Contract notice: Construction work Tender in Poland - 40495414
Tender notice from Poland, published on 11 Feb 2020.
Exeutive Summary
The SKARB PAŃSTWA, PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE, REGIONALNA DYREKCJA LASÓW PAŃSTWOWYCH W SZCZECINIE has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 11 Feb 2020 and is scheduled to close on 24 Feb 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 40495414, while the tender notice number is 066093-2020 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45200000, 45223800, 45223820, 45110000, 45111200, 45400000, 45210000, 45420000, 45260000, 45450000, 45320000, 45261210, 45262311, 45262310, 45421100, 45432000, 45324000, 45443000, 45111291, 45330000, 45232410, 45331210, 45262200, 45331100, 45231300, 45311200, 45311000, 45314320, 45000000, 45200000, 45223800, 45223820, 45110000, 45111200, 45400000, 45210000, 45420000, 45260000, 45450000, 45320000, 45261210, 45262311, 45262310, 45421100, 45432000, 45324000, 45443000, 45111291, 45330000, 45232410, 45331210, 45262200, 45331100, 45231300, 45311200, 45311000, 45314320 CPV Description: Construction work. Works for complete or part construction and civil engineering work. Assembly and erection of prefabricated structures. Prefabricated units and components. Building demolition and wrecking work and earthmoving work. Site preparation and clearance work. Building completion work. Building construction work. Joinery and carpentry installation work. Roof works and other special tradeconstruction works. Other building completion work. Insulation work. Roof-covering work. Concrete carcassing work. Reinforced-concrete work. Installation of doors and windows and related components. Floor-laying and covering, wall-covering and wall-papering work. Plasterboard works. Facade work. Site-development work. Plumbing and sanitary works. Sewerage work. Ventilation installation work. Foundation work and water-well drilling. Central-heating installation work. Construction work for water and sewage pipelines. Electrical fitting work. Electrical wiring and fitting work. Installation of computer cabling. Construction of the administrative building of the Regional Directorate of State Forests in Szczecin, proceedings II Reference Number: EZ.270.2.4.2020 The subject of this contract includesto carry out construction works falling within the scope of the investment task including the construction of the administrative building of the State Forests Directorate in Szczecin, the associated utility and garage building as well as technical infrastructure in the form of parking lots, internal roads, crossings, hardening of the area, connections and installation devices along with obtaining the final permit decisionand use. Main Site: Szczecin The scope of construction works, object parameters, their location and scope of installation is presented in the design documentation: construction design, detailed design, technical specification for the performance and acceptance of construction works (hereinafter: STWiORB ") and covers m. in execution: 1) an administrative building for the needs of forest management with a usable area of 3, 191, 04 m, built-up area 2 066 m, two-storey, combining two execution technologies: traditional (with the use of reinforced concrete and masonry structure) and prefabricated with the use of wooden structural elements; 2) utility and garage building with a usable area of 259.26 m, area buildings 294.3 m; 3) land development, in the form of: a) access road; b) entryon the plot; c) parking yards; d) flagpoles; e) planting of greenery; f) logotype of State Forests; g) street furniture in the form of benches, tables, waste bins; h) area lighting ; 4) the necessary technical infrastructure, including the construction of, among others: underground fire tank; b) connections and plumbing; c) sewage connections and plumbingsanitation; d) connections and electrical installation; e) heat pump installation; f) CCTV system in the form of external cameras; g) green watering system with automatic irrigation and the use of collected rainwater from tanks for its collection. Note ! The following works, deleted in the bill of quantities of the robot (constituting Annex 10 of the ToR), do not constitute the subject of the contract: 1. fencese along with entrance gates and wickets; 2. forest walkways. The contracting authority plans to make these elements at a later stage. The dimensions of the robot have also been attached to the project documentation. The bills are only of secondary importance. The amounts of individual types of work indicated in the bill of quantities are approximate values, and the difference between these amounts in relation to the existing state on the beachcu construction may not be the basis for any claims against the Employer. The detailed scope of work to be performed by the Contractor shall specify: 1) description of the subject of the order Annex No. 9 of the ToR; 2) design documentation with attached decisions and permits Annex 10 of the ToR 3) model contract Annex 8 SIWZ. The Employer requires that the building in partand was implemented with the use of prefabricated wooden construction elements: wall, ceiling and column modules), assembled on the construction site. temporary waste dump, as well as their removal and utilizationą; 2) preparation of the "Safety and health protection plan"; 3) preparation of an information board in accordance with the Construction Law; 4) fencing and securing the construction site; 5) obtaining arrangements, permits, decisions, e.g. permission to use the facility construction, occupation of the road lane, drilling of geological boreholes for the heat pump, together with preparation of necessary documents and consent The Contractor shall be liable to the Employer under the warranty for defects and guarantees of the subject of the contract for 36 months from the date of completion of the subject of the contract indicated in the final acceptance protocol of the subject of the contract. the composition of the subject of the order consistce on performing activities in the scope of: 1) earthworks; 2) construction and building works; 3) works in sanitary installations; 4) works in electrical and teletechnical installations; 5) finishing works; 6) land development. If the performance of these activities involves the performance of work in the manner specified in art. 22 - 1 of the Act of 26.6.1974 Labor Code (i.e.U.20.2019 item 1040, as amended). than PLN 6, 000, 000. The condition with regard to the economic situation will be consideredfulfilled if the Contractor demonstrates that he has civil liability insurance in the scope of conducted activities related to the subject of the contract for a guarantee sum of not less than PLN 15, 000, 000.00. Description of meeting the conditions for participation in the procedure in section VI.3. Starting implementation of the subject orders, from the day the building site is handed over. Completion of the order subjectand a 20 months from the day of forwarding. pl. house. The final acceptance of the subject of the contract will be possible after obtaining by the Contractor the final or rigorous immediate enforceability of the occupancy permit decision, which will be forwarded to the Employer together with the as-built documentation and the statement of the construction manager regarding the completion of the subject of the contract. Contractors who are not subject to exclusion from the contract award procedure pursuant to art. 24 paragraph 1 point 12 23 Public Procurement Law and art. 24 paragraph 5 points 1 2 and 4 8 Public Procurement Law In order to confirm the lack of grounds for exclusion from the procedure and to confirm that the conditions for participation in the procedure have been met, the Contractor shall be obliged to provide the Employer with the following statements and documents (in accordance withz SIWZ): a) the Contractor`s current statement as at the day of submitting the offers constituting a preliminary confirmation of compliance with the conditions for participation in the procedure specified in this SIWZ and no grounds for exclusion, submitted on the form of the uniform European order document; b) a list of persons referred by the Contractor to implementation of a public contract, in particular those responsible for theconstruction works together with information on their professional qualifications, authorizations and experience necessary to perform the public contract, as well as the scope of their activities and information on the basis for their disposal; c) a list of construction works carried out not earlier than during last 5 years before the submission deadline, and ifthe end of business activity is shorter in this period, together with the type of value, date, place of performance and entities for whom these works have been carried out; d) evidence determining whether these works have been carried out in accordance with the construction law and correctly completed ; e) a document confirming that the Contractor is insured against civil liability in the orderthe amount of the business related to the subject of the contract for a guarantee sum of not less than PLN 15, 000, 000.00; f) information from the bank or cooperative savings and credit union confirming the amount of financial resources or the Contractor`s creditworthiness; g) an excerpt from the relevant register or from central records and information on business activities; h) certificate inclthe proper head of the tax office confirming that the Contractor is not in arrears with payment of taxes; i) a certificate of the relevant organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the Contractor is not in arrears with the payment of social security or health insurance contributions; j ) information from the National Register of Kak) a statement of the Contractor on the lack of grounds for exclusion according to the template in Annex 3 of the ToR. Documents indicated in point b k The Contractor shall be obliged to submit within a time limit specified by the Employer, not less than 10 days, specified in the call issued by the Employer to the Contractor after opening the tenders pursuant to art. 26 section 1 Public Procurement Law Documents indicated in point b k should be current as at PLNdesignated by the Employer. If the Contractor, demonstrating compliance with the conditions referred to in Article. 22 paragraph 1b Public Procurement Law (item 6.2 of the Terms of Reference), consists of the resources of other entities on the principles set out in art. 22a paragraph 1 Public Procurement Law is obliged to submit: 1) third party`s statement on meeting the conditions for participation in the procedure submitted on the EED form; 2) third party`s commitment or othera document used to demonstrate that a third party has made potential available to the Contractor in accordance with point 7.3 of the ToR. to OJ The EU. Internet address (URL): www.szczecin.lasy.gov.pl
The bid deadline for Contract notice: Construction work was 24 Feb 2020. Bidding is closed.
This tender has been issued by SKARB PAŃSTWA, PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE, REGIONALNA DYREKCJA LASÓW PAŃSTWOWYCH W SZCZECINIE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45200000 - Works for complete or part construction and civil engineering work, 45223800 - Assembly and erection of prefabricated structures, 45223820 - Prefabricated units and components, 45110000 - Building demolition and wrecking work and earthmoving work, 45111200 - Site preparation and clearance work, 45400000 - Building completion work, 45210000 - Building construction work, 45420000 - Joinery and carpentry installation work, 45260000 - Roof works and other special trade construction works, 45450000 - Other building completion work, 45320000 - Insulation work, 45261210 - Roof-covering work, 45262311 - Concrete carcassing work, 45262310 - Reinforced-concrete work, 45421100 - Installation of doors and windows and related components, 45432000 - Floor-laying and covering, wall-covering and wall-papering work, 45324000 - Plasterboard works, 45443000 - Facade work, 45111291 - Site-development work, 45330000 - Plumbing and sanitary works, 45232410 - Sewerage work, 45331210 - Ventilation installation work, 45262200 - Foundation work and water-well drilling, 45331100 - Central-heating installation work, 45231300 - Construction work for water and sewage pipelines, 45311200 - Electrical fitting work, 45311000 - Electrical wiring and fitting work, 45314320 - Installation of computer cabling.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 40495414. The purchaser document reference is 066093-2020.