Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45262500, 45111200, 45223820, 45231000, 45231300, 45232100, 45232130, 45232410, 45232423, 45232440, 45261000, 45262300, 45262310, 45300000, 45310000, 45311100, 45311200, 45312100, 45312200, 45312310, 45314000, 45314320, 45315300, 45320000, 45330000, 45331000, 45331100, 45331110, 45331200, 45331210, 45331220, 45331221, 45331230, 45332200, 45332300, 45332400, 45333000, 45333100, 45333200, 45343000, 45400000, 45410000, 45421000, 45431000, 45432100, 45443000, 45000000, 45262500, 45111200, 45223820, 45231000, 45231300, 45232100, 45232130, 45232410, 45232423, 45232440, 45261000, 45262300, 45262310, 45300000, 45310000, 45311100, 45311200, 45312100, 45312200, 45312310, 45314000, 45314320, 45315300, 45320000, 45330000, 45331000, 45331100, 45331110, 45331200, 45331210, 45331220, 45331221, 45331230, 45332200, 45332300, 45332400, 45333000, 45333100, 45333200, 45343000, 45400000, 45410000, 45421000, 45431000, 45432100, 45443000
CPV Description: Construction work.
Masonry and bricklaying work.
Site preparation and clearance work.
Prefabricated units and components.
Construction work for pipelines, communication and power lines.
Construction work for water and sewage pipelines.
Ancillary works for water pipelines.
Storm-water piping construction work.
Sewerage work.
Sewage pumping stations construction work.
Construction work for sewage pipes.
Erection and related works of roof frames and coverings.
Concrete work.
Reinforced-concrete work.
Building installation work.
Electrical installation work.
Electrical wiring work.
Electrical fitting work.
Fire-alarm system installation work.
Burglar-alarm system installation work.
Lightning-protection works.
Installation of telecommunications equipment.
Installation of computer cabling.
Electricity supply installations.
Insulation work.
Plumbing and sanitary works.
Heating, ventilation and air-conditioning installation work.
Central-heating installation work.
Boiler installation work.
Ventilation and air-conditioning installation work.
Ventilation installation work.
Air-conditioning installation work.
Partial air-conditioning installation work.
Installation work of cooling equipment.
Water plumbing work.
Drain-laying work.
Sanitary fixture installation work.
Gas-fitting installation work.
Gas regulation equipment installation work.
Gas meter installation work.
Fire-prevention installation works.
Building completion work.
Plastering work.
Joinery work.
Tiling work.
Floor laying and covering work.
Facade work.
Budowa Multidyscyplinarnego Centrum Badawczego UKSW wraz z instalacjąand a gas boiler room and the execution of connection design documents provided for by reference documents
Reference Number: CNT-371-03 / 2019
Construction of the Multidisciplinary Research Center of the Cardinal Stefan Wyszyński University in Warsaw at ul. Maria Konopnicka in Dziekan-w Leśny together with the gas installation and boiler room, as well as the construction of connection plans provided for by the project documentation.
Main Site: ul. Maria Konopnickiej 1 in Dziekan-w Leśny, POLAND
The subject of the order is:
Construction of the Multidisciplinary Research Center of the Cardinal Stefan Wyszyński University in Warsaw at ul. Maria Konopnicka in Dziekan-w Leśny together with the gas installation and boiler room, as well as the design of the media connections provided for in the project documentation. The subject of the order includes the execution of construction works and installationand purchase and delivery of all necessary materials and equipment within the scope specified in the Description of the subject of the order constituting Chapter IV of the ToR, design documentation as defined in Chapter IV of the ToR and template contract constituting Chapter III of the ToR, including modifications, exclusions and additions made during the proceedings. The works include, in particular, the construction industry, sanitboth electric and electric. A detailed description of the subject of the order is Chapter IV of the ToR.
The Ordering Party does not set a specific condition in this regard.
In order to confirm compliance with this condition, the Contractor must prove that:
a) he is insured against civil liability in respect of his business related to the subject of the order an amount not less than: PLN 5, 000, 000.00;
b)has funds or creditworthiness within a period not earlier than one month before the deadline for submission of offers and in an amount not less than PLN 10, 000, 000.
All amounts indicated in this ToR are expressed in PLN. Values in currencies other than PLN should be calculated according to the average NBP exchange rate as of the date of initiation of the proceedings. The ordering party designates the following person to kontaktu with Contractors / arrangements regarding local vision:
Piotr Kmieć, e-mail address:
[email protected] and
[email protected]2. The proceedings are conducted using the mini-port https: //miniportal.uzp.gov.pl
3. Contractors who are not subject to exclusion pursuant to art. 24 sec. 1 item 12-23 and para. 5 point 1, 5-8 of the PPL Act.
In order to confirm the lack of grounds incontractor's participation in the proceedings The Contracting Authority requests the following documents:
1) information from the National Criminal Register in the scope specified in art. 24 sec. 1 items 13, 14 and 21 of the PPL Act,
2) to the extent specified in art. 24 sec. 5 point 8 of the Act - certification of the competent head of the tax office or other document specified in the ToR confirming that the contractor is not in arrearstaxation,
3) to the extent specified in art. 24 sec. 5 point 8 of the Act - a certificate issued by the relevant organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with payment of social security or health insurance contributions, - 4) excerpt from the relevant register or from central records and othersformation about economic activity, if separate regulations require an entry in the register or records, in order to demonstrate the absence of grounds for exclusion based on art. 24 sec. 5 point 1 of the PPL Act;
5) the Contractor's declaration to the extent specified in art. 24 sec. 1 point 15 of the PPL Act;
6) the contractor's statement on the lack of a decision against him as a preventive measure for the prohibition to apply for orderspublic, based on art. 24 sec. 1 point 22 of the Public Procurement Law Act,
7) the contractor's statement on the lack of issuing a final conviction of a conviction court for a restriction of liberty or a fine to the extent specified by the awarding entity on the basis of art. 24 sec. 5 points 5 and 6 of the PPL Act;
8) the contractor's statement on the lack of a final administrative decision about the breachin accordance with labor law, environmental protection law or social security regulations to the extent determined by the contracting authority on the basis of art. 24 sec. 5 point 7 of the Pzp Act,
9) the contractor's statement on not paying taxes and local fees, referred to in the Act of 12.1.1991 on taxes and fees (Journal of Laws of 2018, item 1445, 1588, 1669, 1693 and 1722, 2073).
If the contractor has its registered office or place of residence outside the territory of the Republic of Poland (in relation to the requirements above), submit the corresponding documents specified in detail in art. 5 paragraph 4 of the SIWZ.
4. The Contractor to the offer is obliged to attach a statement, valid as of the day of submitting the offers, to the extent indicated by the Employer in the ToR. The declaration consists of formularzu Uniform European Order Document (EAT).
5. In order to confirm the lack of grounds for exclusion from the proceedings for awarding the Contractor's order in the circumstances referred to in art. 24 sec. 1 point 23 of the Public Procurement Law and in accordance with art. 24 sec. 11 of the PZP Act by the Contractor within 3 days from posting on the website information referred to in art. 86 par. 5 acts, transorders the Employer to declare that he or she does not belong to the same capital group as referred to in art. 24 sec. 1 point 23 of the Public Procurement Law. With the submission of a statement, the Contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the procurement procedure. The offer must be accompanied by a document entitling to representji people signing the offer. If the right to represent the person signing the offer does not result from the relevant registration documents, which the Employer from the relevant register will download by himself, the offer should be accompanied by a power of attorney.
Internet address (URL): http://www.dzp.uksw.edu.pl