Contract notice: Construction work Tender in Poland - 37685358
Tender notice from Poland, published on 04 Nov 2019.
Exeutive Summary
The SAMODZIELNY PUBLICZNY SZPITAL KLINICZNY NR 4 W LUBLINIE has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 04 Nov 2019 and is scheduled to close on 05 Dec 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 37685358, while the tender notice number is 519083-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45111000, 45262000, 45400000, 45331000, 45310000, 45316000, 45321000, 45343100, 45330000, 45331210, 45333000, 45331200, 45000000, 45111000, 45262000, 45400000, 45331000, 45310000, 45316000, 45321000, 45343100, 45330000, 45331210, 45333000, 45331200 CPV Description: Construction work. Demolition, site preparation and clearance work. Special trade construction works other than roof works. Building completion work. Heating, ventilation and air-conditioning installation work. Electrical installation work. Installation work of illumination and signalling systems. Thermal insulation work. Fireproofing work. Plumbing and sanitary works. Ventilation installation work. Gas-fitting installation work. Ventilation and air-conditioning installation work. Reconstruction of rooms on the first floor of the FNG block for the needs of the Cardiology Clinic Reconstruction of rooms on the first floor of the FNG block for the needs of the Cardiology Clinic Reconstruction of rooms on the first floor of the FNG block for the needs of the Cardiology Clinic at the Independent Public Clinical Hospital No. 4 in Lublin at ul. Jaczewskiego 8 in Lublin, POLAND. Detailed requirements for the abovementioned of the order assortment, its quality standards and scope of the order include: project documentation, STWiORB and bills of quantities. 1. Contractors who can apply for the contract who: 1) are not subject to exclusion pursuant to art. 24 paragraph 1 point 12 -23, paragraph 5 points 1 and 8 of the Act; 2) meet the conditions for participating in proceedings in artissues: a) competences or powers to conduct a specific professional activity, if it results from separate provisions (the Employer does not formulate a description of how to assess this condition); b) economic or financial situation by which it is understood that the Contractor has financial resources at the bank or cooperative savings and credit union or creditworthiness for the total amount - coat least PLN 1, 000, 000; c) technical or professional capacity, which means that the Contractor: C1) during the last 5 years before the submission deadline, and if the period of business activity is shorter in that period: he completed 2 construction works (each with a value of not less than PLN 2, 000, 000.00 gross) consisting in construction (or reconstruction), where construction and assembly worksopen work were carried out in an active facility; C2) The Contractor has and directs to execute this contract persons authorized to manage construction works without restrictions covered by the subject of the contract, i.e. at least: - 1 person authorized in construction and building specialization with at least 5 - years of professional experience as a site manager, - 1 person with qualifications in the electrical industry and having at least 3 years of professional experience as a manager of electrical works, - 1 person with qualifications without restrictions in the installation specialty in the field of heating networks, installations and equipment, ventilation, gas, water and sewage systems and having at least 3 years of professional experience in the stateof the head of sanitary works. The construction manager should have building qualifications in accordance with the Act of 7.7.1994 Construction Law (consolidated text Journal of Laws of 2019 item 1186) and on the principles arising from the principles set out in the Regulation of the Minister of Infrastructure and Development of 11.9.2014 on independent technical functions in construction (consolidated text Journal of Laws of 2014, item 1278) or the corresponding valid building permits, which were issued on the basis of previously binding provisions. In accordance with art. 12a of the Construction Law - independent technical functions in construction, as defined in art. 12 paragraph 1 may also be performed by persons whose relevant professional qualifications have been recognized on the principles set out in separate provisions. Regulation separate statethese are the provisions of the Act of 22.12.2015 on the principles of recognition of professional qualifications acquired in the Member States of the European Union (i.e. Journal of Laws of 2018, item 2272, as amended). 2. Potential of the third party: 1) The Contractor may, in order to confirm compliance with the conditions for participation in the proceedings in appropriate situations and in relation to a specific contract or part thereof, rely on the ability totechnical or professional or financial or economic situation of other entities, irrespective of the legal nature of the legal relations that connect it with it. 2) The Employer informs that the "relevant situation" referred to in item 1) will occur only when: a ) The Contractor, which relies on the abilities or situation of other entities, will prove to the Employer that by carrying out the contract he willzie had the necessary resources of these entities, in particular, presenting the undertaking of these entities to make available to him the necessary resources for the implementation of the contract (taking into account at least the information provided in point c); Cd. from section III.1.1 1. To confirm compliance with the conditions for participation in the procedure and to show that there are no grounds for exclusion = Contractors mthey must send to the Purchaser's purchasing platform located at https://spsk4lublin.eb2b.com.pl/: a) a current statement as at the date of submitting the offers in the form of a single European order document (hereinafter: EAT according to Annex 4 to the ToR) . The information contained in the statement will constitute preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participationin the proceedings. Note: The Contractor may limit himself to completing the "alpha" section in Part IV and does not need to complete any of the other sections in Part IV. EAT. each of the Contractors jointly applying for the order.These statements are to confirm complianceconditions for participation in the procedure and no grounds for exclusion to the extent that each of the Contractors shows that they meet the conditions for participation in the procedure and no grounds for exclusion. entities are sent to EAT a third party. EAT should be completed in ordertopics in which the Contractor refers to their resources. EAT must indicate the absence of grounds for exclusion against them (in the same way as the Contractor) and compliance, to the extent that their resources are cited, of the conditions for participation in the procedure. This applies both if the third party is not a subcontractor during the performance of the contract, and if such a subcontractorshall be. A3) The contractor who intends to entrust the performance of part of the contract to subcontractors indicates the parts of the contract which he intends to entrust to subcontractors and provides the companies of these subcontractors in the EAT form (no evidence of absence of grounds for exclusion from participation in the procedure is required); b) if the Contractor relies on the abilities and situation of othersentities - submit together with the offer the undertaking of these entities (in the original in the form of an electronic document signed by a qualified electronic signature by the authorized person representing the entity on whose abilities or situation the Contractor relies, referred to in Chapter 4 point 2.2 letter a) of the ToR. Documents and statements made at the request of the Employer 3. Ordering in front of the thighordering will call the Contractor whose bid has been highest rated to be submitted by sending to the purchasing platform of the Ordering Party - within the set time limit, not shorter than 10 days, valid as at the date of submission - the following statements or documents confirming the circumstances referred to in art. 25 paragraph 1 of the Public Procurement Law and chapter 4 of the Terms of Reference: 1) list of construction works completednot earlier than in the last 5 years before the deadline for submission of tenders, and if the period of business activity is shorter in this period, together with the type, value, date, place of performance and entities for whom these works were performed, with Attachment of evidence specifying whether these works have been properly performed, in particular whether or notthe works were carried out in accordance with the provisions of the construction law and correctly completed, the evidence referred to are references or other documents issued by the entity for which the works were carried out, and if for a justified reason of an objective nature the Contractor is not able to obtain these documents other documents; 2) bank or cooperative informationj savings and credit union, confirming the amount of financial resources or creditworthiness of the Contractor, not earlier than 1 month before the deadline for submitting bids; (cont. in the section below "standards") 2. The contract may be amended in insignificant matters and in the case of: 1) in terms of remuneration: in the event of a change in VAT rates - the gross price will not be subject totitration, there will only be a corresponding change in the net price; 2) in terms of the deadline: a) in connection with the need to perform replacement or additional works, which prior performance determines the performance of the basic works, the deadline for the implementation of this contract may be extended, but not longer than by duration of these circumstances; b) changes in the implementation and financing schedule related toconnected with the technology and organization of the construction process - the Employer shall inform the Contractor in advance 14 days in advance of changes to the arrangements contained in the implementation schedule; c) in the event of changes in the value of individual works or deadlines for their implementation - the Parties allow transfers between individual periods; such a change does not extend the duration of the contract; 3) in the case ofchange, resignation from the subcontractor, if the subcontractor does not perform work with due diligence, has been liquidated, the contract linking him with the Contractor has been terminated, the changes will be made in accordance with the procedure described in - 6; 4) in the case of entrusting a new scope of subcontractor or changing the scope part of the work entrusted to the subcontractor, if: a. the contractor must entrust works with a doublethe contractor is caused by the termination of the employment contract with employees performing work in a given industry in a number that prevents the Contractor from carrying out the work; b. the introduction of a new subcontractor will ensure better performance of the part of the contract; c. the need to entrust the work of a subcontractor is the result of a change in the technology of the robot or materials; d. in case of delays it will ensure timely deliveryperformance of the subject of the contract, subject to the mode described in -6; - changes will be made in accordance with the mode described in - 6; 5) in terms of personnel: there has been a change in persons performing specific functions a new person on the part of the Contractor may not have lower qualifications and experience than the requirements given in the ToR. 3. If the change or resignation from the subcontractor concerns the entity to whichthe Contractor referred, on the principles set out in art. 22a paragraph 1 of the Public Procurement Law, in order to demonstrate compliance with the conditions for participation in the procedure, the Contractor is obliged to demonstrate to the Employer that the proposed other subcontractor or Contractor independently fulfills them to a degree not less than the subcontractor, whose resources the Contractor referred to during the proceedings forawarding the order. Internet address (URL): https://spsk4lublin.eb2b.com.pl/
The bid deadline for Contract notice: Construction work was 05 Dec 2019. Bidding is closed.
This tender has been issued by SAMODZIELNY PUBLICZNY SZPITAL KLINICZNY NR 4 W LUBLINIE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45111000 - Demolition, site preparation and clearance work, 45262000 - Special trade construction works other than roof works, 45400000 - Building completion work, 45331000 - Heating, ventilation and air-conditioning installation work, 45310000 - Electrical installation work, 45316000 - Installation work of illumination and signalling systems, 45321000 - Thermal insulation work, 45343100 - Fireproofing work, 45330000 - Plumbing and sanitary works, 45331210 - Ventilation installation work, 45333000 - Gas-fitting installation work, 45331200 - Ventilation and air-conditioning installation work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 37685358. The purchaser document reference is 519083-2019.