Expired Tender Poland ICB TOT Ref. 39303783

Contract notice: Construction work Tender in Poland - 39303783

Tender notice from Poland, published on 27 Dec 2019.

Executive Summary

The AMW SINEVIA SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 27 Dec 2019 and is scheduled to close on 29 Jan 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39303783, while the tender notice number is 617391-2019 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
39303783
Document Ref. No.
617391-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
27 Dec 2019
Bid deadline
29 Jan 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 45000000, 45111200, 45216200, 45223200, 45400000, 45000000, 45111200, 45216200, 45223200, 45400000
CPV Description: Construction work.
Site preparation and clearance work.
Construction work for military buildings and installations.
Structural works.
Building completion work. Good n / Kwisa. Task 24239.
Reference Number: SVA / K / 4620-45 / 2019
Subject of the orderand is the performance of a construction industry robot of the disc field construction elements as part of the reconstruction of Joanna's tactical exercise belt at the training ground in Dobre n / Kwisa (task 24239).
Main Site: Dobre n / Kwisa
Description of the order is specified in the project documentation (Annex No. 11 to the ToR), being the basis for the valuation of the order, as well as the bill of quantities (Annex 2 to the ToR), (in the formatath and pdf). Design documentation beyond the subject of the contract should be treated as informative. A valuation of the subject of the contract in the form of a cost estimate, prepared on the basis of cost items included in the bill of quantities, is required. The offer cost estimate is to be prepared in an abbreviated version and must also have: calculated unit price and value for each iteminventory (in terms of KNR, item description, unit of measure and quantity), table of integrated elements, material and quantitative and valuable bill of materials (with unit prices of materials), labor list and equipment list. Note: without the consent of the Employer, you cannot change the position of KNR as well as their quantity and units of measurement, however, it is allowed to change labor, material andequipment in a given position, however, the Contractor must remember that the settlement for the works performed is carried out as an as-built cost estimate with flat-rate unit prices as in the offer cost estimate. In the price of the offer, the Contractor is obliged to take into account all costs related to the performance of the subject of the contract, including the costs of creating, maintaining and decommissioning the construction base (including the social part) innecessary for the execution of the robot, protection of own property, complete and ongoing surveying service, complete as-built documentation, including geodetic as well as development and registration of as-built geodetic map in 4 copies, necessary tests, measurements, tests and regulations as well as related reports, commissioning of the installation, commissioning, trainingservice employees, cleaning works, including ordering the remains of building materials, exporting and utilizing materials (waste), preparing complete documentation enabling obtaining the occupancy permit, costs of participation in acceptance activities. The above works and activities are on the side of the Contractor.
I. By the deadline for submitting the offer, each Contractor is obliged to submit:
1) current statement as at the date of submission of tenders submitted in the form of the Single European Procurement Document (EAT), Annex 4 to the ToR, to the extent indicated by the Employer in the contract notice and to the ToR. The information contained in JEDZ will constitute preliminary confirmation that the Contractor is not subject to exclusion - drawn up in accordance with the Single Order Document Formconstituting Annex No. 2 to the Commission Implementing Regulation (EU) 2016/7 of 5 January 2016 establishing a standard European Order Document form (Official Journal EU L 3/16) in the scope indicated in Annex No. 4 to the ToR. NOTE: EAT and all documents and statements attached to the offer and the offer should be submitted in the manner specified in Part XI of the ToR.
2. In the case of joint applicationfor the order by the EAT Contractors, referred to in paragraph 1 is submitted by each of the Contractors jointly applying for the order. This document is to confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent that each of the Contractors shows no grounds for exclusion. Each EAT is prepared in electronic form, which must be marked with a qualified signatureelectronically, by persons authorized to represent each of the Contractors jointly applying for the contract. resources, conditions for participation in the proceedings are submitted by Uniform Documents (EAT) regarding these entities. JEDZ is prepared in electronic form, which should be provided with a qualified electronic signature by persons authorized to represent entities providing resources. EAT, referred to in paragraph 1 for those afterdwykonawcow. EAT is prepared in electronic form, which must be accompanied by a qualified electronic signature by persons authorized to represent the subcontractor.
II. Contractors who are not subject to exclusion from participation in the procedure pursuant to art. May apply for awarding the contract. 24 paragraph 1 and paragraph 5 point 1 of the Act.
III. List of documents and statements confirming thatThe contractor is not subject to exclusion from the procedure pursuant to art. 24 paragraph 1 and 5 point 1 of the Act. The contractor whose offer has been rated the highest will be invited to submit, within a specified time limit, the following documents:
1) information from the National Criminal Record in the scope specified in art. 24 paragraph 1 item 13, 14 and 21 of the Act, issued not earlier than 6 months before the deadlinesubmitting offers;
2) an excerpt from the relevant register or from the central register and information on economic activity, if separate provisions require an entry in the register or register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Act or will not summon if it obtains them through free and publicly available databases of particular public registers;
3)tolling the Contractor about the lack of issuing a final court judgment or final administrative decision regarding arrears with the payment of taxes, fees or social security or health insurance contributions, or in the case of issuing such a judgment or a decision of documents confirming payment of these claims together with any interest or fines or conclusion binding antlersproperty regarding the repayment of these amounts due - the specimen is Annex 6 to the ToR;
4) the Contractor's statement that he has not been issued a preventive measure against him from applying for public procurement - the specimen is Annex 6 to the ToR;
5) if the Contractor intends to entrust the performance of part of the contract to a subcontractor (who is not an entity on whose abilities or situationand the Contractor relies on the principles set out in Article 22a of the Act) documents listed in point 1) 4);
6) the Contractor within 3 days of posting the information referred to in Art. 86ust. 5 of the Act, will provide the Ordering Party with a declaration of belonging or not belonging to the same capital group as referred to in art. 24 paragraph 1 point 23 of the Act. Together with the declaration, the Contractor may provide evidence that links with another Contractor do not lead to a distortion of competition in the procurement procedure. The statement of belonging or not belonging to a capital group should be made according to the template constituting Annex 3 to the ToR.
IV.
1. If the Contractor has its registered office or place of residence outside the territory of the Republic of Poland, it shallthe documents referred to:
1) point III. item 1) - submits information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial or administrative authority of the country in which the contractor has its registered office or place of residence or the place of residence of the person to whom the information or document relates, the scope specified in art. 24 paragraph 1 point13, 14 and 21;
2) point III. subpoint 2) - submits a document or documents issued in the country in which the contractor has its registered office or place of residence, confirming accordingly that:
a) its liquidation has not been opened or its bankruptcy has been declared.
2. Documents referred to in point IV.1. 1) and 2) lit. a), should be issued not earlier than 6 months before the deadline for submitting bids.
3. ifin the country in which the Contractor has its registered office or place of residence or place of residence the person concerned is, the documents referred to in point IV.1 do not appear. they are replaced by a document containing the Contractor's statement, indicating the person or persons authorized to represent him, or the statement of the person whom the document was to concern, submitted to a notary publicem or a judicial, administrative or professional or economic self-government body competent for the seat or place of residence of the Contractor or the place of residence of that person. The provision of item 2 shall apply accordingly.
4. Contractor having its registered office in the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Polandto which the document referred to in point III applies. item 1), submits the document referred to in item IV.1 item 1) to the extent specified in art. 24 paragraph 1 point 14 and 21 of the Act. If in the country in which the person to whom the document was supposed to reside there does not appear such documents, it is replaced by a document containing the person's declaration made before a notary public or before a judicial authority, administrative or professional or economic self-government body competent for the place of residence of that person. The provisions of item 2 shall apply accordingly.
Contract changes:
1. Based on Article. 144 section 1 point 1 of the Public Procurement Law, the Employer allows changes to the provisions of the concluded contract in the event of circumstances that could not have been foreseen at the time ofcontract agreement, among others in the case of:
1) force majeure, having a direct impact on the date of execution of the robot (e.g. natural disasters, strikes) or the occurrence of atmospheric conditions (prolonged rainfall, long-term low temperature, etc.) preventing the execution of the robot to such an extent that the date of execution may be at risk The Employer allows the possibility of extending the deadline,
2) the occurrence of unforeseen works affecting the proper performance of the subject of the contract, the implementation of which requires the extension of the basic contract - the Employer allows the possibility of extending this period by the period necessary for the implementation of the above-mentioned robot and the change in the contractual remuneration,
3) serious discrepancies between the design documentation and the actual statethose causing the need to suspend the work confirmed by the supervision inspector in the construction log, the Employer allows the possibility of extending the deadline for the implementation of the works and changing the way the subject of the contract is completed,
4) the occurrence of any replacement or unfinished works - the Employer allows the possibility of changing the contractor's remuneration,
5) the key change Staff ordersor the Contractor, including a change of the robot manager on behalf of the Contractor who meets the requirements contained in the ToR, after prior arrangement of the personnel with the Employer,
6) occurrence of objective reasons, including circumstances for which the Employer is solely responsible or circumstances arising from activities of the Direct Investor RZI Zielona Gora (e.g. extension or shorteningtask completion date, a significant change in the project documentation) The Employer allows the possibility of changing the deadline for completing the subject of the contract, changing the contractual remuneration, and changing the way the subject of the contract is implemented,
7) when the changes are beneficial for the Employer and are in the public interest
8) statutory changes to universally binding legal regulations in the area ofvalue of the tax rate on goods and services, the Employer allows a change in the gross contractual remuneration,
9) changes in generally applicable law to the extent that affects the performance of the subject of the contract. ) occurrence of techor other reasons affecting the date of the contract, which the parties will not have an impact on. The Employer allows changing the date of the contract.
2. By entering the proceedings, the Contractor is required to lodge a security deposit: PLN 390, 000.00 (say: three hundred and ninety thousand zlotys 00/100). Requirements regarding the bid bond as per Part IX of the ToR.
3. finishesthe employee is bound by the offer for a period of 60 days from the day on which the offer submission deadline expires.
4. The awarding entity informs that in these proceedings art. 24aa section 1 of the Act, i.e. the Employer will first evaluate the bids and then examine whether the Contractor whose bid was assessed as the most favorable is not subject to exclusion;
5. According to art. 93 item 1a of the Public Procurement Law Actthe aviator may annul the procurement procedure if the funds which the Awarding Entity intended to allocate to finance the whole or part of the contract were not awarded to him.
Internet address (URL): http://www.amwsinevia.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 29 Jan 2020. Bidding is closed.

This tender has been issued by AMW SINEVIA SP. Z O.O. in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45111200 - Site preparation and clearance work, 45216200 - Construction work for military buildings and installations, 45223200 - Structural works, 45400000 - Building completion work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 39303783. The purchaser document reference is 617391-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.