Contract notice: Construction work Tender in Poland - 33847499
Tender notice from Poland, published on 14 Jun 2019.
Exeutive Summary
The PRZEDSI?BIORSTWO GOSPODARKI KOMUNALNEJ „SANIKOM” SPÓ?KA Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 14 Jun 2019 and is scheduled to close on 18 Jul 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33847499, while the tender notice number is 276372-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45222100, 45222110, 45000000, 45222100, 45222110 CPV Description: Construction work. Waste-treatment plant construction work. Waste disposal site construction work. Modernization of waste disposal plant at ul. Zielona in Lubawka - mechanical part Reference Number: 19 / JRP / PZ / 2019 Modernization of the Waste Treatment Plant (ZUO) at ul. Zielona in Lubawka is part of the project "Optimization and implementation of new processing processesand recovery of waste in the Central Sino-Economy Waste Region in order to increase recycling levels. " Main Site: Zakład Unieszkodliwiania Odpadow (ZUO) at Zielona Street in Lubawka, POLAND The scope of the undertaking includes the modernization of the mechanical part of ZUO Lubawka in the following scope: the modernization of the installation for the mechanical treatment of waste and its effective improvementIt is envisaged to equip it with the following devices: • bag bagging, • additional double-deck screen (double deck screen) for fraction 0-15 (20) mm / 100 mm separation of mineral and ash fraction from mixed municipal waste stream, • additional sieve cascade (cascade screen) for separating the 300 mm fraction, • performing a partition in the sorting room betweenon the waste mixed up, and the rest of the sorting hall, • installation of the process air dust removal from the mill and the shredder's work area, • change of the system of individual equipment for mechanical waste treatment: transfer of the existing iron metal separator into the vicinity of the double-deck screening machine, by-pass pre-shredder, hopper withreverse conveyor enabling the provision of waste to the NIR separator and directly to the final shredder / pressing, additionally it is required to open the bags with biodegradable waste, so pre-prepared biodegradable waste should be directed to the pre-cabin, for initial segregation, omitting the screen double deck, receptionbiodegradable waste after opening bags from the cabin by means of a conveyor outside the halls, exchange of decks on the existing 0-50 mm and 0-80 mm drum sieve with a new analogue structure, update and modernization of the entire line control system for mechanical sorting of waste taking into account changes made to the sorting line. Other elements of the plant's equipment: - in the frameIn order to improve the efficiency and operating pressure, - due to the need to store hazardous waste sorted in the ZUO from the municipal waste stream, it is necessary to provide for the purchase, delivery and assembly of a specialized container for hazardous waste, - duefor the modernization of the fire system ZUO within the scope of this order it is planned to equip the mechanical part of the waste sorting line with fire protection installation. automatic system for quick detection and suppression of ignition sources on the grinding line and spark detection and extinguishing system for a suction installation, - car scales from overrun to recessed are required, locationat the entrance gate, the scale is equipped with a drainage system, along with the replacement of the weighing container, - within the scope of the Contractor is also carrying out technological start-ups of the above-mentioned installation of mechanical and biological waste treatment (MBP) and obtaining all necessary permits and decisions included in Polish law for the proper functioning of the above installation. a) The ordering requires, aby the contractor had third-party liability insurance for the business related to the subject of the contract, for a guarantee sum not lower than: 1, 000, 000.00 PLN. b) The contractor requires the contractor to have financial means or creditworthiness of at least 500, 000, 00 PLN in the period not earlier than one month before the deadline for submitting bidsIf two or more Contractors jointly apply for the award of this contract, their total economic and financial situation will be assessed - for this purpose documents must be submitted by those or those Contractors who will demonstrate compliance with this condition on behalf of all. Contractors of documents containing data in currencies other than PLN, Ordering Party, as the exchange rate of this currency, the average exchange rate of the National Bank of Poland (NBP) published on the day of issuing the document will be accepted. If, on the day of issue of the document, the average NBP exchange rate table was not published, the exchange rate from the last table of average exchange rates published immediately prior to the date of issue of the document will be used.from participation in the proceedings, the contractor, at the request of the Employer, submits following documents: 1) information from the National Criminal Register in the scope specified in art. 24 sec. 1 point 13, 14 and 21 of the Act; 2) a certificate from the competent head of the tax office confirming that the contractor is not in arrears with paying taxes, issued not earlier than 3 months before the deadline for submission of tenders, or another document confirming that the contractor has entered into an agreement with the competent tax authority regarding the repayment of such receivables with any interest or fines, in particular it has obtained the legally required exemption, deferral or payment in installments of overdue payments or suspension in its entirety of the decision of the competent authority; ) certificate of the relevant local unitorganizational Social Security or Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with payment of social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission of bids, or other document confirming that the contractor has concluded an agreement with the competent body in the caseknows the repayment of such receivables with possible interest or fines, in particular it obtained the legally required exemption, deferral or installment payment of overdue payments or suspension in its entirety of the decision of the competent authority; 4) excerpt from the relevant register or central records and business information if separate regulations require an entry in the register orrecords in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act; If the contractor has its registered office or place of residence outside the territory of the Republic of Poland, instead of the documents referred to in para. 9: 1) point 1 provides information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial authority orb of the country in which the contractor has its seat or place of residence or place of residence has a person who concerns information or a document, to the extent specified in art. 24 sec. 1 items 13, 14 and 21 and par. 5 points 5 and 6 of the Public Procurement Law Acts, 2) point 2 4 submits a document or documents issued in the country in which the contractor has its registered office or place of residence, confirming that: a)he is not in arrears with the payment of taxes, fees, social security or health insurance contributions or that he has entered into an agreement with the competent authority regarding repayment of such receivables with possible interest or fines, in particular he obtained the legally required exemption, postponement or installment payment of overdue payments or suspension in the entire implementation of the decision of the competent authority, - b) not openedthe deadline for its liquidation and bankruptcy was not announced. The offer validity period is 60 days. Internet address (URL): www.sanikom.com.pl
The bid deadline for Contract notice: Construction work was 18 Jul 2019. Bidding is closed.
This tender has been issued by PRZEDSI?BIORSTWO GOSPODARKI KOMUNALNEJ „SANIKOM” SPÓ?KA Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45222100 - Waste-treatment plant construction work, 45222110 - Waste disposal site construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33847499. The purchaser document reference is 276372-2019.