Contract notice: Construction work Tender in Romania - 35574865
Tender notice from Romania, published on 17 Aug 2019.
Executive Summary
The S.C. RAJA S.A. CONSTAN?A has issued a Tender notice for the procurement of a Contract notice: Construction work in the Romania. This Tender notice was published on 17 Aug 2019 and is scheduled to close on 22 Oct 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35574865, while the tender notice number is 389199-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45000000 CPV Description: Construction work. Water and sewerage networks Darza and the Monastery. Samurcași and Cocani water networks Reference Number: 1890420/2018/37 / CL 29 POIM Execution activities for the works contract "Water and sewerage networks Darza and the Monastery. Samurcasi and Cocani water networks "are: Main Site: Dambovita Execution activities SECTOR 1: Darza water and sewerage networks Ob. 1.1. New distribution networkwater in place Darza • New distribution network of drinking water with cond from: PEID, PE100, RC, SDR 26, PN6, 110 mm with a length L = 10, 861 m; PEID, PE100, RC, SDR 26, PN6, 160 mm long L = 3.968m; Ob. 1.2. New sewerage network instead of Darza • New sewerage network for household wastewater from PVC, SN8, Dn250mm, Ltot = 13, 719 m; Ob. 1.3. St pumping and wastewater disposal site instead of Darza • Waste water pumping station SPAU: 4 pcs; Fireplace: 4 pcs; SPAU discharge conduit, from PEID, PE 100, RC, SDR17 PN 10 for sewerage, with De90mm and De160mm diam and total length Ltot = 2, 274m; SECTOR 2: Water and sewerage networks Monastery Ob. 2.1. Extension of the water distribution network instead The monastery with conduit from PEID, PE100, RC, SDR 26, PN6, 110 mm with a length L = 2. 980m Ob. 2.2. Extreturn home sewerage network in place Monastery, PVC network, SN8, Dn250mm, Ltot = 3, 560 Ob. 2.3. St pumping station and waste water disposal site instead of the monastery • Household pumping station SPAU: 2 pcs; SPAU discharge conduit, from PEID, PE100, RC, SDR17 PN10, with De90mm diameter and total length Ltot = 801m; SECTOR 3: Samurcasi water network Ob. 3.1. New remote networkthe water rib took place Samurcasi on the adm territory of the city Buftea with pipelines from PEID, PE100, RC, SDR 26, PN6, 160 mm with a length L = 583m, on DJ 602A street (str. Independentei); Ob. 3.2. New Samurcsi water distribution network with conduit from PEID, PE100 RC, SDR 26, PN6, 110 mm long L = 6, 024m; PEID, PE100, RC, SDR 26, PN6, 125 mm long L = 874m; PEID, PE100, RC, SDR 26, PN6, 160 mm longa long L = L = 536m Ob. 3.3. St. pumping water for Samurcasi place SECTOR 4: New network of water distribution in place Cocani Ob. 4.1. Cond from PEID, PE100, RC, SDR 26, PN6, 110 mm with a length L = 6, 236m Ob. 4.2. Drinking water pumping station Requirement no. 1. The bidders, associations, third-party supporters and subcontractors must not find themselves in the situations provided in art.177, art.178 andart.180 of Law 99/2016 on sectoral procurement. The way in which the requirements can be demonstrated: The DUAE will be completed by all the operators participating in the procedure (Bidders, associations, third parties and subcontractors), with the information related to their situation. The supporting documents proving the fulfillment of those assumed by completing the DUAE follow abe presented, at the request of the contracting entity, only by the tenderer ranked first. The information in the aforementioned certificates must be real / valid at the time of their presentation.they have power of representation, decision or control within it, as it results from the certifying certificate issued by the ONRC / the constitutive document; moment of presentation. O If necessary, documents proving that opthe economic error may benefit from the derogations provided in art. 179 para. (2), art.180 para. (2), art. 184 of Law 99/2016 on sectoral acquisitions; O Other edifying documents, as the case may be. Non-resident economic operators (foreigners) have the right to present any edifying documents to prove that they have fulfilled their obligations to pay taxes, taxes and contribto the general consolidated budget, in accordance with the requirements of the country of origin or the country in which the bidder / candidate is established, issued by the competent authorities of the country of origin (such as certificates, tax filings or other equivalent documents). The documents will be presented with their authorized translation into Romanian. Note 1: Any economic operatorc found in any of the situations provided in art. 177, 178 and 180 of Law 99/2016, which attract exclusion from the award procedure, can provide evidence to show that the measures taken by it are sufficient to demonstrate its credibility in relation to the reasons for exclusion in accordance with the provisions of art. 184 of Law 99/2016. Note 2: Forms and / or documentsrequested above, will be presented by the bidder ranked first, by each member of the association (in the case of an association), and, if applicable, by the subcontractor and by the supporting third party. Requirement no. 2- Avoidance of conflict of interest The bidders, associations, third parties and subcontractors must not find themselves in the situations provided in art. 72 and 73 of Law no.99/2016 regarding the updated sectoral acquisitions. The way in which the requirement can be demonstrated: The DUAE will be presented, completed by the bidder / candidate, third party supporter and subcontractor, as the case may be, with relevant information, according to art. 202-204 of Law no. 99/2016 updated. The persons with decision functions within the contracting entity regarding the organization, deruthe delivery and completion of the award procedure are presented in the statement of the manager of the contracting entity, part of the public procurement file and are the following: 1. Felix Stroe General Manager; 2. Aurel Presura - Deputy General Manager; 3. Tereza Baranescu - Economic Director; 4. Elena Sfrija - Legal Director; 5. Ion Preda - Director of External Development and Finance; 6. Stelian Budes - Deputy Director of External Development and Finance; 7. Rodica Mihai - Adj. Director of External Development and Finance; 8. Adriana Lascu - Adj. Director of External Development and Finance; 9. Cristian Ionut D ... details on www.e-licitatie.ro General annual turnover Turnover The minimum annual turnover, achieved in each of the last three years (2016, 2017, 2018) must be moregreater than or equal to 35, 000, 000 RON. If several economic operators jointly participate in the award procedure, the fulfillment of the criteria regarding the economic and financial situation is demonstrated by taking into account the resources of all the members of the group. Each economic operator (single bidder / associated bidder) will complete the corresponding fields in the DUAE regardingeconomic and financial capacity. Third Party Supporter If the tenderer demonstrates its economic and financial situation and also invokes the support provided by one or more third parties, then the tenderer has the obligation to prove to the contracting entity that he has taken all necessary measures to have access at any time to the necessary resources., presenting a commitment in this regard fromthe third party / third parties. According to art. 198 of Law no. 99/2016 the third party economic operator / third party supporters / supporters will be jointly and severally liable for the execution of the sectoral contract. By the firm commitment, the third party / third party will / will confirm that they will support the tenderer in order to fulfill the contractual obligations, either by specifying the way in which they will / will intervene.ni concrete in order to fulfill the respective obligations for which he has granted the support, either by indicating the financial resources that he will make available to the tenderer (describing the concrete way in which he will do this). With the support commitment, the bidder has the obligation to present documents transmitted to it by the third party / third party supporters, from which the result will befulfillment document by which the third party (s) the sponsor (s) will / will ensure the fulfillment of their support commitment, documents that will be annexed to the respective commitment. The supporting third party will respond in solidarity with the bidder, unconditionally, to the contracting entity for not fulfilling any obligation assumed by the bidder, based on the sectoral contract, and forthat the latter received the economic and financial support according to this commitment, renouncing in this sense, definitively and irrevocably, to invoke the benefit of division and discussion. Each third party supporter will complete the appropriate DUAE fields regarding economic and financial capacity. The supporting third party must not be in the situation provided by art. 177, 178 and 180 of Law 99/2016, subject to the sanction of exclusion from the award procedure. The Attribution Documentation and prepare the offer according to all the instructions, forms, contractual provisions and technical specifications contained in this Documentation, - It is recommended to the bidders to inspect the location of the project and the surroundings to evaluate, on their own responsibility, the expense and the risk, the data necessary to prepare the offer, - We mention that for the visualization of the documentation of award uploaded in SICAP, the economic operators, must have a program needed to view the electronically signed files, this program being availablefree ride on the websites of electronic signature providers, - An economic operator can participate in the procedure only if it is registered in SICAP, - The correspondence and all documents submitted by the economic operators will be in Romanian, or accompanied by an authorized translation into the language, - The award documentation is posted in full within the participation announcement published on andte www.e-licitatie.ro, - Requests for clarifications of potential bidders will be addressed exclusively in SICAP to the "Questions" section of the award procedure carried out by electronic means, - The answers to the requests for clarifications are they will post in legal term in the "Documentations, clarifications and decisions" section of the participation announcement published on the website www.e-licitatie.ro, - The evaluation commission will send the requests for clarification regarding the submitted offers, in the SICAP section "Questions". The economic operators will send the answers to the clarifications and the eventual documents requested during the evaluation of the offers through the SICAP ("Questions" section), in full in the section corresponding to the respective request, in the form of one orof several distinct documents / files signed with the valid extended electronic signature, based on a qualified certificate not suspended or not revoked at the time of the offer signing, in accordance with the legal provisions regarding the electronic signature, - In the case of the bidders (natural or legal persons) of another nationality than the Romanian one, the documents will be transmitted in the language in which they havewere issued, accompanied by their authorized translation into Romanian, - In the case where two or more offers ranked first have equal scores, the bidders will be asked for a new financial proposal, in which case the contract will be awarded to the tenderer. whose new financial proposal has the lowest price and obtains the highest total score, - Duration of the execution contracte is 365 days (from the date the work order was issued), - duration of execution of sector 1 365 days - duration of execution of sector 2 275 days - duration of execution of sector 3 365 days - duration of execution of sector 4 275 days The duration of the guarantee period is 1095 days. NOTE Given the fact that starting with 08.04.2019, the Single Purchase Document has been integrated into the SICAPEuropean States (DUAE), bidders, associations, third party supporters and subcontractors will individually complete DUAE in SICAP, according to the instructions given by ANAP and the User's Guide. Internet address (URL): http://www.rajac.ro/
The bid deadline for Contract notice: Construction work was 22 Oct 2019. Bidding is closed.
This tender has been issued by S.C. RAJA S.A. CONSTAN?A in Romania.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 35574865. The purchaser document reference is 389199-2019.