Contract notice: Construction work Tender in Romania - 36951924
Tender notice from Romania, published on 09 Oct 2019.
Executive Summary
The INSPECTORATUL DE POLI?IE AL JUDE?ULUI NEAM? has issued a Tender notice for the procurement of a Contract notice: Construction work in the Romania. This Tender notice was published on 09 Oct 2019 and is scheduled to close on 08 Nov 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 36951924, while the tender notice number is 470438-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 71220000, 71315400, 71321000, 71321200, 45000000, 71220000, 71315400, 71321000, 71321200 CPV Description: Construction work. Architectural design services. Building-inspection services. Engineering design services for mechanical and electrical facilities for buildings. Heating-system design services. in order to increase the energy efficiency and more details on www.e-auction.ro Reference Number: 2613478_2018_PAAPD1042273 The purpose of the investment is the design and implementation of works to improve the energy performance of buildings (heat insulation and rehabilitation, modernization of heating / cooling, ventilation / air conditioning, hot water consumption and lighting) aims to reduce energy consumption, modernizeelectrical installations, installation of energy management systems, as well as the design and installation of fire extinguishing and extinguishing systems and signaling, alarming and alert systems in case of fire and burglary, interior design and restoration of fences and frames. Main Site : The beneficiaries' headquarters Piatra Neamț, Str. Heroes no. 16, Neamț County. Othe purpose of the contract: - stage I services regarding the design of the works: —— elaboration of the necessary documentation for obtaining / prolonging the opinions, agreements, authorizations, studies and obtaining the necessary approvals; —— elaboration of the project PAC / DTAC, POE, PT and D.E., a doccomplaint regarding the follow-up of the construction and maintenance behavior of the installations, SSI and other documentation, —— presentation and support of all technical documentation in front of the project verifiers certified by M.D.R.A.P, —— P.Th approval by the aut. cotr., —— elaboration of the general motto according to GD 907/2016, —— plan with the route of the utilities inside the building, - stage II assistancetechnical from the designer until the final reception is admitted, - stage III execution of works: —— execution of all construction and installation works, testing, completion of works, reception, remediation of inconsistencies and defects, —— execution of connection and connection works at utilities supplying and mounting / commissioning of machinery and equipment, —— pregtraining of the beneficiary's personnel for the use of the equipment - stage IV stage of finalization of the investment objective and its related receipts: —— ISCIR authorizations, commissioning, calibrations, metrological checks of the machines etc., —— obtaining the energy performance certificates, —— presentation of the as-built documentation, according to HG no. 273/1994, —— particlesit seemed obligatory for the designer and the performer at the reception at the completion of the works. - stage V The guarantee stage of the works will include: —— if the situation requires, the designer will present solutions / points of view, and the executor will remedy any damaged works in the warranty period, —— final reception of the works, —— obligatory participation of the designer andof the performer at the final reception. I. The bidder / third party supporter / subcontractor must not be found in the situations provided in art. 164, art. 165 and art. 167 of Law no. 98 / 2016. The DUAE will be completed by the economic operators participating in the award procedure with the information related to their situation. The supporting documents proving the fulfillment of those assumed by the complthe DUAE country, will be presented at the request of the contracting authority, only by the bidder ranked on the first place, in the intermediate ranking drawn up at the end of the evaluation of the bids. . 193 para. (1) lit. a) of Law no. 98/2016; 2) regarding the subcontractors declared, according toart. 193 para. (3) of Law no. 98/2016, with the information provided by art. 193 para. (1) lit. a) of Law no. 98/2016, including those specified by art. 150 paragraph (2) of H.G. no. 395/2016: the name and contact details of the subcontractors, the part (s) in the contract to be fulfilled by them, the value to which the respective party (s) rises; 3) regarding third partiesatori, according to art. 193 para. (2) of Law no. 98/2016, with the information provided by art. 193 para. (1) lit. a) of Law no. 98 / 2016. At the same time, the tenderer presents: (a) DUAE completed by subcontractors [art. 170 paragraph (1) of Law no. 98/2016], (b) the agreement of the subcontractors regarding the information mentioned in point 2 [art. 150 paragraph (2) of H.G. no. 395/2016], (c) DUAE completed by tsupporting areas [art. 183 para. (1) of Law no. 98/2016]. (D) the commitments of the third supporters (the dedicated form from the "Forms" section), accompanied by documents transmitted by them, from which the effective way in which their support will materialize (art. 182 paragraph (3)) ) and (4) of Law 98/2016]. For the association-bidder, the association leader presents: (i) in his own DUAE: informedthe subcontractors declared and / or the third party supporters of the association, as the case may be, as specified in points 2 and 3 above, (ii) DUAE completed by each of the associated members, with the information provided by art. 193 para. (1) lit. a) of Law no. 98/2016, regarding the own situation of each associate, (iii) the association agreement and the documents specified in letters a-d ofabove The non-submission by the tenderer, together with the offer, of the DUAE (including for each associate / subcontractor / third party supporter, as the case may be), entails its rejection as unacceptable. The non-submission by the tenderer, together with the DUAE, as the case may be, the association agreement / the subcontracting agreement / the firm commitment of the third party supporter, is the basis for requesting clarifications bothto the bidder / candidate as well as to the subcontractor / third party supporter The supporting documents proving the fulfillment of those assumed by completing the DUAE are: 1) certificates regarding the lack, at the moment of presentation, of the debts to the general consolidated budget (state budget, local budget / local budgets ), regarding the payment of taxes, taxes or contributions; 2) the criminal recordof the economic operator and of the members of the administrative, management or supervisory body of the respective economic operator or of those who have power of representation, decision or control within it, as it results from the certifying certificate issued by the ONRC / the constitutive document which appear on the form as authorized natural and / or legal persons; 3)where applicable, documents proving that the economic operator can benefit from the exceptions / derogations provided in art. 166 para. (1) and (2), art. 165 para. (3), art. 166 para. (2), art. 167 para. (2) and art. 171 of Law no. 98/2016; 4) other edifying documents, as the case may be. The supporting documents proving the fulfillment of those assumed by completing the DUAE, will be presented onlyof bidder [...] details on www.e-licitatie.ro Annual general turnover. The average of the global turnover for the last 3 years (2016, 2017, 2018) shall be at least equal to RON 25 000 000 excluding VAT [art. 175 paragraph (2) lit. a) of Law 98/2016]. The bidder will elaborate the offer in accordance with the provisions of the award documentation and will indicate in its contents which information from the proposalThe technical and / or financial proposal is confidential, classified or protected by an intellectual property right. The bidder may visit the real estate during the preparation of the offer, to evaluate, on his own responsibility, expense and risk, the data necessary for the preparation and Offer elaboration Visiting the site to obtain the information necessary to elaborate the offeri, can be made following a written request sent to the contracting authority at least 3 days before the visit and will be recorded in a report. The visit will be based on an address, sent to fax no. 40 233207201, with prior appointment, between 9:00 and 15:00. Access on the premises will be based on the identity document and a delegation issued by the bidder, ifOriginally stamped and stamped The evaluation commission has the obligation to establish the winning bid, among the admissible offers, on the basis of applying the criterion for awarding the public procurement contract. Before awarding the public procurement contract, the contracting authority requests the bidder ranked first, after applying the award criterion, to submit without delayrelease updated supporting documents to demonstrate the fulfillment of all the qualification criteria, according to the information contained in the DUAE. In the DUAE, information regarding the person empowered to represent the economic operator will be completed in order to participate in this public procurement procedure. Bidders will complete directly in SEAP, in the dedicated section ofthe procedure of interest, the DUAE already configured by the contracting authority. Establishing the winning bid will be made only by comparing the scores of the admissible offers, without quantifying other technical elements or other advantages that result from the way the contract is performed by the operators. economic participants in the award procedure. Following the award of a pointof each offer, the ranking will be established in descending order of scores. The final score of each offer will be determined by calculating the sum of the scores related to each evaluation factor, calculated according to the presented calculation algorithm. The offer with the highest final score will be considered the winning bid. In case after applying the award criterionre and establishing the final ranking, the evaluation commission finds that there are two or more offers with the same score, the division will be done taking into account the score obtained on the evaluation factor "the price of the offer". In the event that equality is maintained, the contracting authority will requested through SEAP that the respective economic operators electronically upload documents containing themn new prices, and the winning bid will be designated the one with the lowest price The quantification of the quality risk of the project is the responsibility of the bidder, according to art. 154 and art. 156 of L.98 / 2016 and art. 20 of H.G. 395 / 2016. Any communication, request, information, notification and the like will be uploaded to SEAP and will be signed with the extended electronic signature, based on a certificatequalified, issued by a certification service provider accredited in accordance with the law Internet address (URL): https://nt.politiaromana.ro
The bid deadline for Contract notice: Construction work was 08 Nov 2019. Bidding is closed.
This tender has been issued by INSPECTORATUL DE POLI?IE AL JUDE?ULUI NEAM? in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 71220000 - Architectural design services, 71315400 - Building-inspection services, 71321000 - Engineering design services for mechanical and electrical installations for buildings, 71321200 - Heating-system design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 36951924. The purchaser document reference is 470438-2019.