Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45000000, 45200000, 45221111, 45236000, 45232130, 45233000, 45233200, 45233220, 45233222, 45233250, 34993000, 45112000, 45112500, 45111291, 45211360, 45000000, 45200000, 45221111, 45236000, 45232130, 45233000, 45233200, 45233220, 45233222, 45233250, 34993000, 45112000, 45112500, 45111291, 45211360
CPV Description: Construction work.
Works for complete or part construction and civil engineering work.
Road bridge construction work.
Flatwork.
Storm-water piping construction work.
Construction, foundation and surface works for highways, roads.
Various surface works.
Surface work for roads.
Paving and asphalting works.
Surfacing work except for roads.
Road lights.
Excavating and earthmoving work.
Earthmoving work.
Site-development work.
Urban development construction work.
Main contract concerning Sub-project 022 Construction site at the service town and kitchen (DP022)
The main contract comprises the execution of construction work for the construction site of the building site at the upcoming service city and the kitchen at Nyt Odense (New OUH)
Main Site: Odense, Denmark
Region of Southern Denmark offers subproject 022 (DP022) for New Odense University Hospital (New OUH), which includes the completion of construction and civil engineering works for the construction of part of the building site. The building ripening includes the area where the service town and the kitchen are to be erected later.
The following must be carried out as follows:
- Establishment and clearing of workspace,
- Excavation, relocation and removal of soil and soil,
- Paving of miness, asphalt and paving stones,
- Establishment of drainage system incl. connection for road drainage,
- Establishment of lighting incl.
The building ripening itself is divided into 2 stages.
1) Stage expected to be initiated in Week 8 of 2020 - The plot is cleared of mud and
main drainage of the plot is established before the pipe is dug, after which access roads and paths can be established.
Afvandin
2) Stage includes the establishment of fixed coatings in asphalt on bicycle path as well as grass reinforcement on fire road and
access road. In addition, loading ramps, maneuvering area and the roadway in concrete paving stones are established. In areas where no fixed coating is established, mud is laid out and grass is sown. For practical reasons, the second stage is initiatedFirstly, when the contracts for the DP09 service city and the DP37 kitchen are completed with the external works respectively,
The building development includes main lighting. since it is essential that the tenderer's business consists of h
The bidder must disclose the total annual turnover for the last 3 financial statements in ESPD Part IV, Section B.
In addition, the tenderer must disclose the size and equity ratio (equity / total assets) of the last 3 financial statements in ESPD Part IV, Section B
The tenderer may rely on the form of other entities (eg a parent or sister company or a subcontractor, ) regardless of the legal nature of the relationship between the company and these other entities. Where necessary, the company must fully demonstrate the resources needed to fulfill the contract, for example, by providing a declaration of support for the legal obligation of these entities to provide the necessary resources during the contract period.participant alone, but based on the capacity of one or more entities, must ensure that the developer receives his or her own European single tender document and, in addition, in a separate single European tender document, provide relevant information for each of the units on which it is based.
When groups of economic operators (eg a consortium) participate in the tendering process together, in addition, one for each of the participating economic operators is to fill out a separate common European tender document. The information in the ESPD is used as preliminary evidence that the tenderer meets the minimum requirements set out below.
Region of Southern Denmark uses the tender portal Viewpoint in connection with this tender. The scope and terms of the assignment are described in detail in the complete tender material, which is fully availableavailable at: https://download.4projects.comDocumentID=5ce66662-6f05-4a32-a7fb-377716808785&VC=true e-mail:
[email protected] or by email. telephone: 453145 4603.
In order to ask questions and submit offers, a supplier directory must be created at Viewpoint. To be created in Viewpoint, the following information must be providedn to Region of Southern Denmark:
- Company name,
- Email address of the person accepting the link to the portal,
- Person name above.
Request for creation in Viewpoint is sent to the email address:
[email protected] 1-2 business days from proper receipt of request for
creation.
Offeror will, as part of the creation of Viewpoint, take an invitation to Viewpoint, which the tenderer must accept in order to ask questions and submit offers. The invitation must be accepted at the latest at the time specified in the schedule, cf. 3.
Only one person can be created in Viewpoint via the creation link. Subsequently, the person who received the creation link can create other participants from the tenderiversity.
Any correction sheets and questions / answers to the tender documents will be published via the same tender portal.
It is up to the tenderer to verify that access to the digital tender portal works.
Internet address (URL): http://www.regionsyddanmark.dk