relationship with the power of time. An example of an agreement with the United Cooperative shall be attached to the offer. The Kbt. Section 35 (3) para. basically any statement made by a group of koezoes reviewers should clearly stateyou need to sign up for koezoes reviewers. In case of Koezoes suggestion, Kb must be attached in the offer. A certificate of authorization pursuant to Section 35 para. The attorney shall state that the representative of the co-opted or co-bidder is an eligible economic operator for the purpose of completing electronic declarations in the ECRAges can be attended by individual koezoes or caseworkers. The tender must contain, in the form provided in the form provided in the ECR notice, a clear statement by the tenderer regarding the terms of the tender, the contract performance and performance of the garden. The quote should hold a reading sheetwhich, in the event of an offer, reveals the Kbt. 68 (4). The bidder in the ECS system is trying to find a quotation sheet created on a co-branded electronic form for co-procurement documents. In the case of an ongoing variation entry procedure, the tenderer shall submit the form available at the ECU noticeis required to attach a Variety Listing Request submitted to the Company and a certificate of its origin, as agreed upon by the Company. In the event that the offerer is not subject to multiple listing procedures, the relevant negative statement shall be enclosed. san can be accessed electronically at the following notice: https://ekr.gov.hu/ Pledge of Intent subject to the terms of the Kbt. Section 54 para. Bidders are offered the Kbt at the same time as offering their bid. 54 (4)k security. Please note that the Provisional Providers should have more time to set up the Provisional Trial Benefit and the Trial Trial Benefit should be up at 24:00 daily. The consultant must maintain the commission until the contract is concluded. The Kbt. Subject to the provisions of Section 54 para.the required pencil is covered by a deposit with a deposit, a penzuegyte or insurer`s guarantee or a collateral, or a collateral, which is based on an insurance contract. How to verify a deposit in your bank account in case of overdue (bank transfer) paymentAttach the certificate of debit, in case of bank transfer. In the event of the renewal of the Provisional Commissioners in the form of a bank guarantee or an insurance guarantee or on a contractual basis, the time-limit shall provide that the bank guarantee / insurance guarantee document or the guarantee contract shall be valid. comply with the electronic certificate of trust issued by the Insurance Contract on the basis of the Code of Civil Procedureto the full proof of a solicited private paper. In the case of Koezoes offerings, Koezoes offerers need to provide the fuse once. In the event of a toertent suggestion from any of the co-op offerers, the commissioners will be entitled to the bid. (Section 35 para. 5 Kbt.) If the tenderer is the security guardt has not been provided for the time limit prescribed by the time limit or the lesser amount of time prescribed for the sea, the offer of the tenderer is infinite. Name of the bank account and account manager for the time-honored account, which can be performed by the tender commissioners in case of reference: Number 10032000-00329905-31005953 managed by Hungarian Allamkincstar. AK does not maintain the file in this procedurerights under the Kbt. Section 34 of the Act on Economic Operators. K is not interested in the co-purchasing process, nor does it claim to be the foundation of a project organization, nor does it make it possible to establish a business organization (project organization). It is a requirement of the recommendation that at the time kueloen-kueloen be indicated:b) the subcontractor (s) for which the subcontractor submitting the offer is to be procured, (b) the subcontractors known for the purpose of submitting these bids and who are known at the time of submitting the offer. The statement shall be accompanied by a negative statement. You do not order a newer hianypotlast for a bid if your hianypotl is not an economist not previously listed in the bidinvolves a plasterer, and in view of this economic operator, it would be desirable for a newer patient to be involved. For all times / deadlines, time is considered to be your time in Central European Time (CET). With respect to non-regulated inquiries, Kbt. and its implementing regulations, and information, instructions andaccording to anlasai. Timeline for Kbt. According to Section 131 para. Internet address (URL): http://www.szgyf.gov.hu
The bid deadline for Contract notice: Construction work was 03 Apr 2020. Bidding is closed.
This tender has been issued by SZOCIÁLIS ÉS GYERMEKVÉDELMI FŐIGAZGATÓSÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45200000 - Works for complete or part construction and civil engineering work, 45210000 - Building construction work, 45220000 - Engineering works and construction works, 45223300 - Parking lot construction work, 45310000 - Electrical installation work, 45315100 - Electrical engineering installation works, 45315300 - Electricity supply installations, 45320000 - Insulation work, 45331000 - Heating, ventilation and air-conditioning installation work, 45332000 - Plumbing and drain-laying work, 45350000 - Mechanical installations, 45400000 - Building completion work, 45421151 - Installation of fitted kitchens, 45421153 - Installation of built-in furniture.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 41208429. The purchaser document reference is 105705-2020.