Contract notice: Construction work Tender in Poland - 34248978
Tender notice from Poland, published on 28 Jun 2019.
Executive Summary
The SKARB PA?STWA PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE NADLE?NICTWO RZEPIN has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 28 Jun 2019 and is scheduled to close on 21 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34248978, while the tender notice number is 299469-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45200000, 45240000, 45247000, 45247270, 45000000, 45200000, 45240000, 45247000, 45247270 CPV Description: Construction work. Works for construction works or civil engineering work. Construction work for dams, canals, irrigation channels and reservoirs. Reservoir construction works. Reconstruction of retention reservoirs in the Rzepin Forest District Reference Number: SA.270.3.1.2019.MRN The subject of the order are construction works consisting in the reconstruction of fourrech of existing retention reservoirs located in the Rzepin Forestry District: Rzepin and Nowy Młyn. Main Site: Nadleśnictwo Rzepin, Nowy Młyn Forest Area The reservoir planned for reconstitution is located on plots No. 93/6 and 329, rev. Gajec, town of Rzepin, area Słubice, province Lubusz. In the Odra River basin (1st row), laterally located to the Ilanka River (2nd row) in the area of its km 27, 670, which is a right-bank tributary of the Oder in km 184 710. Ilanka's lateral tank collects water, but its bottom is much muddled and discharged. The canopy of the reservoir is overgrown with common reed (Phragmites australis) and broad-leaved (Typha sngustifolia L.). On old dikes, grew blackberry (Rubus hirtus), nettle (Urtica dioica) and black alder (Alnus glutinosa).No species of protected species were found. On the basis of geotechnical tests, the technical condition of the dike is assessed as satisfactory. The dikes are overgrown with shrubs and trees, locally washed, locally broken. The water level is maintained at the level of the existing bottom outlet of 46.8 m above sea level. The construction of the embankment and its direct location is disturbed as a result of the plant's activityroot integration into the soil layers. In the structure of the dam, the sprinkling parts of plants are visible. A forest side road with a width of 3.5 m is guided along the front dam of the tank. No damage was noted in the road construction. A reduction of the road in the area of the bottom vent was noted, which may in the future threaten the safe use of the road. Bottom rebate in the form of a 0500 mm pipe is silted. reservoirsk does not have an emergency transfer. The existing feeder trough, in the northern part of the reservoir, was destroyed, infiltrated and covered with vegetation. In the western part of the canopy of the reservoir there is the old oxbow of Ilanka. The area occupied by the existing reservoir is approx. 2.0 ha (including the surface of slopes of the reservoir not occupied by water). The reservoir is designed to be left as side, renovated in its original location, powered by the waters of the Ilanka River. Water will be supplied to the reservoir by recreating the primary water feeder in the north-eastern part of the reservoir, plot no. 329, rev. Gajec. The feed trough will be made as originally with a width of 3.0 m in the bottom and inclination of slopes 1: 2. The crown of the road along the front dam is designed nand 49.24 m above sea level in the axis of the roadway, as it was before the occurrence of subsidence. The ordinates in the individual cross-sections correspond to leveling the roadway cavity due to the settlement of the existing dam at the place of the bottom outlet. The oxbow lake will be desolated, and the area adjacent to it is sorted out by removing fallen trees, garbage lying on the bottom of the riverbed, caring for trees andewow (trim). Designs are made of peninsulas with fine sand surfaces. up to 2 mm and gentle descend from escarpments, allowing the animals to access the waterhole. In the southern part of the reservoir (in the bay) you can plant a reed or water stick and a water lily. Due to the limitation of the costs of later operation, maintenance and abandonment of entryApplication of concrete admixtures in the form of joined spirally corrugated steel pipes has been designed for the application of concrete admixtures to the water, as well as the speed of construction. The water drainage system consists of a bleed in the form of a pipe 0500 mm, overflow well 02000 mm stabilized in the bottom with a stone coating, secured with hot grating and an oval-shaped pipe - outflow from under the dam, connected tightly to the pwith connectors. The well serves as an emergency overflow, which can not be guided on the slope due to the forest path leading the frontal dam. To enable the NPP to be reached, a double shutter made of plank boards was designed in the well. A forest road width of 4.0 m will be reconstructed along the frontal dam's crown. The road will be made of a stone pavement 30-50 cm thickhanded on the control layer on a cement stabilized substrate. Contractors who meet the conditions for participation in the proceedings referred to in Article 22 par. 1b of the PPL regarding: 1) competences or entitlements to conduct a specific professional activity, if it results from separate regulations. - The Ordering Party does not set out specific requirements for the description of the fulfillmentThis procedure may be participated by Contractors who meet the conditions for participation in the proceedings referred to in art. 22 par. 1b of the PPL regarding: 2) economic or financial situation. The ordering party does not make any particular requirements regarding the description of compliance with the condition of participation in the proceedings with respect to the condition regarding the economic situation.and the financial situation will be met if the Contractor shows that he has financial resources or creditworthiness not less than: - for part I: PLN 400, 000.00 gross, - for part II: PLN 300, 000.00 gross. In the proceedings may participate in Contractors who are not subject to exclusion (Article 24 paragraph 1 items 12-23 Pzp, article 24 paragraph 5 items 1-2 and 4-8 Pzp). In order to confirm the lack of grounds for the exclusionfrom the proceedings, and in order to confirm compliance with the conditions for participation in the proceedings, the Contractor will be required to provide the Employer with the following statements and documents: a) Contractor's declaration submitted on the uniform European Order Form (hereinafter "EAT"), EAT should be submitted with the offer HOW THE Contractor prepares, under pain of nullity, in the form of an electron(b) a list of construction works (specimen is attached as Annex 6 to the ToR); c) evidence that construction works shown in EED to confirm compliance with the condition for participation in a technical or professional capacity have been made or are duly performed in accordance with the requirements of the ToR; d) list of persons, (the template is provided in Annexdisappearing No. 7 to SIWZ); e) a list of technical devices (specimen is attached as Appendix 8 to SIWZ); f) information from the bank or Cooperative Savings and Credit Union confirming the amount of financial resources held or creditworthiness of the contractor in a period not earlier than 1 month before the deadline for submitting offers; g) copy from the relevant register or from the Central Register and Informationji on Economic Activity, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 Pzp; h) certificate of the head of the US confirming that the contractor is not in arrears with paying taxes, issued no earlier than 3 months before the deadline for submission of bids or other document in accordance with the requirements of the ToR; and) a certificate from the relevant ZUS or KRUS organizational unit or other document confirming that the contractor is not in arrears with paying social security or health insurance premiums in accordance with the SIWZ requirements; constituting Annexe No. 9 to the Terms of Reference); l) a declaration of belonging or non-affiliation to the SIWZ;the same capital group referred to in art. 24 sec. 1 point 23 Pzp. (according to the template constituting Appendix No. 4 to the Terms of Reference) - if the Contractor has its registered office or place of residence outside the territory of the Republic of Poland, instead of the following documents: 1) mentioned in point (g) i) submit a document or documents issued in the country in which he is established or resident, confirming respectively that: (a) no liquidation has been opened or bankruptcy has been declared, (b) it is not in arrears with taxes, fees, social security or health contributions, or that it has entered into an agreement with the competent authority regarding repayment of such receivables; 2) referred to in point j ) submits information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent authorityjudicial or administrative in the country in which the contractor has its seat or place of residence or place of residence has a person who concerns information or a document within the scope specified in art. 24 sec. 1 items 13, 14 and 21 Pzp and in art. 24 sec. 5 points 5 and 6 Pzp. If in the country in which the Contractor has his registered office or place of residence or the place of residence of the person the document refers to, nothe documents referred to in point 7.4, it is replaced by a document containing the statement of the contractor, indicating the person or persons authorized to represent it, or a statement of the person concerned - the contractor may rely on the technical or professional capacity or financial situation of other entities. Then folds - Eat the podm. third, - seethird party relationship - according to Annex No. 5 to the Terms of Reference - Contractor, which relies on the resources of other entities in accordance with art. 22a para. 1 Pzp. in relation to them, documents are exchanged. in point g-l Internet address (URL): www.szczecin.lasy.gov.pl/rzepin
The bid deadline for Contract notice: Construction work was 21 Aug 2019. Bidding is closed.
This tender has been issued by SKARB PA?STWA PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE NADLE?NICTWO RZEPIN in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45200000 - Works for complete or part construction and civil engineering work, 45240000 - Construction work for water projects, 45247000 - Construction work for dams, canals, irrigation channels and aqueducts, 45247270 - Reservoir construction works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34248978. The purchaser document reference is 299469-2019.