Contract notice: Construction work Tender in Hungary - 39916536
Tender notice from Hungary, published on 23 Jan 2020.
Exeutive Summary
The NFSI NEMZETI FEJLESZTÉSI ÉS STRATÉGIAI INTÉZET NONPROFIT KFT. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 23 Jan 2020 and is scheduled to close on 24 Feb 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39916536, while the tender notice number is 029866-2020 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45111100, 45262100, 45262500, 45324000, 45410000, 45261310, 45261400, 45300000, 45310000, 45332200, 45333000, 45421100, 45442100, 45000000, 45111100, 45262100, 45262500, 45324000, 45410000, 45261310, 45261400, 45300000, 45310000, 45332200, 45333000, 45421100, 45442100 CPV Description: Construction work. Demolition work. Scaffolding work. Masonry and bricklaying work. Plasterboard works. Plastering work. Flashing work. Sheeting work. Building installation work. Electrical installation work. Water plumbing work. Gas-fitting installation work. Installation of doors and windows and related components. Painting work. SE Pető Andras Kar epueletenergetikai fejlesztese Reference Number: EKR001458882019 Contractor for the execution of construction work related to the epueletical energy development of Semmelweis University Pető Andras Faculty within the framework of the project KEHOP-5.2.2-16-2016-00095 Main Site: 1125 Budapest, Kutvoelgyi ut 6. nr .: 10171/5 . This Co-Procurement Item is an Exuel Andreas Karan Export from the Semmelweis University in connection with the Epuelet Energy DevelopmentPurchase of water works according to the following main quantitative features: - Demolition of load-bearing and load-bearing masonry: 5.3 m, - Demolition of load-bearing and load-bearing masonry: 8 700 m, - Drywall and lumber sub-ceiling opening: 1 280 m, - Pre-window repair, repair of coffee, plaster repair, repair of non-rechargeable: 2 700 m, - sub-ceilingdemolition or dismantling and re-installation: 1 400 m, - placement of mounted plasterboard ceilings: 1 265 m, - roofing of gypsum plasterboard: 1 060 m, - demolition of rivets, parapets, canopy: 1 550 m, - Location of prefabricated parkany: 1 550 m, - Formation of openings above the open acids in aluminum tablecloth: 1 850 m, - Wooden or plastic openings bWidth: 2, 301 m, - Installation of plastic cauliflower arrows: 863 pcs, - Installation of heat sealed aluminum cauldrons: 338 pcs, - Dispersion painting: 4 200 m, - Thermal acoustic insulation of facade wall: 4 850 fm, - Plastic roller shutters: 216 pcs, - Aluminum roller shutters: 780 m, - 1000 l indirect indirect domestic hot water storage tank: 4 sets, - Condensing twin boilerfront: 1 kit, - removable and remanufactured acellar panel: 527 pcs, - M-1kV Cu insulated wiring harness for conduit: 185 m. ) keruel line. This garment in this building is not subject to licensing. This co-procuring procedure is an indivisible service for epitheticsak quality. The details are contained in the technical documentation. AK on 321/2015. (X. 30.) on the basis of Article 46 (3) of the Government Decree that only the subject matter of the product, origin, type, procedure, activity, person, patent or trademark specified in the notice of initiation and in the Co are characterized by unambiguous definition of forestkeben toertent, and "or equivalent" should be used under the title. Demonstration of equivalence is the responsibility of AT. In order that the technical documentation can be opened to the interested economic operator in all species.t save the same folder and open the first file (.001) in a suitable program (Windows Explorer, 7-zip, Total Commander, WinRAR) to merge the files. In this case, all documents published under the Bidding Force are selectively accessible.and B. epuelet) for jobs that may not be quantified or broken down by job type. The tasks to be completed are also professionally closely linked, and the implementation of the individual phases requires close coordination. The work does not contain file tasks that can be logically selected from the following, oenallo, they are easy to handle, and it would not be economical to dismantle each epithet, nor would it make sense in terms of responsibility. The integrity of the image can only be assured by the same winning bidder. - 62 (1) - (2) excludes itany reason (KO) shall prevail, the time power (AK) shall exclude the AT, AV, suitably certified GSZ who is under the authority of the prescribed KO or the KO has been co-opted in the procedure. The Kbt. Section 67 (1) para. in the sense that the GSZ testimonial is not maintained by the COs, and that the suitability of the aptitude test is fully met by the Single European Co-Procurement Documentum (EEKD). The Kbt. Section 67 (1) para. GSZ declares in one document that the KOs are not maintained and that the required suitability tests are complete, provides information on the performance of the suitably qualified officers. If the above requirements are suitable for low-cost use, AT mas sthe capacity of the organization, the offer must be submitted to the Kbt from the organization providing its capacities. Section 67 (1) para. and when submitting certificates, this organization shall, except in the case of qualified candidates, be required to provide justification in the same manner as the required certification modalitieshalf offside. The Kbt. Section 67 (4) para. in the meantime, AT must make a declaration to the effect that it will not accept Kbt`s contract performance. Authorities under Article 62 (1) and (2) of the CC shall be subject to the AV. The statement must also be submitted if the AK does not specify the known AVs in the procedure. The Kbt. Section 67 (4) para. statement to the ATn You should also attach it if you do not need to include AV in your contract performance. Prior to soliciting the outcome of the procedure, AK calls upon the KOs with an appropriate time limit to fire the AT, which is considered to be the most advantageous from a commercial point of view, and to obtain the justifications required in the tender notice. The capacityThe certifying body should only provide the certificates with regard to the appropriate auditors. AT on 321/2015. (X. 30.) Korm. Article 62 (1) and (2), subject to the authority of the COs. AK calls attention to Kbt. Section 64 (1) - (2) Possible purification according toin - 1-8 of the Cr. Requirements for suitability for professional activities [Kbt. Article 65 (1) (c)]: SZ.1 The tenderer is unfit if the economic operator carrying out the construction work for the construction industry is not included in the LXVIII. construction of raw materials (Etv.)or in the case of economic operators not established in HUNGARY, in the registration of the country of establishment, or if they do not have a license, license or organizational, chamber membership in the country of establishment. (Section 65 (1) (c) of the Kbt.) Certificate of aptitude for the professional activities: SZ.1in the case of Kbt. In the records referred to in Article 69 (11), the free inspection of the relevant data or breeds shall not be justified by the simple extraction of the extract, a certificate drawn up by the body managing the register or a document certifying the breed in the register. The power of time comesfurthermore, in the case of a non-HUNGARIAN economic operator, the winner must, at the time of the contract, be entered in the records of the relevant professional chamber of the country according to the subject matter of the purchase. they are completeit is difficult to provide detailed information about it. Documents containing detailed information on the performance of suitable tests are provided by AK Kbt. Article 69 (4) of the Kbt. Pursuant to - 65 (1) (a) and - 19 (1) (a) of the Cr.yi account manager penzuegyizintznyz, a statement of the following courtesy, with the following co-authoring and explicit content, depending on when the adviser came to know or began to act, provided that this information was provided: or more than 15 days in a row During the term "Serial", the timekeeping authority defines the term defined in - 2 (25) of Act LXV of 2009. P.2 Pursuant to Section 65 (1) (a) and Section 19 (1) (c) of the Civil Code ATattach a statement of the amount of goods purchased (updated or extended and / or epithetically) for the last 3 calendar days prior to the start of the business year, and when he started his activityif this information is available. If the AT does not have business data for the last 3 business days prior to the commencement of the call, the net receipts for the business of the commencement of its activity shall be subject to the minimum business requirement of the year 2018. . raw 1.- AK draws attention to the definition in - 19 (3) of the Cr. Proof of suitability is provided by Kbt. - 65 (7) - (8), (11), Article 67 (3), Article 69 (11), (11a), Article 1 (7) of the Cr. . IV.2.6) Accuracy: Provisional Trial Benefit 60 days from the date of termination. AK provides on-site baiting opportunities presenthowever, its consultation does not provide an opportunity, nor does it provide additional information. Date: 5/20/2020 9:00 AM. Location: 625 Budapest, Kutvoelgyi ut 6th floor: 10171/5. (Main entrance Porta). For more information see Chapter I.14 of the Documentation. in point. 3rd Valuable: Best ar-ertek gold. Method: ar: reverse, qualitative aspects: straight gold; Score: 0 10. 4.AK applies Kb. - 75 (2) para. e) and Kbt. - 81 (4) to (5). 5. AK does not provide the basic AT to the winner`s AT. K has defined the eligibility criteria for qualified AT records more strictly. The performance of the bid must be monitored in turn in the ECR. - 11, - 12 (1), Kbt. 41 / A. -, 65. - (11a) es (12) be 8. In the offer, the Kbt. Section 66 (6) para. and Kbt. 65 (7) (also in the negative case). T`s professional recommendation is to attach a complete statement in pdf format and in excel format, and a statement of the experts indicating the points of interest. Liability insurance: winnerAT must have at least $ 124, 250, 000 / year minimum epithelial liability insurance of the same amount at least $ 124, 250 / yr from the date of delivery to the contract. Failure to do so shall be qualified as retrospective from contract exams, in which AK is a Kbt. Article 131 (4) may be applied. AK calls attention to being tamogayou have submitted a claim or referral in favor of or otherwise provided to you by this Contract Modification Agreement, this request is not accepted or is not in full or inferior to tacit acceptance, or ifRelevance The Toggle Contract (TSZ) Modification or Variation Notification shall be deemed to be a test case to which the Contractor may choose to test or perform in good faith. In the above sense, AK is Kbt. -- 53 (5) - (6) and the Civil Code. 6: 116th - (1) bottom jar el. AK the terms of the contract which suspend the contracts kikoeti. 13. The procedure is performed by NFSI Ltd. under the name of Semmelweiss University, so the contract award procedure is awarded to Semmelweiss University as customer. AK a Kbt. - 73 (6) para. (c) of the Act would disclose the proposal if the specific cost of the solar system to be verified exceeds 450 000 HUF / kW. THEThe subject purchaser is selected under the terms of the "Framework Agreement on the Enhancement of Nitric Scale Investments Referred to the NFSI Hexagon in Hungary" (TED: 2017 / S 038-068208) within this framework. 16%. Falling Rate: 1% of net business rate / calendar day, up to 25% Performance Guarantee: net business rate5%, available from Kbt. - 134 (6) para. (a). The winner AT shall pay a down payment on the advance from the advance referred to in point III.2.2. The winner AT may deduct the advance from the account window and the bank account until he has been cleared for full consideration. At the very least, the total invoice amount must be accounted for with the full advance payment. Eljaro is a responsible creditorCo-Procurement Specialist: Dr. Zsolt Szabo (Registration number 00824) Detailed information on the above requirements in the documentation and in the draft contract Internet address (URL): http://www.nfsi.hu/
The bid deadline for Contract notice: Construction work was 24 Feb 2020. Bidding is closed.
This tender has been issued by NFSI NEMZETI FEJLESZTÉSI ÉS STRATÉGIAI INTÉZET NONPROFIT KFT. in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45111100 - Demolition work, 45262100 - Scaffolding work, 45262500 - Masonry and bricklaying work, 45324000 - Plasterboard works, 45410000 - Plastering work, 45261310 - Flashing work, 45261400 - Sheeting work, 45300000 - Building installation work, 45310000 - Electrical installation work, 45332200 - Water plumbing work, 45333000 - Gas-fitting installation work, 45421100 - Installation of doors and windows and related components, 45442100 - Painting work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 39916536. The purchaser document reference is 029866-2020.