Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45111300, 45112000, 45231300, 45232410, 44611500, 45111200, 32400000, 44141100, 31311000, 31310000, 45232150, 45110000, 45000000, 45111300, 45112000, 45231300, 45232410, 44611500, 45111200, 32400000, 44141100, 31311000, 31310000, 45232150, 45110000
CPV Description: Construction work.
Dismantling works.
Excavating and earthmoving work.
Construction work for water and sewage pipelines.
Sewerage work.
Water tanks.
Site preparation and clearance work.
Networks.
Electric conduit.
Mains connections.
Mains.
Works related to water-distribution pipelines.
Building demolition and wrecking work and earthmoving work.
Realizacja robot budowlanych I etapu inwestycji CentrMuseum and Education Museum in Karkonosze National Park Sobieszow Palace Stage I / C
Reference Number: KPN / 11/2019
Construction works for the first stage of the investment. Museum and Education Center of the Karkonosze National Park Sobiesz-w Palace Stage I / C
Main Site: Karkonosze National Park Palace Sobiesz-w, Jelenia Gora
- The dismantling and utilization of all underground and ground-based facilities colliding with the new andnfrastruktura, building constructions and small architecture such as, among others: old installations, tanks, fences, etc., - Demolition, to the extent needed to complete the task, and re-recreating the existing internal road surface of the complex: Center for Museum Education Poviat Sobieszow (scope the tasks also include securing, transporting and storing possible itemsof these roads in the Museum Education Center at the Sobiesz-w Palace in the place designated by the Contracting Party),
- Water connection of the entire Museum and Education Center, Sobieszow Palace, to the water supply network of the company Wodnik, located in the basement of the Bursa building (object in the third stage of the investment) by Annex No. 2, points 2.1 and 2.4,
- Execution of the external water supply networkentrance and sewerage, including water and sewage connections of all objects of the Museum and Education Center at Pałac Sobieszow,
- Execution of an external rainwater drainage system with designed separators in the area of the investment: Museum and Education Center of the Karkonoski National Park Sobieszow Palace in the range shown in Figure 3,
- Execution of excavation for underground tank przeciwpożarowy together with the export and utilization of the material selected from the excavation as well as delivery and assembly of the underground fire-fighting tank in accordance with the draft constituting Annex 2 point 2.3. with connection to water supply and rainwater drainage,
- Cleaning, renovation and connection to the rainwater drainage system of the existing underground retention water reservoir,
- Execution outsideelectrical infrastructure, low-current and telecommunications, including sewage system and power network and connection of the Centrum Sobieszow Palace complex facilities in the scope shown in Fig. 2 (the scope of works does not include the execution of posts and lamps for external lighting),
- Making the so-called gas connection to the building. "Wielka Stajnia" from the existing gas network along with liquidationfurther unused part of the gas network in agreement with the appropriate gas plant according to drawing no. 5,
- Execution of culverts for the designed installations connecting johns with heat pumps supplying facilities from the second and third stage of the investment: Museum and Education Center of the Karkonosze National Park Sobiesz-w Palace according to sketch No. 4.
The Contractor will meet the condition of participation inproceedings regarding the economic or financial situation, if it shows that:
a) it has financial resources or creditworthiness in the amount of min. 100, 000.00 PLN,
b) is insured against civil liability in the scope of conducted activities related to the subject of the order for a guarantee sum of min. 300, 000.00 PLN.
In order to confirm the fulfillment of the condition regarding the economic situationThe contracting authority requests from the contractor documents:
a) information from the bank or cooperative savings and credit union confirming the amount of financial resources held or the creditworthiness of the contractor, in a period not earlier than one month before the deadline for submission of tenders;
b) confirming that the contractor he is insured against civil liability in the scope of prowaactivity related to the subject of the order for a guarantee sum determined by the Ordering Party.
1. The Contractor is subject to exclusion pursuant to art. 24 sec. 1 and par. 5
2. The contractor will personally perform the key parts of the order:
Execution of the water supply network
3. Ordering Party requirements referred to in art. 29 para. 3a Pzp, ie
1) of employment on the basis of a contract of employment by the contractor or sub-contractthe spur of persons performing direct actions in the scope of order fulfillment: for preparatory works, sanitary and electric networks.
4. Bid bond in the amount of PLN 10, 000.00 in words: ten thousand zlotys
5. According to art. 13 (1) and (2) of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27.4.2016 and repeal of Directive 95/46 / EC (general regulation on the protectionof data (EU Journal L 119 of 4.5.2016, page 1)), further on "RODO", I inform that: - the personal data administrator is the Karkonoski National Park with its registered office in Jelenia Gora, Chałubińskiego 23, 58 -570 Jelenia Gora, POLAND, tel. 48 757553726, e-mail address:
[email protected]- the inspector of personal data protection in the Karkonosze National Park with headquarters in Jelenia Gora is: Leszek Wierzbicki;
[email protected] The indicated personal data by the Contractor will be processed on the basis of art. 6 par. 1 lit. c ROPE for the purpose related to the procurement procedure "Implementation of the construction works of the first stage of the investment of the Museum and Education Center of the Karkonosze National Park Pałac Sobieszow Stage I / C", KPN / 11/2019 conducted under the unlimited tender procedure,
- The indicated personal data will be keptdispensed, in accordance with art. 97 par. 1 of the Public Procurement Law, for the period up to 2030 from the date of completion of the procurement procedure,
- The obligation of the Contractor to provide personal data directly to you is a statutory requirement set out in the Public Procurement Law, related to participation in the public procurement procedure, regarding your personal data, decisions nThey will not be taken in an automated manner, pursuant to art. 22 RODO:
You have:
a) Pursuant to art. 15 RODO the right of access to your personal data concerning;
b) Pursuant to art. 16 RODO right to rectify your personal data;
c) Pursuant to art. 18 RODO the right to request the administrator to restrict the processing of personal data, subject to the cases referred toin art 18 para. 2 RODO, the right to limit processing does not apply to storage, in order to ensure the use of legal protection means or to protect the rights of another natural or legal person, or due to important public interests of the European Union or a Member State; ) The right to file a complaint to the President of the Office for Personal Data Protection, when you think that the processing of personal data concerning you violates the provisions of the RODO;
You are not entitled to:
a) In connection with art. 17 sec. 3 lit. b, d or e RODO the right to delete personal data;
b) The right to transfer personal data referred to in art. 20 RODO;
c) Pursuant to art. 21 RODO the right to object to the processing of personal data, as the legal basis for processingYour personal data is Article 6 par. 1 lit. c GROUND
Internet address (URL): http://www.kpnmab.pl