Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Regional or local Agency/Office
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45212000, 45300000, 45310000, 45350000, 45000000, 45212000, 45300000, 45310000, 45350000
CPV Description: Construction work.
Construction work for buildings relating to leisure, sports, culture, lodging and restaurants.
Building installation work.
Electrical installation work.
Mechanical installations.
Mako Varosi Termal- es Gyogyfuerdő fejlesztese epit
Reference Number : EKR001001482019
Mako Varosi Termal- es Gyogyfuerdő fejlesztese epitesi beruhazas
Main Site : Mako, Makovecz ter 6. HRSZ 17.
Jelen epitesi clothing is the implementation of the Beruhazas I., the main elements of which are:
II. Construction of the Family and Immersion Basis according to Imre Makovecz's plans
- Trapezoidal and Elemental Pool (neck, waist, buttocks massage)
- 2 soldier pools
- Interactive game gallery: Adventure of Atlantis (1831.99 m)
installation of 8 statues eskoezpark for the group of oesses statues, full visual technology espoork with minimum 5000-6000ANSI lumens with full HD projectors
Audio system, integrated audio-visual control system that controls total luminosity, audio control, with centrally programmable unit and volume control with single-interface system, interface - Trap Tower: Indication of 3 traps, 12 m high (105.34 cm)m)
With unobstructed access, weak ash works for installation elements
- Summer shelters (340 people) with covered atjar to sliding tower
- Roof with sunbathing terrace (1011.64 m)
- Motor sun shades in the sun terrace
- Wireless rain shelters
Summer rooftops with covered, heated atjar to the slide tower
- Roofing tower with summer entrance: lift to the future Teleki street lodging
Summer access and sliding tower
- Attachment system
- Retaining tower with summer access: lift to future Teleki street lodges
- drinking access with summer access
Typical quantities:
Refinishing: 426 m
On-site concrete and reinforced concrete work
- 1.6m halo
- 268 m concrete
Masonry: 733 m
Plaster: 2846 m
Roofing: 1040 m plywood, 1184 m slate roofing
Badogozas: always 233 m
arrow corners: 196 pieces
544 m
dry flooring
1514 m
pillar cover: 809.8 m
interior painting: 4111 m with dispersion paint
insulating: 25 843 m permanently applied layers
IV . Indoor thermal pool
- Indoor thermal pool 220 m
- Pool bar with kitchen technology
Typical quantities:
Formwork: 227 m
On-site concrete and reinforced concrete work
- 16.84 tons of concretesteel halo
- 148 m concrete
Well work: 364.4 m decking, with bituminous boards
Flooring: 364.6 m
Badogoz: 634.6 m
Lazuroz: 76.6 m
Covering: 578 m
Insulation: 11 563 m permanently applied laths
V: Gardening, Cauldron and Coatings
- Centrifugal Chemical Dispensing System
- Transformer Attachment for 40m
Internal Power Lines 100mm
- Invitation Weaker Aspects, 4105mm cable
- automatic venting system
- setany and coverings from summer access to new thermal pool 1053m2
- erosional hill gardens (On the forest side and on the summer vegetation.)
- 68 roundparts
- 15 waste collectors
-
- lawn mats 156 m
Planting of deciduous trees with 1 m3 replanting goose, 100% soil change, three-sided lance, Size: 2xi, 18/20, noevAccording to notes, planting of 20 pieces
Shrubs to 40 cm x 40 cm x 40 cm sprouting planter, with 100% soil exchange, different size according to the Noevenil list 3072 pcs
Planting the seedlings20 cm with soil exchanged to the brain, 1460 pcs
, 371 m upstream, 14 manhole colonies
- sewage excitement with 54mm tramline
- thermal piping epites 678.6 fm with track fitting
- water supply 292.8 fm track fitting
- laying 72 m terrain in connection with the co-operator
V. Waterbase Expansion
- Cold Water Well
- Hot Water Well
Total Base Area: 3248.97 m
Of which: 2532.78 m
Kuelter: 719.9 m
Pools' Water Requirements: 515.21 m
The detailed task description is given in the Co-Procurement Documents 5.
There is no lip in the procedureis not an economic operator subject to the Kbt. Any of the grounds for exclusion listed in - 62 (1) - (2) are present or have occurred during the course of the procedure. According to - 64.
Preliminary certification:
Proponent of the order 321/2015. (X. 30.) of the Government of the Republic of Hungary (hereinafter referred to as "the Cr.")l prove in advance that you do not belong to Kbt. - 62 (1) - (2).
The bidder / koezoe bidder or the economic operator accepting the suit by the bidder submitting the bid, using the form submitted in the bid, dated Kr. (1) of the Kbt. 41 / A. -(5) and Article 3 of the CC, the declarations (such as the EQF forms) are made by the economic operators submitting the proposal in the representative offices of the co-ops and other organizations that certify their suitability. - 69 (4) to (7): with the exception of the reasons for exclusion, t shall be justified on the basis of -- 8 and 10 of the Cr.
Based on Article 15 (1) of the Criminal Code, the sub-contractor or other entity that is responsible for certifying the suitability is only able to submit the EEKD to prove the defect of the excluded causes. (2) of the Act, in respect of sub-contracting entities that do not take overst the certificate of aptitude, the bidder, the koezoe bidder the Kbt. A declaration pursuant to - 67 (4) shall be submitted. The statement must be submitted by the bidder (in the case of a koezoes bidder who has submitted the bid) with the form provided by the Bidder.Certificates issued prior to the commencement of the co-procurement may be retrieved (used) as long as the contents of the certificates and data contained therein are correct. To the contrary, the validity of the data shall be claimed by the tenderer in his statement of kueloen to this effect.In the case of a variation registration procedure, the offer shall be accompanied by the variation registration application submitted to the company and a proof of its authenticity (in writing). If no listing procedure is in progress, a statement to that effect with a negative content shall be attached to the offer. In the EQF, the Benchmark is the coexistence of co-procurement documentsIn the form of an electronic form, the tenderer has drawn up a sample form for the Notification List, which the tenderer has to use in the form of an electronic form and submit it in the quotation. 69. - (11a), para. prevail.
W / 1st An economic operator carrying out construction work is not suitable unless it is listed in the Etv. is the name of a construction finishing companyeconomic entities established in the United States of America, or in the case of economic operators not established in HUNGARY, if the performance of the contract is subject to registration in the country of establishment, koezoes reviewers koezuel eleg if a megfelel. The capacity of an organization to qualify for a condition is assured if that organization implements the task for which it has registered, organizational tags, or licensed certification. III.1.2)
In the offer of the Offeror, Article 1 (1) and II. Chapter 5 (Section 5)according to the prior approval of the economic operators, that is to say, in the context of the ex-ante certification of the eligible auditors, Special "alpha" section (general indicator of the selection criteria)searching for relevant documents on the basis of the call of time pursuant to Section 1 (2) and Section 19 of the Government Decree. According to Section 69 para. Databases that do not mention suitability in this chapter and economic operators have indicated their availability in EEKD.
P / 1. offerworker attaches to the 321/2015. (X. 30.) Government Decree based on Article 19 (1) (a) of the Government Decree from all of the leading penzuegyes of the account, recalculated from the tender caller, for the following two years, with the following content:
- miota manages the payroll invoice (s)
- payroll invoice (s)ain there was a queue for more than 30 days in the two years (24 months) counted from the bidding task (depending on when the bidder arrived and when the test started, if this data is available). does not examine the pension account that was terminated during the period.t. Section 65 (6) - (7), (8) of the Kbt. Pursuant to Article 67 (3), the organization providing its capacities shall be able to demonstrate compliance with the relevant eligibility criteria in the same way as the required certification modalities, but the certificates shall be submitted by the proposer in a cross-reference to the ECR. EECD must be pushed forwardto justify the condition (Article 1 (1) Cr.). Bidding authority for pre-certification modality accepts the simple declaration of economic operators in the EEKD, with regard to the ex-ante certification of eligible auditors, ie. The score "alpha" (the general indicator of the selection criteria) is a fallback.
The bidding power according to Article 26 (2) of the Cr. Is jar el.
1.however, all communications are performed exclusively in the EKR system, however the Kbt. 41 / C. In the cases referred to in - 4 (4), if communication in the ECF is not possible, the following contacts may also be used: fax: 36 17896943, e-mail:
[email protected]. Co-operatives against documents transmitted in the ECT, declarations made electronically in the ECTas well as the representation requirements regarding electronic statements made by Kbt. -40-41 / C of az iranyado.
3. The AK Business Organization excludes the fundamental of both the AT and COE. In case of Koezoes suggest the Kbt. - 35 and the Kbt. 41 / A. (5) shall be dealt with and the time shall passmust be accompanied by the relevant agreement of the koezoes' advisers. Additional information about Kbt. - 56 as per the details of the KD.
6. K is not consulting. K on-site patrol will be held on August 21, 2019 at the performance venue 10:00 oratol
7. The quotation must include the Kbt in the forms provided in the ECR. Section 66 (2) para. further to Kbt. Section 66 (5) para. as described in the appropriate cells, which must contain Kbt. 68 (4).
8. In this procedure, K prescribes the Kbt. Section 66 (6) para. information on the sub-entities of the Bank and the Kbt. Section 65 (7) para. Declaration in accordance with the terms of reference (including a negative statement). Hianypotlas a Kbt. Section 71. AK will not order a new hairpot if the AT involves a non-listed economic entity in the procedure and selects the hairpot for that player. FAX: Bartalis Iren (no. 00778)
11. AK does not apply Kb. Article 75, paragraph 2, subdivision (e). Ks qualify for ATs eligibility criteriaThis reviewer has laid down stricter rules for notes. For non-regulated inquiries in this tender notice, CXLIII of 2015 on Co-Procurement. shall be dealt with in accordance with its regulations on raw material and its implementation. The contract test condition is that the overnight M / 2. of the Merger Register, must have the authority specified in paragraph 1 of this sectionwho is a Chamber (www.mmk.hu) and the Hungarian Epites Chamber (www.mek.hu), as defined in other legal regulations, which must be provided for the entire duration of the contract. Failure to enroll will result in failure to comply with the terms of your contract exams. Section 131 para.was ranked in the top of the list
15. The Offeror shall have at least 300, 000, 000 HUF / year and 30, 000, 000 HUF / karesemeny liability insurance contract for the contract test date, or extend his existing liability insurance to this contract, and he / she shall disclose in writing at any time.6. Responsibility is not assured, given that the tasks of the execution work to be performed are professionally concurrent with each other, and the nature of the tasks to be performed does not allow the simultaneous work of another person to perform the task. A piece of co-purchasing is inconsistent with economic essence, the tasks to be performed are aThey are organically connected to the other, and broken down into the pieces of clothing they want to accomplish, it would expose them to the appropriate level of work. The bidder must provide a copy of the offer in a pre-formatted form, as well as submit the customized coinage in editable .xls format. In point IV.2.6), Ajanlatke over a period of 2 monthsis about 60 calendar days.
Internet address (URL): http://www.mako.hu