Expired Tender Poland ICB TOT Ref. 40534935

Contract notice: Construction work Tender in Poland - 40534935

Tender notice from Poland, published on 12 Feb 2020.

Exeutive Summary

The PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SANIKOM SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 12 Feb 2020 and is scheduled to close on 23 Mar 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 40534935, while the tender notice number is 069106-2020 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
40534935
Document Ref. No.
069106-2020
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
12 Feb 2020
Bid deadline
23 Mar 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 79421200, 45222100, 45222110, 45210000, 71320000, 45310000, 45000000, 45100000, 45233220, 71220000, 71221000, 71242000, 45400000, 45000000, 79421200, 45222100, 45222110, 45210000, 71320000, 45310000, 45100000, 45233220, 71220000, 71221000, 71242000, 45400000
CPV Description: Construction work.
Project-design services other than for construction work.
Waste-treatment plant construction work.
Waste disposal site construction work.
Building construction work.
Engineering design services.
Electrical installation work.
Site preparation work.
Surface work for roads.
Architectural design services.
Architectural services for buildings.
Project and design preparation, estimation of costs.
Building completion work.
Reconstruction of the selective municipal waste collection point in Bogusz-w-Gorce together with the second waste life point, organization of disassembly of bulky waste
Reference Number: 22 / JRP / PZ / 2020
The subject of the order is the design and reconstruction of the point selective municipal waste collection (PSZOK) in Bogusz-w-Gorce at ul. Brzozowa 1, together withwith the second waste point of life, organization of disassembly of bulky waste as part of the project entitled "Optimization and implementation of new waste processing and recovery processes in the Central Sudeten waste management region to increase recycling levels."
Main Site: 1 Brzozowa Street in Bogusz-w-Gorce, Poland
The subject of the order is the design and reconstruction of the selective pointmunicipal waste collection (PSZOK) in Bogusz-w-Gorce at ul. Brzozowa 1, along with the second waste point, organization of disassembly of bulky waste as part of the project entitled "Optimization and implementation of new waste treatment and recovery processes in the Central Sudetes region of waste management in order to increase recycling levels." The scope of the project includesdesign and construction of the following facilities:
- construction of a square for a selective municipal waste collection point,
- yard for dismantling bulky waste,
- reconstruction of a collision of a planned investment with utility networks,
- modernization of social facilities through the construction of a building with social facilities and infrastructure,
- construction of necessary elements of technical infrastructure (among othersexternal steel installations: water supply, storm water drainage, sanitary power installation and area lighting, rainwater and snowmelt tank, oil derivative separator and settler, etc.),
- construction of the shed including the area separated in it as a "second life" point,
- reconstruction of the existing square around the social facilities,
- construction of the area fence, along with cleaning worksgreenery, planting of greenery (hedge),
- delivery of PSZOK equipment necessary for its proper operation (e.g. containers, containers, carts, scales, etc.).
As part of the works related to this undertaking, training of investor`s personnel should also be carried out and all necessary permits and decisions included in Polish law for the proper functioning of the above object.
Scopeorders include in particular:
a. developing a material and financial schedule,
b. developing a quality assurance program,
c. developing a technological design in consultation with the Employer,
d. developing, in consultation with the Employer, project documentation for the reconstruction of PSZOK along with land development and modernization of social facilities,
e. developing detailed specificationsand technical performance and acceptance of construction works,
f. obtaining all necessary conditions, arrangements, permits and decisions, including building permits, integrated permits,
g. exercising author`s supervision over the implementation of construction works covered by the abovementioned project documentation,
h. preparatory and earth works: felling of trees and shrubs, inventory, demolition and reconstruction of real estateland development networks with facilities located on the investment site and in collision with the intended intention,
and. site preparation and macro leveling,
j. sanitary works implementation of networks and utilities (plumbing, energy, teletechnical, etc.),
k. road works,
l. construction works related to foundation and erection of facilitiesin construction,
m. delivery and assembly of equipment related to the implementation of the point for the removal of bulky waste and the second life point of waste and mobile equipment,
n. construction works related to fire protection, including fire protection tank,
o. finishing works,
p. supply of equipment for construction and buildings,
q. ensuring complete marking of facilities, uregulations, rooms, zones and other elements of installations requiring labeling, in accordance with the law,
r. providing the Employer with complete as-built documentation, operation and maintenance instructions, operation and maintenance documentation, position instructions, OHS and fire protection,
p. final tests,
vol. training of the Employer`s staff in the operation of facilities, equipment and installationstheir maintenance and repair,
u. obtaining necessary arrangements and permits arising from the law and resulting from the requirements of this PFU, enabling the operation of facilities and equipment,
v. ensuring permanent marking of facilities, equipment and installation elements required due to co-financing of investments from European Union funds under the Infrastructure and Environment operational programbriefing for 2014 2020, in this scope there is also putting up an information / souvenir board for the project,
in. handing over to the Employer of facilities and equipment for use.correct operation of the investment: "Reconstruction of the selective municipal waste collection point in Bogusz-w-Gorce together with the second waste life point, organization of disassembly of bulky waste", necessary for its use.
When designing and constructing installations, the specificity and operating environment of facilities and equipment that characterize aggressive conditionsand related to municipal waste.
The Employer does not specify specific conditions in this respect.
The Employer requires that the Contractor have civil liability insurance in the scope of conducted activities related to the subject of the contract, for a guarantee sum of not less than: PLN 200, 000.00 (* 1).
In case of joint application of 2 or more Contractors for granting this contractcontractors, their total economic and financial situation will be assessed, for this purpose documents must be submitted by those or those of the Contractors who will demonstrate compliance with this condition on behalf of all.
(* 1) If Contractors submit documents regarding the value of construction works containing data in currencies other than PLN, the Purchaser will accept the currency conversion rate as suche average exchange rate of the National Bank of Poland (NBP) published as at the end date. If the NBP average exchange rate table was not published on the end date, the exchange rate from the last average exchange rate table published immediately before the end date will be used.
6. In order to confirm that the Contractor has met the conditions for participation in the proceedings regarding the economic situation or finansowa, the Contractor, at the request of the Employer, submits the following documents:
1) a document confirming that the Contractor is insured against civil liability in the scope of conducted activities related to the subject of the contract for a guarantee sum specified by the Employer.
7. If, for a justified reason, the Contractor cannot submit the documents required by the Employerreferred to in paragraph 6, the Employer allows the Contractor to submit other documents that sufficiently confirm that the condition of participation in the procedure described by the Employer has been met.
9. In order to confirm that there are no grounds for excluding the Contractor from participation in the proceedings, the Contractor, at the request of the Employer, submits the following documents:
1) information from the National Criminal Record in the field ofspecified in art. 24 paragraph 1 point 13, 14 and 21 of the Act;
2) a certificate from the competent head of the tax office confirming that the Contractor is not in arrears with tax payments, issued not earlier than 3 months before the deadline for submitting bids, or other document confirming that the Contractor has concluded an agreement with the competent tax authority regarding repayment of these receivables together withinterest or fines, in particular, he obtained the exemption, deferment or installment of overdue payments as provided for by law or withholding in full the execution of the decision of the competent authority;
3) a certificate of the appropriate organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that performerand is not in arrears with the payment of social security or health insurance contributions issued no earlier than 3 months before the deadline for submission of tenders, or other document confirming that the Contractor has entered into an agreement with the competent authority regarding the repayment of these receivables together with any interest or fines, in particular obtained a legal exemption, deferral or resolutioninstallment of overdue payments or withholding in full the execution of the decision of the competent authority;
4) an excerpt from the relevant register or from the central register and information on economic activity, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. . 24 paragraph 5 point 1 of the Act.
10. If the Contractor has its registered office or placeresiding outside the territory of the Republic of Poland, instead of the documents referred to in paragraph 9:
1) point 1 submits information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial or administrative authority of the country in which the Contractor has its registered office or place of residence or the place of residence of the person to whom the information relatesor a document to the extent specified in art. 24 paragraph 1 point 13, 14 and 21 of the Public Procurement Law;
2) point 2 4 submits a document or documents issued in the country in which the Contractor has its registered office or place of residence, confirming accordingly that:
a) he is not in arrears with taxes, fees and contributions for social or health insurance or that he has entered into an agreement with the competent authority regarding the repayment of thesetogether with any interest or fines, in particular, he obtained the exemption, deferment or installment of overdue payments as provided for by law, or withholding in full the execution of the decision of the competent authority,
b) its liquidation has not been opened or bankruptcy has been declared.
11. The documents referred to in paragraph 10 point 1 and point 2 lit. b, should be issued not earlier than 6 monthsbefore the bid submission deadline. The document referred to in paragraph 10 point 2 lit. a, should be issued not earlier than 3 months before the expiry of that period.
12. If in the country in which the Contractor has its registered office or place of residence or place of residence, there is a person to whom the document relates, the documents referred to in para. 10, shall be replaced by a document containing fromappropriate statement of the Contractor, indicating the person or persons authorized to represent him, or a statement of the person to whom the document was to relate, made before a notary public or before a judicial, administrative or professional or economic self-government body competent for the seat or place of residence of the Contractor or place of residence this person. The provision of para. 11 hundredsuje.
13. The Contractor having its registered office in the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Poland, to whom the document referred to in para. 9 point 1, submits the document referred to in para. 10 point 1, to the extent specified in art. 24 paragraph 1 points 14 and 21 of the PPL Act. If in the country where the person resides, whosethe document was to relate to, no such documents appear, it is replaced by a document containing the person`s declaration submitted to a notary public or before a judicial, administrative or professional or economic self-government body competent for the place of residence of that person. The provision of para. The first sentence of Article 11 shall apply
Internet address (URL): www.sanikom.com.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 23 Mar 2020. Bidding is closed.

This tender has been issued by PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SANIKOM SP. Z O.O. in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 79421200 - Project-design services other than for construction work, 45222100 - Waste-treatment plant construction work, 45222110 - Waste disposal site construction work, 45210000 - Building construction work, 71320000 - Engineering design services, 45310000 - Electrical installation work, 45100000 - Site preparation work, 45233220 - Surface work for roads, 71220000 - Architectural design services, 71221000 - Architectural services for buildings, 71242000 - Project and design preparation, estimation of costs, 45400000 - Building completion work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 40534935. The purchaser document reference is 069106-2020.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate, Defence and Security in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.