Contract notice: Construction work Tender in Poland - 33775169
Tender notice from Poland, published on 12 Jun 2019.
Executive Summary
The UNIWERSYTET PRZYRODNICZY WE WROC?AWIU has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 12 Jun 2019 and is scheduled to close on 16 Jul 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33775169, while the tender notice number is 270653-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 71000000, 71320000, 45100000, 45111200, 45110000, 45214000, 45262700, 45300000, 45400000, 45262420, 45000000, 71000000, 71320000, 45100000, 45111200, 45110000, 45214000, 45262700, 45300000, 45400000, 45262420 CPV Description: Construction work. Architectural, construction, engineering and inspection services. Engineering design services. Site preparation work. Site preparation and clearance work. Building demolition and wrecking work and earthmoving work. Construction work for buildings relating to education and research. Building alteration work. Building installation work. Building completion work. Structural steel erection work for structures. Design and construction of Plant Production Technology Research Center Reference Number: R0AP0000.271.68.2019 Design and construction of "Research Center of Plant Production Technology" together with necessary underground and ground infrastructure as well as permanently installed equipment, as well as development the area around the newly constructed building, obtaining afterconstruction and occupancy permit. The building of the Plant Production Technology Research Center will house the laboratory team: Main Site: ul. Bartnicza, 51-513 Wrocław, plot No. 2/1, AM-14, precinct Swojczyce, POLAND. Design and construction of "Research Center for Plant Production Technology" together with the necessary underground and ground infrastructure as well as assembly equipmentThe construction of the Plant Production Technology Research Center will house the laboratory team: 1. Laboratory of Soil and Plant Analyzes consisting of Laboratory of Soil Analysis and Environmental Risk, Laboratory of Physical and Structural Properties of Soils, Pracowni Soil Zoology, Plant Biometry Laboratory, Quality Laboratory of Plant Raw Materials, which enable a full analysis of the assessment of the condition of the soil environment. 2. Laboratory of Biochemistry and Cell Biology to assess plant reactions to biotic and abiotic environmental factors. 3. Laboratory of Innovative Methods of Plant Protection. Design work will include obtaining all necessary documents, arrangements and materials necessary for the commencement and completion of project works, execution of construction, technological and executive projects in all industries and after the implementation. The construction works will consist in the construction of a new non-basement one-story building with a usable attic. The object is to accommodate the above laboratories with social facilities for employees, and be equipped withall installations and equipment necessary for its operation. The task also includes the construction of media connections for the object (water, gas, electricity) and sewage from it. A diary description of the documentation and scope of the robot and the objective to be achieved is included in the PFU study with attachments. The investment is carried out on the principle of design and build. behaviornot carried out in the form of an unlimited tender. On the basis of art. 29 para. 3a of the Public Procurement Law, the Employer requires employment on the basis of a contract of employment by the Contractor or Subcontractor persons performing the following construction and installation works during the implementation of the order: construction (masonry, reinforced concrete and steel), plastering (wet and dry), painting, installation, electrical, installationSanitary. In the scope of the above The project has a contract for co-financing from the EU funds under the European Regional Development Fund of the Regional Operational Program of the Lower Silesian Voivodship for the years 2014-2020. The Contracting Authority may annul the proceedings for the award of a contract based on art. 93 par. 1a of the Public Procurement Law, if the funds that the contracting authority intended to allocate for financingall or part of the order has not been granted. The Contractor may, in order to confirm compliance with the conditions of participation in the procedure, in relevant situations and with reference to a specific order, or a part thereof, rely on technical or professional ability or financial or economic situation of other entities, regardless of the legal nature of the legal relationship he has with itch. The Contractor, which relies on the abilities or situation of other entities, must prove to the Employer that while performing the order, he will have the necessary resources of these entities, in particular presenting the obligation (in original) of these entities to give him the necessary resources for the needs of the order. The ordering party provides for the possibility of ordering, oreferred to in Article 67 sec. 1 point 6 of the PPL, construction works (in the field of architecture, construction, sanitary and electrical installations), general construction works, sanit installation works. and electric along with devices, accessories including LAN and access control. These orders will be granted on terms specified in a separate agreement after negotiations with the Contractorbasic order pursuant to Article 66 par. 1 of the Public Procurement Law. The Ordering Party does not establish specific conditions in this respect. General information regarding the subject proceedings: Contractors may participate in the proceedings, who are not subject to exclusion from the proceedings for granting the order in the circumstances referred to in art. 24 sec. 1 item 12-23 of the PPL and referred to in art. 24 sec. 5 points 1 2 and 4 8 Pzp. If the Contractor is established or resides outside the territory of the Republic of Poland, instead of the documents referred to in Section III.1.3 of the contract notice (excerpt from the relevant register, certificate from the tax office, ZUS / KRUS certificate), submit a document or documents issued in the country in which has its registered office or place of residence, confirming the answernotably, that its liquidation was not opened or bankruptcy was declared, it is not in arrears with taxes, fees, social security or health insurance contributions or that it made an agreement with the competent authority regarding repayment of such receivables with possible interest or fines, in particular it obtained the right to release, defer or split into installments of arrears or inmaintaining in full the implementation of the decision of the competent authority referred to in section III.1.3 of the contract notice (certificate from the National Criminal Register) submits information from the relevant register or, in the absence of such register, another equivalent document issued by the competent judicial or administrative body of the country in which the contractor has a registered office or place of residence or place forthe flat has a person who concerns information or a document within the scope defined in art. 24 sec. 1 items 13, 14 and 21 Pzp and in art. 24 sec. 5 points 5 and 6 Pzp. Details regarding documents submitted by foreign entities are described in chapter 7 of the ToR (items 7.4 to 7.8). The ordering party does not allow the aggregation of both the construction works and the annual turnover by contractors jointly applyingI am looking to order. If any value in the documents submitted by the Contractor is given in a foreign currency (other than PLN), the Contracting Party will convert the value of the currency into PLN according to the average NBP exchange rate as of the day of submitting the announcement of the invitation to the Official Journal of the European Union. If for justified reasons, the Contractor can not submit documents regarding the economic situationrequired by the Ordering Party, may submit another document, which sufficiently confirms compliance with the condition described by the Ordering Party. With respect to the conditions regarding education, professional qualifications or experience of the Contractor, they may rely on the capacities of other entities, if these entities carry out construction works for which these capacities are required.contractual obligations are listed in the contract template - Annex No. 2 to the Terms of Reference, point 25. The contractor requires a minimum of 36 months warranty and 60 months warranty for the contracted object. The warranty and warranty period runs from the date of final acceptance without defects. The Ordering Party may exercise the rights under the warranty regardless of the rights under the guarantee. Warranty and warrantyit should be granted on terms specified in the ToR and attachments to the Terms of Reference. The procedure is conducted in an unlimited tender procedure. If the Contractor, demonstrating compliance with the conditions referred to in art. 22 clause 1b of the PPL, relies on the resources of other entities on the principles set out in art. 22a para. 1 PPL, Contractor Will be obliged to: 1) submit a third party statement on fulfillment of the conditionnkow participation in the proceedings (in respect of - the Condition in relation to which he makes his potential available) and the lack of grounds for exclusion submitted on the EAT Form 2) presenting in relation to these entities the documents mentioned in point 7.1. point d l SIWZ. Documents mentioned in point 7.1. point d - l SIWZ The Contractor will be obliged to submit within the deadline indicated by the Ordering Party, not shorterthat 10 days, specified in the request issued by the Employer This condition, in relation to the economic situation, will be met if the Contractor shows that he has achieved the minimum annual turnover of not less than PLN 2, 500, 000 for the last 3 financial years, and if the period running a business is shorter for this period. The ordering party does not set a condition for the situationfinancial. The assessment in relation to all conditions will take place on the basis of criterion meets / does not meet based on information contained in EED, and then confirmed in documents or statements submitted by the Contractor, whose offer will be rated the highest. Documents confirming fulfillment of the conditions relating to the economic capability share: the financial statement or its part, if preparation of the report is required by the law of the country in which the contractor is established or resides, and if it is subject to auditing in accordance with the accounting regulations, also with an opinion on the audited statement or its parts, and in the case of contractors not obliged to preparation of financial statements, other documentsin, for example, the turnover and assets and liabilities for a period not longer than the last 3 financial years, and if the period of business is shorter for that period; a statement by the contractor on the annual turnover of the contractor for a period not longer than the last 3 financial years, and if the period of business is shorter for this period (the template is an attachment to the Terms of Reference). If from uzfor a legitimate reason, the contractor can not submit documents regarding the financial or economic situation required by the contracting authority, he may submit another document, which sufficiently confirms fulfillment of the condition of participation in the procedure described by the contracting party, in accordance with the rules provided for the so-called "Reversed procedure", referred to in Article 24 aa paragraphs 1 and 2 of the PPL, will evaluate the offers, and then examine whether the contractor whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings. The Contracting Authority requires a deposit of PLN 50, 000 - detailed in Chapter 9 of the Terms of Reference. The Contracting Authority informs that the list of statements and documents confirming compliance with the conditions of participation in the proceedings and the lack of afterexclusion clause is specified in SIWZ, chapters 6, 7. The ordering party does not establish a dynamic purchasing system. The Awarding Entity does not provide for the selection of the most advantageous offer with the use of an electronic auction. The contracting authority does not provide for the conclusion of a framework agreement. Criteria for the evaluation of offers: Price 60%, experience of persons designated for the implementation of 30% orders, 10% guarantee. The offer must contain the followingdocuments: - a) the form of the offer and statements enabling evaluation of offers in the criteria - on the offer form (Annex No. 4 to the ToR); b) the summary price list (Annex No. 6 to the ToR); c) the table of equipment mounted on permanent (Annex No. 7 to the Terms of Reference); In addition, the offer should be accompanied by: - a) in the case of signing the offer by a proxy, and in the case of a contractoro) a third party's obligation or another document to demonstrate the availability of the potential to the Contractor by a third party within the scope defined in art. 22a para. 1 of the Public Procurement Law (Annex to the Terms of Reference, if applicable), c) documents confirming the equivalence of the deliveries, services and construction works (if applicable). EAT belongy submit only in electronic form, as specified in chapter 2a of the ToR. - Documents submitted by foreign entities are described in chapter 7 of the ToR. The Contractor, Subcontractor or further Subcontractor intending to conclude a subcontract which is the subject of works, is obliged during the performance of the public contract for construction works, to be submitted to the Contracting Party proof this contract, with the Subcontractor or further Subcontractor being obliged to attach the Contractor's consent to the conclusion of the subcontract with the content in accordance with the draft contract. In the case of contractors jointly applying for a contract, the condition regarding and the condition regarding the ability of techn. and professional qualifications in the field of experience will be considered fulfilled when they are metone of the contractors who submit a joint offer will prove it. Demonstration of fulfillment of the condition in the scope of persons referred by the contractor for the implementation of the contractor's joint application for the contract may be met jointly (jointly). None of the contractors jointly applying for the award may be excluded from the proceedings. The most favorable will bethe accepted offer, which obtained in total the highest number of points resulting from the sum of points received in the offer evaluation criteria. The offer may receive a maximum of 100 points. The contractor entered in the official list of approved Contractors or the Contractor certified by certification bodies that meet the requirements of European certification standards may submit a certificate of entry in the official listissued by the competent authority or a certificate issued by the competent certification body of the country in which the contractor has its registered office or place of residence, indicating documents constituting the basis for entry or certification, instead of the relevant documents listed in section III.1.3 of the procurement notice. More in the SIWZ - chapter 7. Internet address (URL): www.upwr.edu.pl
The bid deadline for Contract notice: Construction work was 16 Jul 2019. Bidding is closed.
This tender has been issued by UNIWERSYTET PRZYRODNICZY WE WROC?AWIU in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 71000000 - Architectural, construction, engineering and inspection services, 71320000 - Engineering design services, 45100000 - Site preparation work, 45111200 - Site preparation and clearance work, 45110000 - Building demolition and wrecking work and earthmoving work, 45214000 - Construction work for buildings relating to education and research, 45262700 - Building alteration work, 45300000 - Building installation work, 45400000 - Building completion work, 45262420 - Structural steel erection work for structures.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33775169. The purchaser document reference is 270653-2019.