Executive Summary

The ???????? ??????????? „??. ??????? ????????“ has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 17 Dec 2019 and is scheduled to close on 20 Jan 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39009249, while the tender notice number is 596246-2019 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
39009249
Document Ref. No.
596246-2019
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
17 Dec 2019
Bid deadline
20 Jan 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 45000000, 45000000, 71321000, 45000000, 71321000
CPV Description:
Engineering design services for mechanical and electrical installations for buildings.
Engineering - design and execution of construction and assembly works and supervision, of premises (laboratories), located in the Faculty of Agriculture and Forestry, owned by Sofia University "St. Kliment Ohridski "
This public contract is with the subject" Engineering - design and execution of construction and assembly worksyou and the supervision of the premises (laboratories) at the Faculty of Philosophy and the Faculty of Philosophy of Sofia University "St. Kliment Ohridski "and was commissioned to improve the working conditions, deployment of new equipment, adaptation of electrical, plumbing and HVAC installations under project BG05M2OP001-1.001-0008. The scope, scope and requirements for implementation of the OP are detailed and regulated in the technical specifications of Part II "Technical sleepquotations and conditions for the execution of the contract "from the documentation for the participation of the contracting authority. The execution of the contract includes the following main types of activities:
Main Site: Faculty of Chemistry and Pharmacy (FHF) of Sofia University" St. Kl. Ohridski ", James Blvd. Boucher # 1, Premises Nos. 300 and 304 and the Faculty of Physics (FZF), 5 James Boucher Blvd., Premises № 4, 104, A104, 212, 304.
The object of this publicand the contract is "construction" within the meaning of Article 3, paragraph 1, item 1 of the Public Procurement Act. The selected contractor shall perform engineering activities - design and execution of construction works and supervision of the premises (laboratories) located at the Faculty of Chemistry and Pharmacy (FHF) and the Faculty of Physics (FZF) of Sofia University "St. Kliment Ohridski", and the following premises will be renovated:
- LaNanostructured Plasma Deposition and Fluid Treatment Laboratory (No 4),
- Electroacoustic Electrolyte and Resonance Tensiometry Laboratory (No A 104),
- Laser Laboratory (White Room) her "No. 104),
- Laboratory for laser technology (LLT, room №212),
- Laboratory for laser technology (LLT, room №304),
- Laboratory for thermal analysisliz (room №300),
- Laboratory of Applied Electrochemistry (room №304).
The contract is awarded with the purpose of improving working conditions, placement of new equipment, adaptation of Electro, plumbing and HVAC installations, under project BG05M2OP001-1.001- 0008, "National Center for Mechatronics and Clean Technologies" - Center for Excellence. Activities: Activity 1 - Preparation of investmentproject in the phase of technical design, for the construction activities envisaged in the terms of reference, including the necessary work details for the needs of the site, in accordance with the scope and scope, regulated in the Spatial Planning Act and in accordance with the regulatory requirements of Ordinance No. 4/2001 on the scope and content of investment projects, as well as the specific requirements set out in the documentation
Activity 2- Carrying out of construction works in the laboratories of HFCs and HFs, which are in a very poor condition in order to adapt them to additional functions, placement of new equipment, renovation of Electro, plumbing, HVAC installations, putty on walls and ceilings. Substitution of materials with antibacterial, chemical resistant flooring, furniture renovation, etc. is envisaged.
Activity 3 Exercise of copyright supervisionduring the construction of the site.
4. Preparation and submission by the contractor of a detailed safety and health plan.
5. Submission by the CONTRACTOR of the relevant documentation accompanying the submitted materials and elements / technical certificates and specifications / for approval by the Contracting Authority through his representatives.
6. Securing and cleaning the surrounding areaspace around and within the site, as well as the removal of construction and other waste resulting from the repairs being carried out.
7. Completion of construction and preparation of executive project (if necessary);
8. Guarantee maintenance of the construction works, including the elimination of manifest defects during the operation, within the terms and conditions specified in the Contract for the procurementand the annexes thereto, and in accordance with the applicable legislation in the field in the country.
The investment project developed in the "Technical project" phase is in the following parts:
a) - Architecture part capture and quantitative account;
b) - Part "Constructive" constructive opinion;
c) - Part "Electric" and quantitative account;
d) - Part "Plumbing" and quantitative account;
e) - Part "HVAC" and carshonest account;
f) - Energy Efficiency Part;
g) - Safety and Health Plan; h) - Fire Safety;
i) - Construction Waste Management Plan;
j) - Part "Accounting Documentation" technical specifications, quantitative accounts;
The materials intended for incorporation into the construction works must have assessed compliance with the material changes set out in the Technical ActThe participant must have a registration in the Central Professional Register of Builders (CPRC) with the Chamber of Builders in the Republic of Bulgaria for the completion of the fifth category of construction, according to Art. 137, para. 1, Vol. 5, b. "D" ZUT - reconstructions, reconstructions, major repairs and change of purpose of the constructions in this category, and for foreign persons in analogical registers according to the legislation of the Member State in which they are established or equivalent.
When submitting a tender, participants declare compliance with the selection criterion by completing Section A: Eligibility in Part IV: Selection Criteria of the Single European Document for public procurement (OEDOP). This requirement is proved by documents under Art. 60, para. 1 of the PPA a copy of docthe certificate for registration in the CPSU with the Bulgarian Construction Chamber for the execution of the fifth category of construction, in accordance with Art. 137, para. 1, Vol. 5, b. "D" ZUT - The participant must have a registration in the Central Professional Register of Builders (CPRC) with the Chamber of Builders in the Republic of Bulgaria, for the execution of the fifth category of construction, in accordance with Article 137, paragraph 1, item 5, b. "Z" ZUT - reconstructionlessons, reconstructions, major repairs and change of purpose of the construction of this category. For foreign persons, an analogous document proving such registration in a similar register, in accordance with the law of the Member State in which they are established or equivalent. Prior to the conclusion of the procurement contract, the Contracting Authority shall require the participant designated as Contractor to provideavi up-to-date documents proving the fulfillment of the above requirement, namely: a copy of the document for registration in the CPSU with the Chamber of Builders in the Republic of Bulgaria for the execution of construction of the fifth category, according to Art. 137, para. 1, Vol. 5, b. "D" PTA. At the conclusion of the contract, the selected foreign contractor shall submit a document proving that he is entitled to fulfilldoes not have the assigned activity in the Republic of Bulgaria, including that it has completed the relevant registration in accordance with the Law on the Construction Chamber in connection with Art. 112, para. 1, item 4 of the Public Procurement Act
Note: In case of participation of an association, which is not a legal entity, compliance with the requirement is proved by those members of the association, which is in accordance with the distribution of the participation of the persons in performingthe activities provided for in the merger agreement are committed to the execution of the works. Where the tenderer envisages the participation of subcontractors, the requirement shall be proved for those subcontractors who, in accordance with the type and proportion of the contract they have been awarded, will carry out the works.o and construction.
Certification:
When submitting the offer, the participants declare their compliance with the selection criteria in OEDOP, section B: "Economic and financial situation" in Part IV: Selection criteria. option indicates the web address, authority or service issuing the document, the exact reference of the document.lidna insurance "Professional liability of participants for construction supervision and for the activity of assessment of the conformity of investment projects under Article 171 of the Spatial Planning Act or equivalent for non-residents, in accordance with the legislation of the state in which they are established.
The requirement is proved by document under Article 62, Paragraph 1, Item 2 of the Public Procurement Act - evidence for the presence of insuranceprofessional responsibility ";
The participant designated as a contractor submits the documents before signing the contract, a certified copy of the concluded / valid professional liability insurance within the meaning of Art. 171, para. 1 of the Law on Spatial Planning in connection with the Ordinance on the Terms and Conditions for Compulsory Insurance in Design and Construction, covering the Minimum Insuranceamount for the activities concerned or equivalent for non-residents, in accordance with the law of the country in which they are established. When, for a valid reason, the tenderer is unable to produce the documents requested by the contracting authority, he may prove his economic and financial standing by any other document which the contracting authority considers appropriate.The subject of the contract is: "Engineering design and execution of construction and erection works, and copyright supervision of premises (laboratories), located in the Faculty of Natural Sciences and FZF, owned by Sofia University" St. Kliment Ohridski ", in order to improve working conditions, deployment of new equipment, adaptation of Electro, plumbing and HVAC installations, under project BG05M2OP001-1.001-0008, " NATIONAL MECHATRON CENTERIKA AND CLEAN TECHNOLOGIES "- Center of Excellence with financial assistance from the European Regional Development Fund (ERDF) under Priority Axis 1" Research and Technological Development of Operational Program "Science and Education for Intelligent Growth" 2014-2020 Any Bulgarian or foreign FL / YL, as well as their associations, may participate in the procurement procedure.meet the conditions of Art. 10, para. 1 of the PPA and the requirements of the Voz. The circumstances under Art. 54 para. 1, Art. 55, para. 1, items 1, 3, 4 and 5 of the Public Procurement Law, Art. 3, item 8 and art. 4 ZIFODRIUPDRKTLTDS. and Art. 69 of the CITAA, and the conditions under Art. 107 PPL. The information on the lack or presence of the circumstances under item 54 para. 1, Art. 55, para. 1, items 1, 3, 4 and 5 of the Public Procurement Law, Art. 3, item 8 and art. 4 PETROLEUMPRTRTTDS. and Art. 69 of the Law on Public Offering of Public Offices are completed in the EDES in Part III, Sections A, B, C and D. Modification of concluded OP contract is allowed by way of exception, according to the applicable hypotheses under Art. 116 PPL. The contractor selected before signing the contract submits a dock. under Art. 58 of the Public Procurement Act. The method of payment is regulated in section I, item 9 of the participation documents and in Art. 5 of the draft contract. under the bank guarantee, respectivelythe contributor of the guarantee amount or the holder of the insurance.
1.3. Where the guarantee is presented in the form of a cash or bank guarantee, then it may be provided on behalf of the Contractor on behalf of a third party guarantor.
1.4. The bank charges for opening the bank guarantee shall be borne by the Contractor. The contractor must anticipate and pay its opening feesand servicing the guarantee in such a way that the amount of the guarantee received by the Contracting Authority is not smaller than the one defined in this procedure.
1.5. Where the security to secure the performance of the contract is presented in the form of insurance, the guarantee shall guarantee the performance by covering the contractor's liability to the extent of 4% of the value of the contract for the duration of its contract.and 30 days after its expiration as the insurance contract is concluded by the Contractor in favor of the Employer (third beneficiary). All elements of the insurance contract are agreed and approved in advance by the Client. All costs of concluding the insurance contract shall be borne by the Contractor. The contractor is obliged to pay the premiums due to the insurer, forto maintain insurance coverage of 4% of the value of a contract for the duration of its validity and 1 month after its expiration, so that the amount of the guarantee received by the Contracting Authority is not smaller than the one defined in this procedure. The conditions and terms for retention and release of the guarantee, respectively the conditions for absorption of the insurance, shall be specified in the contracttake a contract.
OP documentation is available for unrestricted and full access to: https: //www.uni-sofia.bg/index.php/bul/universitet_t/administraciya/otdel_obschestveni_por_chki/profil_na_kupuvacha/proceduri_sled_15_04_2016g/otkriti_proceduri/inzhenering_proektirane_i_izv_rshvane_na_smr_i_avtorski_nadzor_na_pomescheniya_laboratorii_nahodyaschi_se_v_fhf_i_fzf_sobstvenost_na_su_sv_kliment_ohridski
Internet address (URL): http://www.uni-sofia.bg

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 20 Jan 2020. Bidding is closed.

This tender has been issued by ???????? ??????????? „??. ??????? ????????“ in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 71321000 - Engineering design services for mechanical and electrical installations for buildings.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 39009249. The purchaser document reference is 596246-2019.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.