Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45111300, 45220000, 45315000, 45262000, 45261100, 09331200, 45311200, 45310000, 45232410, 45233200, 45000000, 45111300, 45220000, 45315000, 45262000, 45261100, 09331200, 45311200, 45310000, 45232410, 45233200
CPV Description: Construction work.
Dismantling works.
Engineering works and construction works.
Electrical installation work of heating and other electrical building-equipment.
Special trade construction works other than roof works.
Roof-framing work.
Solar photovoltaic modules.
Electrical fitting work.
Electrical installation work.
Sewerage work.
Various surface works.
Montaż paneli fotowoltaicznych na konstrukcji of wood and architectural concrete and all electrical devices in the "Stodoła Elektryczna" facility
Reference Number: KPN / 3/2020
Installation of photovoltaic panels on the structure of wood and architectural concrete as well as all electrical devices in the "Stodoła Elektryczna" facility with electrical installation S / N connection line to the electrical network of the operator being elementsnt stage 1 of the investment: Museum and Education Center of the Karkonosze National Park Pałac Sobieszow, stage I / B.
Main Site: Karkonosze National Park Pałac Sobieszow, POLAND.
"Installation of solar panels on wood and architectural concrete structures and all electrical devices in the facility" Stodoła Elektryczna "together with the S / N electrical connection line to the elof the electric operator being part of the first stage of the investment: Museum and Education Center of the Karkonosze National Park Pałac Sobieszow, stage I / B "includes:
a) demolition of the existing brick and stone wall along with its reconstruction after the completion of the designed foundations for the" Stodoła Elektryczna "facility,
b) removing part of the stone-earth slope and field elements to the extent needed forexecution of supporting structure for photovoltaic panels,
c) dismantling of the retaining wall and temporary protection of the remaining part of the escarpment until the construction of the structure,
d) making the S / N connection from the transformer station of the Tauron energy network operator and the new S / N station located in the "Stodoła Elektryczna" facility,
e) execution of the entire structure ofreinforced concrete wooden "Stodoła Elektryczna" facility and technical rooms (excluding facade, wooden blinds on the substructure made of steel profiles) along with the entire facility infrastructure and electrical equipment,
f) purchase and installation of photovoltaic panels with all instrumentation,
g) performance new pavement made of granite cubes in the range shown in Fig. 3 together with partrainwater installation and collective wells D24, D23 and D22 according to the attached designs: road (annex no. 2 letter k) and storm water drainage system (annex no. 2 letter e),
h) restoration of stone wall fragments along with renovation of preserved wall fragments next to the designed "Stodoła Elektryczna" facility in the range shown in fig. 4 together with the construction of the wicket, according to the attached designto small architecture (Annex No. 2, letter b).
The Contractor will meet the condition of participation in the proceedings regarding the economic or financial situation, if he shows that respectively:
a) has financial resources or creditworthiness in the amount of min. PLN 1, 000, 000.00
and
b) is insured against civil liability in the scope of conducted activities related to the subject of the contract for the sum of the guarantorher: min. PLN 1, 000, 000.00.
To confirm that the condition relating to economic or financial standing has been met, the Employer requests from the Contractor the documents:
1) information from the bank or cooperative savings and credit union confirming the amount of financial resources or creditworthiness of the Contractor, not earlier than 1 month before the submission deadline;
2) confirming that the Contractor is insured against civil liability in the scope of conducted activities related to the subject of the contract for a guarantee sum specified by the Employer.
1. The contractor is subject to exclusion pursuant to art. 24 paragraph 1 and item 5
2. The contractor will personally perform key parts of the contract, reinforced concrete support columns, including foundationsThe eluent.
3. Requirements of the Employer, referred to in art. 29 paragraph 3a of the Public Procurement Law, i.e.: employment under a contract of employment by the Contractor or subcontractor of persons directly involved in the performance of the contract.
4. Security deposit PLN 50, 000.00; in words: fifty thousand zlotys.
5. The security is set at: 5% of the total price given in the offer. The contractor contributes securityprior to signing the public procurement contract. The period of lodging the security is min. 3 years.
6. In accordance with art. 13 section 1 and 2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27.4.2016 on the protection of individuals with regard to the processing of personal data and on the free movement of such data and repealing Directive 95/46 / EC (general provisionsregulation on data protection (Journal of Laws EU L 119 of 4.5.2016, p. 1)), hereinafter referred to as "GDPR", the Purchaser informs that:
1) the administrator of personal data is the Karkonoski National Park based in Jelenia G-ra, ul. Chałubińskiego 23, 58-570 Jelenia Gora, POLAND, tel. 75 75 537 26, e-mail address:
[email protected];
2) inspector for the protection of personal data in the Karkonosze National Park based in JeleniaGorze is: Leszek Wierzbicki;
[email protected]. The indicated personal data by the Contractor will be processed on the basis of art. 6 clause 1 lit. c RODO for the purpose related to the procedure for the award of the contract "Installation of photovoltaic panels on a structure of wood and architectural concrete and all electrical devices in the facility" Electrical Stodola "along with the implementation of the electrical connection lineen / S / N to the operator`s electrical network as part of the first stage of the investment: Museum and Education Center of the Karkonosze National Park Pałac Sobieszow, stage I / B ". KPN / 3/2020 conducted in an open tender;
3) the indicated personal data will be stored in accordance with from Article 97 paragraph 1 of the Public Procurement Law, for a period of up to 2030 from the date of termination of the contract award procedure;
4)the obligation for the Contractor to provide personal data directly concerning you is a statutory requirement specified in the provisions of the Public Procurement Law, related to participation in a public procurement procedure;
5) decisions regarding your personal data will not be taken in an automated manner, pursuant to art. 22 GDPR.
You have:
1) pursuant to art. 15 GDPR right daccess to personal data concerning you;
2) pursuant to art. 16 GDPR, the right to rectify your personal data, exercise of the right to rectification may not result in a change in the outcome of the public procurement procedure or a change in the provisions of the contract to the extent not in accordance with the Public Procurement Law and may not violate the integrity of the protocol and its annexes;
3) based on art. . 18RODO the right to request the administrator to limit the processing of personal data, subject to the cases referred to in art. 18 clause 2 GDPR, the right to limit processing does not apply to storage, to ensure the use of legal protection measures or to protect the rights of another natural or legal person, or for important reasons of public interestego of the European Union or a Member State;
4) the right to lodge a complaint to the President of the Office for Personal Data Protection, if you find that the processing of your personal data violates the provisions of the GDPR.
You are not entitled:
1) in connection with art. 17 clause 3 lit. b, d or e GDPR, the right to delete personal data;
2) the right to transfer personal data referred to in art. twentyGDPR;
3) pursuant to art. 21 GDPR, the right to object to the processing of personal data, because the legal basis for the processing of your personal data is Art. 6 clause 1 lit. c GDPR.
Internet address (URL): http://www.kpnmab.pl