Expired Tender Hungary ICB TOT Ref. 39432570

Contract notice: Construction work Tender in Hungary - 39432570

Tender notice from Hungary, published on 03 Jan 2020.

Exeutive Summary

The BUDAPEST F?VÁROS III. KERÜLET ÓBUDA-BÉKÁSMEGYER ÖNKORMÁNYZAT has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 03 Jan 2020 and is scheduled to close on 07 Feb 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39432570, while the tender notice number is 001017-2020 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
39432570
Document Ref. No.
001017-2020
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
03 Jan 2020
Bid deadline
07 Feb 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45453100, 45111100, 45430000, 45442100, 45421100, 45260000, 45315100, 45223300, 45000000, 45453100, 45111100, 45430000, 45442100, 45421100, 45260000, 45315100, 45223300
CPV Description: Construction work.
Refurbishment work.
Demolition work.
Floor and wall covering work.
Painting work.
Installation of doors and windows and related components.
Roof works and other special trade construction works.
Electrical engineering installation works.
Parking lot construction work.
Viziorgona u 8. es a Zipernovszky u felujitas
Reference Number : EKR001645622019
1039 Budapest, Viziorgona utca8. and 1-3 Zipernovszky Karoly Street renovation and renovation of real estate under number
Main Site: 1039 Budapest, Viziorgona utca 8.
Viziorgona u. No. 8 total floor area of the epuelet:
1572.8 m2 built-up area to be renovated, 3860 m2 land plot, 17 new, belueli parking lot on the plot, which houses the Keruelet specialty, dental, nursing and pediatric services. In accordance with the new functions, new spaces must be constructed, the walls will be plasterboard partitions. Because of the above, the epuelet must be dismantled to its supporting structure and new epuelet structures must be constructed in accordance with the enormous regulations.as soon as you get a new heat - insulated flat roof.
There is currently no parking on the site. A new covered bicycle guitar for each access. Doctors' Furnishings With Parking Areas With New, Terraced Parking Areas And Their Own Roads
After the demolition of existing partitions, new plasterboard partitions are required
The existing interior arrowheads for any occasionn bontasra keruelnek. New drywall walls can be fitted with new drywall doors for installation.
The existing hot arrow corners will be demolished, but the four-sided door and window of the Heat Center will be removed. steel block housing, thin-walled steel wing insulated panelkeruelek for installation. The epileptic floor has a new fixed exterior lining. On the roof is a new gepeszeti berendings for keruel, which obscure the sound of the environment, and the acoustic lining of the roof. EPS thermal insulating material with new facade thin plaster
Machine:
Functionally divided into 3 sections (Adult, Dental, and Pediatric) for all rivets for seamless washbasins and waterproofing units.At present, it receives heat for heating and DHW pre-heating from a heat center in the MAIN PAV control of the epuelet. In the design, I keep the pond heat as primary energy, but in the heater and the DHW supply, some shells are supplied with electric boilers because of the proper circulation and sea solution. The existing heating network of the epuelet is being broken down in full seakeruel.
The heat sink kit is still very much provided by the compact heat center handled by FŐTAV Ltd.
The refrigeration needs are met by the compact coolest liquid cooler for installation of keruel on top of the epuelet, for installation in the outer space of keruel. The microbubbles combined with the cooling system are used for the extraction of sludge. The cooler dog's fittings are in place of the Feldsin cooler heat center
Electrical:
Existing electrical grid is completely disassembled, and electrical grid is suitable for new requirements and standards in the field. intrusion detection system, video surveillance system, working time recording system, beteghivo system, built-in fire alarm system, uninhibited wash basin system
Continued on III.1.2) Economic and pencil suitability
The procedure cannot be used as a co-worker, subcontractor and cannot prove the suitability of an economic operator, . There are any of the grounds for exclusion listed in - 62 (1) and (2).glass model:
Offeror (koezoes offerer), if applicable, economic operator receiving the suitability certificate in accordance with Act 321/2015. (X.30.) Of the Government of the Republic of Hungary (hereinafter referred to as the CR), by submitting the single European Co-Procurement Document (hereinafter referred to as EEKD), it is necessary to pre-certify the Kbt. The grounds for exclusion mentioned in - 62. are inadequate.The CEDO has created an EEKD template that must be completed in the form of an electronic form. in the garden of information. The statement must include its mAs a matter of fact, Kbt. Article 69 (4) of the Act on the certification of the certificate to be submitted, which body is entitled, and the Kbt. - 69 (11) of the Database and a statement attached to the use of the data, if any. Pursuant to - 67 (4), the Bidder must declare on the electronic form provided in the ECT thatfor the performance of the contract, Kbt. - 62 (1) - (2) excludes sub-contractors subject to the exclusions.
Exclusions shall not supersede the Kbt. Article 69 (4) bases the submission of certificates to economic operators called upon to comply with Articles 8, 10, 12 to 14 of the KR. and - 16.
Attach to the testimonial proposal of - 13 of the KR, in the case of an asbestos registration, the variation registration application filed with the company and the certificate of its registration, which has been negotiated with the company. If the Bidder is not in the process of making a listing entry, a statement regarding his / her palm - in the form provided in the ECR - is also required. 64 of the Kbt. Section 74 (1) Paragraph of the Kbt. On the basis of Article 65 (6), co-authors may also be eligible. The one-on-one correspondence can be interpreted as meaning that at least one of the coezoeists is required to meet the prescribed test on full merits, given that the prerequisite for the subject may be interpreted with certainty., ohas well as Kbt.65. (6) to (7), (9) and (11)
Professional activity. related to alk. requirement:
NY.1.)
AK is registered in the Kbt. Checks in the records referred to in - 69 (11). Registered breeds - if there is no mod in the records in accordance with Section 69 (11) Kbt, or the free inspection of the breeds -Extract, a certificate drawn up by the managing body of the registrar or a document proving the existence of a breed in the register by simple typing. certification of the Kbt. -- 65 (7), (9), 69 (11), (11a) es (12).
NY.1.) Unsuitable bidder if any economic operator making a construction project is an Etv. ofconstruction contractors are not listed in the relevant national chambers of commerce or, in the case of non-resident economic operators, are not registered in the country of establishment (provided that the law of the country of establishment permits, or legal adviser or organizational chamberdoes not have gsag (Section 65 (1) (c) Kbt. and Section 21 (1) of Government Decree 322/2015 (X.30)). refurbishment of real estate II.2.4) Proceedings of co-acquisition:
Construction:
Transportation of mixed construction materials to storage site 1464.14 m3
Demolition of wall 1039.2 m2
Demolition of tiles 922.13 m2
Plastic, carpetcase demolition 1153.24 m2
Application of thin plasters, tinted plasters 1279, 85 m2
Plastic hinged arrow corners, insulated, heat sealed window 117 pcs
Acoustic blinds, fabricator, on site 76 pcs
Feluelvilagito windows 62 pcs
Ceiling pad; 1600 m2
Anti-trouser quilt insulated; Horizontal upside down1413.33 m2
Insulated against trouser quince; 323, 75 m2
Flat roof thermal and acoustic insulation 1413 m2
Facade thermal insulation with uevegszoevethalo reinforcement 1089, 4 m2
Construction of terraced or yard flooring, concrete paving stone 460 m2 concrete 2 m3
Fitted ceiling suspended ceiling 717.78 m2
Metalpartition wall mounted 2x2rtg. normal 12.5mm vtg. plasterboard cover 1360.86 m2
Metal wall mounted partition wall 2x2rtg. impregnated 12.5mm vtg. plasterboard cover 109.65 m2
Creating a lightweight wall with plasterboard 32.88 m2
Interior wall, pillars, columns, small ceramic 542.03 m2
Laying PVC 1216.48 m2
pvc, PVC cover 1388.4 m2
Wood interior arrow corners 108 pcs
Reception desk manufacturer 4 pcs
Installed cabinet 20 pcs
Mounted fuel system, with pads, for shower and toilet showers 7 pcs
Medical cabinet production 27 pcs
Dispersion colored plastic basis with water-dispersion white or dyed paint 4691.84 m2
Insulated against soil moisture 2722.48 m2
Foedem; Floor, heat insulating material placement 1353, 5 m2
Strong weak reinforcement:
NYM-J cable 4x1, 5mm2 1060 m
NYM-J cable 3x2, 5mm2 7390 m
NYM-J cable 3x1, 5mm2 4450 m
Flush-mounted 60x60cm LED Panel Lamp Body 105 pcs
Opalburo Lamp Body Mounted with Ceiling Lamp 85 pcs
Side Wall Mounted Phenolic Soap Opal Coated Lamp Body 41 pcs
Ceiling Mount 30x120cm Opal LED Panel Lamp Housing 61 pcs
Ceiling Mounted Display Lamp Housing 35 pcs
CORNING CAT6A S / FTP 550MHz / 23s LSOH-1, FRNC, 4P 18130 fm
Income Cable 7720 fm
DP2061N Optical Foam Detector 96 pcs
2x1 mm2 fire alarm cable 800 fm
VRM-Turbo, rigid manhole pipe 4700 fm
Machine:
Heating pipes, Welded pipe fitting, PE-RT / Alu / PE-RT 642 fm
Heating pipes, Galvanized antennalese 576 644 fm
Insulation of heating, DHW, HHV lines 928 644 fm
Ivoviz water pipes, Lumbar pipe fitting 1382 fm
PE thick wall polyethylene drain pipe fitting 973 fm
Installing water tanks 29 fittings
Electric hot water boiler installation 20 storage units pcs
Mosdo unit placement 60 pcs
Climate convectors, channel, horizontal 53 pcs
Technological esound insulation of wires of ventilation equipment 729 m2
Installation of ductwork and fittings with a cross section of 669 m2
Installation of ductwork and fittings with a section of Koer 503 m
Landscaping:
Fuevesites 1410 m2
Installation:
PVC-KGEM drainage fittings
1. In the present proceedings, the Kbt. 54, the commissioned commissioner shall, subject toheret in case of case I. 8 million HUF, in case of II. In the case of 2 million HUF. 54 (2). Bidding bank account number: 12001008-00131713-00100007, Details in Documentation
2. All of them are worthy of the Kbt. 76 (2) c) (best values gold), the maximum score is also 0-10:
3. Point-scoring method minIn case of two: The suggestion is the reverse gold certification, the professional experience of the specialists is enhanced, and in the case of direct gold certification. The KB doc. utmutatojaban.
4th Formal information in KB doc. utmutatojaban.
5th The Kbt. On the basis of Section 66 para. Oesses data according to - 68 (4).
6. This co-procurement procedure is based on Kbt. - 53 (Paragraph (6) is based on a keruel initiation because the collateral is not available in full terms relative to the becsuelt. The defined benefits of the co-purchasing procedure are based on the Kbt. Section 53 para. (6) Bidding authority does not accept any request for additional supportas such, or accepting it in a lesser degree than the claimant, is a dogfight that would render the procedure ineffective. If you declare the procedure effective before taking these doentes because you have not received the doentest within the time limits set out in the Kbt, and so the Kbt has not disappeared. Failure to disclose in accordance with Article 75 (2) (a), success of the projectin this case, the Contractor shall have sole control over the Governmental Tamogato Doentese. The Contractor may not complete the work until the Contractor's power of attorney, but must be prepared to commence performance of the Contract without delay. K is the focus of ill health and enlightenment. opportunity in the Kbt. 71 (1) to (10).
8. The date must be AT at aYes. 66. (2) shall be accompanied by an express arrow in accordance with the terms and conditions of the contract, the test and performance of the author and the original counterpart in the garden. 66. (6) and the arrows according to - 67 (4).
10. K is present in Kbt. Article 81 (5) shall apply.
11.AT.will have at least 500 million HUF / year and 200 million HUF / year in the first case, and C.A.R. system, oesszkockazatu (material and liability) epite-insurer.t. Pursuant to Section 134 para. Pursuant to - 134 (5), you must make a statement in your appointment. On the basis of - 30 (4) of the KR, the conditions and attestations of economic and technical and professional competence of the qualified advisers were laid down more strictly than in the official record of qualified advisers. The Kbt. According to - 35 (8) AK does not make it a host organization (projectcompany) in the author 's work. Certificate of Alairas: The offer must be accompanied by an arrow, a document signed by the AT, the sub-contractor, the holder of the capacity, who is included in the certificate of suitability, and / or the Alairasi Cimpeldanyat alairas thinkers. If the quotation is eligible for quotation under me
Internet address (URL): http://www.obuda.hu

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Csongrad Sgt. Road Development, Bicycle Path Construction Hungary 152587320 03 Dec 2026
Complex Renovation of Municipal Apartments / 2026. Hungary 152582982 23 Nov 2026
Execution - Rozsa U. Renovation 2026 Hungary 152551822 17 Dec 2026
Building a Solar System in 2 Parts Hungary 152540975 14 Dec 2026
56-56 Accessibility of Tram Line Platforms Hungary 152540740 01 Dec 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 07 Feb 2020. Bidding is closed.

This tender has been issued by BUDAPEST F?VÁROS III. KERÜLET ÓBUDA-BÉKÁSMEGYER ÖNKORMÁNYZAT in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45453100 - Refurbishment work, 45111100 - Demolition work, 45430000 - Floor and wall covering work, 45442100 - Painting work, 45421100 - Installation of doors and windows and related components, 45260000 - Roof works and other special trade construction works, 45315100 - Electrical engineering installation works, 45223300 - Parking lot construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 39432570. The purchaser document reference is 001017-2020.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.