Contract notice: Construction work Tender in Hungary - 37328509
Tender notice from Hungary, published on 22 Oct 2019.
Executive Summary
The NFSI NEMZETI FEJLESZTÉSI ÉS STRATÉGIAI INTÉZET NONPROFIT KFT. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 22 Oct 2019 and is scheduled to close on 20 Nov 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 37328509, while the tender notice number is 495616-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45300000, 45320000, 45321000, 45331000, 45350000, 45443000, 45453100, 45000000, 45300000, 45320000, 45321000, 45331000, 45350000, 45443000, 45453100 CPV Description: Construction work. Building installation work. Insulation work. Thermal insulation work. Heating, ventilation and air-conditioning installation work. Mechanical installations. Facade work. Refurbishment work. KK Dunakeszi Radnoti Miklos Gimnazium Reference Number : EKR000777252019 KK Dunakeszi Radnoti Miklos Gimnazium epueletenergetikai fejlesztese Main Site : 2120 Dunakeszi, Bazsanth Vince utca 1No. 0: 4399 / 1. A 435/2015. (XII. 28.) Government of the Republic of Hungary on the tasks of the Contracting Authority co-opted for the co-financing of the project of the Environmental and Energy Efficiency Operational Program 2014-2020 (hereinafter: KEHOP).jarasok lebonyolitas. Accordingly, the subject matter of this co-procurement procedure is the implementation of the same number of projects under the title "Co-Procurement Documents in the Project" of KEHOP-5.2.2-16-2016-00040 entitled "Epueletenergy Development of Educational Interests in Pest County". Pest County 4399/1 HRSZ, 2120 Danubekeszi, Bazsanth Vince street 10. (Dunakeszi Radnoti Miklos Gimnazium) epuelete (s). These epuelet (s) are eputel (s) at the technological level corresponding to the epitome age, but borderline structures and obsolete, inadequately sealed arrow corners and machining equipment do not meet the significant heat and epocompetitive hurdles of the present era, hőveszteseggel work. The epuelet energy investment includes the post-heat insulation of hot-walled wall-mounted wall structures, heating and cooling, ventilation systems upgrades, the installation of a heat and heat removal system (RWA), and the installation of an electricity generating solar panel system. (IV.24.) TNM Annex No. 5 to the co-op optimized co-operative levelo With the highest degree of efficiency, the energy savings of the plant operator must be saved. The facade walls of the epuelet (s), the bases and the flat roofs must be insulated. The flat roofs are always insulatedand upgrading the flat roof cover against quilt quilting with any additional work that may be required. To replace the fa-ade arrowheads that are not suitable for today's energy requirements, to modern heat insulated structures (Uw = 1.15 W / mK) also a heat exhaust system (RWA). You also need keruelniuek heat exchangers for installation. Ventilation and treatment system for heat recovery to be developed. In addition, you will need to install a solar system. Main Planned Quantities of Epuelet Energy Renovation / Modernization Site Design Activities: Fa-ade Arrow Replacement for Work Fa-ade Arrow Replacement 932.96 m Fueggoeny wall 497.13 m Felvelvilagite replacement 505.74 m Fixed lamellar shingles 55.9 m Roof post insulation with related work Roof insulation with roof demolition 1190.37 m Flat roof thermal waterproofing 3266 m Arkaded heat insulation 68.59 m Exterior heat insulation of facade with related work XPS heat insulation system for facadefilling of OTSZ rock wool with flame retardant acids 1648.72 m Modernization of Epueletgepeszet heating system, construction of boiler-house with related work Replacement of gas-boiler for condensing boiler with electric, gas-gas and heating-side 1kW = 18 Qn = 2 Qn = 311kW Replacement of thermostatic valve and non-return valve, mounted on heater 234-234 pcs Rooftop, with gas, heat recovery, inconstruction work on the stern and electrical installation of the refrigerated machine Thermal load: 60 kW; Heating capacity: 55.8 kW 9000 m3 / h 1pcs Epuelet piping system with mounting fixtures 2360 m Installation of DHW and buffer tank 3 pcs 2 Heat extraction (RWA) system related to the work 1 cost No Kizaro reasons can be suggestive, sub-contractor and cannot buyin proof of suitability, he is an economic operator to whom - 62 (1) to (2) of the Civil Code does not apply. Any of the exclusions listed above apply. The AT (in the case of koezoes suggestion is kueloen-kueloen) and -65 (7) Kbt. (X.30.) Government Decree 321/2015 (X.30.) (hereinafter: Cr.) As stated in this chapter, the single europeBy submitting a Co-Procurement Document (hereinafter: EEKD), you must first confirm that you do not fall under Section 62 (1) and (2) Kbt. ala.The EEKD shall be attached to the bid in the electronic co-purchasing system (hereinafter referred to as "EKR"). 41 / A.- (5) para. Based on. AT is further required to declare that the Contractor will not comply with - 62 (1) and (2) Kbt. according to Kizaroa sub-contractor who does not receive a certificate of aptitude (based on the ECR form). on the basis of the sub-contractor accepting the suitability certificate, only the EEKD shall be provided in order to justify the exclusion reasons contained in -62 Kbt. 69 (11a). AK under the Kbt. -- 69 (4) - (6) theOn the other hand, Articles 1 (2) - (5) and (7) and Articles 8, 10, 12-16 of the Cr. .A Kbt. - 62 (1) (k) (kb), in respect of AT's statement that it is a corporation which has a statute of LIII. raw material (hereinafter referred to as "penzmosasrol") as defined in Article 3 (38) (a) to (b) or (d)If the economic operator does not have a legal owner within the meaning of Article 3 (38) (a) to (b) or (d) of the penzmosasrol wine license, a statement to that effect is required attach.In the case of an ongoing variation entry procedure, the AT will offerit is necessary to attach the variation registration request submitted to the company and the certificate of its registration (including the declaration of non-content). AK draws attention to the provisions of - 1 (7) of the Cr. - 64 (1) to (2). A final or final decision advising a non-exclusive trainat the same time as it is submitted in the ECT. Requirements for suitability for professional activities [Kbt. - 65 (1) (c)]: SZ / 1.The contractor's performance is inadequate if the economic operator engaged in the execution of the construction industry is not listed in Act LXVIII of 1997. TV. in the list of contractors who carry out construction work in accordance within the case of economic operators not established in HUNGARY, the contractors of the country of establishment are not registered, or they are not licensed, licensed, or have organizational, chamber membership in the country of establishment. In the case of an economic operator not established in HUNGARY, European Parliament 2014/24 / EU shall applyCertification Certificate (Extract) or Other Certificate or Statement according to the Registry Listed in Attachment XI Submit Certificate of Verification: Preliminary Verification with the EEKD -67 (1) - (3) ) and -- 1 (1) to Kr. es Article 2 (5) duly -AK accepts the simple statement of the host (AT, koezoes AT, capacity provider)At the same time, the explicit mention of AK in this document by the Kbt. - 69 (4) para. Based on the EEKD document (s), it must be attached to the offer in the ECR. ) intoand -- 1 (1) to Kr. es Article 2 (5) accordingly, the Time Force (AK) accepts the simple declaration of the economic operator (AT, Koezoes, AT), stating that, in EECD, the requirements of Annex IV are sufficient. resz α is another form of point. Disclosure of these documents is expressly referred to in the Kbt -69.9 (expressly stated in the CC), which coincides with the prior certification.Item 4) Based on. The single European Co-Procurement Document (s) should be attached to the proposal in the EQF. Commitment calls attention to the Kbt. - 35 (2a), 41 / A- (4) es (5), 65 (12), 69 (11a) P.1) A Yes. Section 65 (1) para. a) and Article 19 para. (a) Attaches the caller to the procedure with the currentas much of the account manager as Penzuegyi intezmeni, the present assignment is made in a manner inconsistent with the following co-author and express content, irrespective of when the Submitted when did you start your activity, if this information is available: - enter the traffic number, - have there been more than 15 days of queuing for the call m Under the heading "Serial order", the Bidder validates the term defined in Section 2, point 25 of Act LXV of 2009. P.2) Based on Section 65 (1) (a) and Section 19 (1) (c) of the Civil CodeAttachment Attaches Attachment Attendant to Attachment Provide Date of Notification for the last 3 business days closed prior to the day for the year (s) of purchase of the goods (High Renewal and / or Enhancement for the high-end clothing), respectively. when he started his activityif this information is available. If the AT does not have the business data for the last 3 business days prior to the commencement of the mission assignment, then the net receipts for the commencement of the activity after the commencement of the activity shall comply with the required minimum incurrence. ) bec. The opportunitycertification of assag by Kbt. - 65 (7) - (8), (11), - 67 (3), - 69 (11), - 11a, - 1 (7) of the Cr. . Continuation of item II.2.4) due to character limit here. (X. 30.) on the basis of Article 46 (3) of the Government Decree (X. 30.) on the basis of which the product, origin, references to things, procedures, activities, persons, patents or trademarks are to be interpreted purely for the purpose of specifying the subject matter, and the term "or equivalent" is to be used under the title. AK draws attention to the fact that in order to use the ECR and thus to prepare and submit a proposal, registration from individual person [EKR r. Section 6 (1) subsection]. 2. K complies with the Kbt. Regarding the personal representation rights and the representation rights of the co-sponsored tenderers who submit their statements electronically in the EKR. 41 / A.- (4) - (5) bek, Kbt. 35- (2a) bek, Kbt. - 65 (12) para. 3. K Requests Qualified Requirements for Qualified ATk Notesgorubban. 4. The ECR Art. Pursuant to Article 11 (1), the form provided in the ECT must be accompanied by a suitable statement of the form. The offer must include a statement from AT in accordance with -66.6 (2) Kbt. AT must enclose the statement under -66.6 (6) Kbt, including the negative statement. AT must submit a statement to Kbt on its proposal.65 (7), a negative statement. The AT and, where applicable, the GSZ, who certifies the suitability, shall attach to the offer the Alairas Cimpeldany entitled to declare, or the alairas-minitta in accordance with - 9 (1) of the V.5 of the year 2006. in the case of unauthorized trustee (s) from the person entitled to the notary szarmazo, the full power of attorney contained in the private deed of proof of the offer. Commercial secrets are described in -4 (1) - (4) 10 of the Kbt. The winner AT must have at least 384 mo HUF / year and 192mo HUF / arm contractor's liability insurance from the date the contractor is able to complete it. In the event of a successful test, win the contract testand the insurance company or any other document provided by the insurer shall be submitted by AK to the contract agent at the time of the contract. - 131 (4) para. based on what today isIn the case of a Koezoes AT offer, it is sufficient that one of the Koezoes ATs has the liability insurance described above. All co-operative communication between AK and ATs can be done exclusively in the EKR using the "Communication" function set up for this purpose.in connection with these documents (eg: hianypotlasi call), the EKR will only call the registered body into contact (s). T's professional suggestion is to prove that you have to attach the unpowered koel assistant (s) in full format (pdf format as well as editable xls (excel) format) 13. K is a non-consultative on-site patronageart dated 04.11.2019. (Mon) 2:00 p.m. Contact person: Laszlo Szolnoki, 36705227841 14. The ineffectual reason in -75 (2) (e) of the Kbt. K is a readable and non-editable format, which is a format to be used for cross-referencing offers across the ECF .pdf; zip; .rar and excel format. 15. Present procedure conditional koezb. The method. Kbt. Section 53 (5) - (6) and the Civil Code. 6: 116th - (1) Read in detail: as stated in the author's plan 16. See further in VI.4.3) Internet address (URL): http://www.nfsi.hu
The bid deadline for Contract notice: Construction work was 20 Nov 2019. Bidding is closed.
This tender has been issued by NFSI NEMZETI FEJLESZTÉSI ÉS STRATÉGIAI INTÉZET NONPROFIT KFT. in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45300000 - Building installation work, 45320000 - Insulation work, 45321000 - Thermal insulation work, 45331000 - Heating, ventilation and air-conditioning installation work, 45350000 - Mechanical installations, 45443000 - Facade work, 45453100 - Refurbishment work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 37328509. The purchaser document reference is 495616-2019.