This tender has closedBids were accepted until 08 Jul 2019 (2684 days ago). New bids can no longer be submitted. The details below are kept for reference.
Contract notice: Construction work Tender in Hungary - 33715868
Tender notice from Hungary, published on 10 Jun 2019.
Exeutive Summary
The KARCAGI TANKERÜLETI KÖZPONT has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 10 Jun 2019 and is scheduled to close on 08 Jul 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 33715868, while the tender notice number is 267279-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local Agency/Office Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 09331000, 42416000, 45210000, 45261210, 45262500, 45321000, 45410000, 45421100, 45442100, 45000000, 09331000, 42416000, 45210000, 45261210, 45262500, 45321000, 45410000, 45421100, 45442100 CPV Description: Construction work. Solar panels. Lifts, skip hoists, hoists, escalators and moving walkways. Building construction work. Roof-covering work. Masonry and bricklaying work. Thermal insulation work. Plastering work. Installation of doors and windows and related components. Painting work. KTK-Toeroekszentmiklos_Hunyadi M. Alt. Isk. Reference Number : EKR000359302019 Vallalkozasi szerződes, a toeroekszentmiklosi Hunyadi Matyas Hungarian - English Ket Tanitasi Main Site: Hunyadi Matyas Hungarian - English Ket Tanitasi Low School The works and workloads listed below are for the benefit of the Proponent (hereafter: AT.) for the large order of work, and are not considered tenyleges work to be done and how much they show. The construction worker is workinginformation about the technical grade and material quality, the quantities are included in the documentation of the documentary document, power epitope permission, the export-level design documentation and the unassociated coaxial material. (major quantities): - Developsin the basement of the basement (2): 156, 01 m; lining: 3 144, 20 m, - Dismantling of the entire roof structure, asbestos removal and fingertips, diving out of the pods: Obsolete, roof roofs and hejalas, and regi foedem retegregation 1 178, 5 m brutto on the covered floor space, - Emeletraepites: The demolished padlaster 1 178.5 m gross (approx. 848, 03 m neto) new ground floor II. upstairs level, - Elevator atepites to new level 1 - Heated up-to-date sites: replacement of obsolete gas boiler, 4 new, modern boilers, - Free of charge: A free ramp is designed for the epuel with delta 50 m2 space, - Parkolo built-in interior: 9 2 pieces of parking 1 pc. AKM car park is an interior road leading to parking lotsepitae, - Tueziviztarolo formed by: Yard space 80 m flexible tueziviztarolo epitese, - Epueletvillamossagi moderni, - Epueletgepeszet, - Floor, foedem and wall insulation works (water, sound and thermal insulation): 1 682 m - You lay your floor works: Cold, warm, cauliflower, indoor covering laid, wallcovering: 1 747 m.should be responsible for the implementation of all the tasks set out in the Treaties. Including the total amount and possible allowances that are not explicitly provided for in the design documentation, in coelings, but according to the professional technicians, the author's tongue is impeccable to the complete dog-developer.vdocumentation and the final epitope permission. Winning Proponents Koeteles is an expert in all professional licensing and advocacy activities, which involves the implementation of the construction work, oesefefeg, as well as the use of the Letesitmeny for the work of the Letesitmeny. Letesitmeny is a successful technical atadas-deceive, The Koezbekerzesi Documents are technical content, suitable for use, without lacks of realization. The task of the winner Proponent is as long as they are not complete in the design-level documentation of the export level and in the other relevant documents of Koezbuterz. You can start working time at the time of the work in the epite naplomegnyitasaval. AK. wins the work space in 10 days with the winner AT. Considering that the workshops of the working-class artist, the uezemelő intezmenyben toertenik, 10.6.2019. 08/25/2019. and 10.6.2020. 08/25/2020. koezoett receives unlimited work space winning AT. During this period, the work-in-progress can be brought to life by a cascade with AK. The Korlatlan periods of work space (10.6.2019 25.8.2019 and 10.6.2020 25.8.2020), pre-arranged or (if applicable) pre-negotiated with AK, AK. winner AT. Organize and cook the epite works (in the epueleten Kivuel and Beluel). The equinox is considered to be a piece of clothing in the Koezbekerze documentary (Segedlet) It is not possible to have a timer (in the case of koezoes not one of the timekeepers), subordinate, and not be allowed to have a real master in the real case, who is Kbt. Article 62 (1) and (2) excludes any of the reasons under one's authority. The power of prophecy has to elude from the eljaras the kind of reporter, subordinate to the righteous.against the Kbt. The reasons for exclusion set out in Section 62 (1) and (2) are entered in the first line. True Mod: The timer and the Kbt. Section 65 (7) of the Act on the right to apply to the organization / person at the time of submission of the report. (X.30.) Government Decree II. In accordance with Chapter 1, in the Single European Coaching Document (below)an: EEKD) must be confirmed in advance by the submission that the Kbt. Paragraphs (1) and (2) of Section 62 apply to Kbt. According to Article 69 para. The timekeeper (s) of the settlement in Hungary, and, if applicable, the host of the appropriate reader, with respect to stapler (s), as described in 321/2015. (X.30.) The Kbt. The reasons set out in Section 62 (1) and (2) do not apply. Section 62 (k) (ca) regarding the prevention of penzmosa and terrorist finance bribes and disrupting them in 2017.ev LIII. toerveny (hereinafter referred to as penzmosasrol szolo toerveny) 3. - 38 (a) - (b) or (d) szerine is defined by all tenant owners and declarations containing allando residences are included; if the host entity does not have a tenant owner under section 38 (a) - (b) or (d) of the penzmosasrol, please attach a statement to that effect. In the case of the Non-Hungarian Proponent, the Influence Force is in 321/2015. (X.30.) Accept the real-time certificates and documentary declarations pursuant to Section 10 of the Government Decree. I will be subordinate to those who do not take the correct proof of the Kbt. Shall submit a declaration pursuant to Section 67 (4). The non-verbal case is inserted if Kbt. Article 69 (11). The Kbt. - 64 basedz oentystic law. In this case, the final decision is made with the form in the form. In the event of a pending entry, the subscriber will enclose to the Ajanlat the variables entered in the cegbirosag, and the verbized by the cegbirosag. If the scheduler is not in progressn non-custodial entry is subject to such a change Incomplete declaration (Section 30 of Government Decree 321/2015. (X.30.)) The reasons for the exclusion are not confirmed in the dog Recapitalisation of the host Performed by the former choreographer in the EDF, he introduced it electronically. in thisin this case, the host actor must declare which earlier authenticated document to take into consideration the biralat line. For the sake of embarrassment, there is an explicit reference to the 321/2015. (X.30.) Government Decree 1 Section 16. Please note that you have any professional requirements. in section III.1.2) Vegzesere of professional activityrasa [Kbt. Section 65 (1) (c)]: SZ.1. Professional Qualification Kbt. Article 65 (1) (c) and Article 322/2015. (X.30.) K.r. Section 21 (1) Based on the prediction force for the economic operators engaged in the construction industry, the Etv. The company is based in Hungary and is not based in Hungary.in case of cases, the registered country of the country of residence, or with a license issued by a resident of the country of residence, a legal entity or an organization with a member of the chamber tagag, is appropriately certified. In the case referred to in Section 65 para.321/2015. (X.30.) Government Decree (hereinafter referred to as Section 1) (1) The provisions of the article of the Government of the Republic of Hungary, Section II of the Government Decree. In accordance with the provisions of Section 5, the Uniform European Coalition Document (hereinafter: EEKD) must be certified in advance by the appropriate Co-ordinator under Section SZ1, before and after the event, by Kbt. 69. -4). - According to the preliminary proof of the Sz.1. Article 65 (7) of the case concerning the provision of capacity to an organization - the EECD IV. a simple statement made in section α of the α, letes letes letes letes letes letes letes letes letes letes letes letes letes letes letes letes letes letes res in further stages. The SZ.1. Yes. Article 69 (4) - a full-time reader of the newsletter: the SZ.1. Regardless of the case in the registered case in the case of the farmer established in Hungary, Aegan's strength is checked by the ceginformacios service free of charge, electronically accessible record data, registered by the single members, or by the ceginformacios.z Industry industry activities are based on the details of the flyers. In the case of a non-Hungarian economic operator, the language of the European Parliament and Council Directive 2014/24 / EU XI. a certificate (extract) or a certificate or a declaration of authenticity, as listed in the subsection, must be authenticated. In addition, the Kbt. Section 67 (3), Kbt. Section 65 (7), (9), (11)the Kbt. Article 69 (11) and the Koezbekerze Documentation. Non-adherent in the corpse of the corre- sponding testimonials in the corre- sponding suitcases The proprietary force introduces a truth from the host actor, which has been filed electronically in the EDF by the former journalist in the same news record. In this case, the host player has an arrowit must be clear which earlier documentary evidence is being taken into consideration by the biralat line. The timeliness attol fueggetlenuel examines whether the previously introduced truth corresponds to the actual content of the actual content of the given case, that the earlier truth may indicate that it is the one in which it comes Felhathey had been exposed to snuff. (424 / 2017. (XII. 19.) Government Decree - 12 (2)). 1. Foreword to the present Kezszererzja, the Kbt and the 424/2017. (XII.19.) Governmental Decree (EDF Regulation). based on electronic means. All of the actions in Eljaras are cross-bordered on the EDF system for registration. 2nd Bringing hosts to the attention of the housekeeperThe authors agree on the provisions of the EDF Regulation, Kbt. It is possible to divert from its possessors due to the electronic practitioner of the actions of Eljaras [Kbt.41. (6)], so take the Kbt into account in the case of Szabalyai. also have the rules of the EDF Regulation. 3rd The Kbt. Article 41 / B (2). Based on Foreword Predict that Only PDF Specifications(also in the case of aromatic coelts). You cannot apply secret in the case of PDF Document Format documents. In the case of secret documents, which cannot be opened freely, there is a sense of loyalty to the potential. 4th Rewarding the Kezszeszerz-n documents to all Proponents in an unrestricted and complete manner, in a straightforward and free way by the EDFfor culture. 5th Your Kbt. Section 68 and Article 15 (2) and (4) of the EDF Regulation shall be applicable. 2. The schedule shall include the updated statement of the Kbt. Section 66 (2) Regarding his partner 3. The propriety force does not exist in the first place and does not look for Kbt. Article 66 (a) and (b). 4. The timeliness is up to dateset out its terms for qualified journalists in Kepest's firm (M.1., M.2.). 5. Reflection Projects Excludes Both Proponent and Kezoes Recipients 6. Winner Timer at 322/2015. Section 26 - Based on the date of the authorship, it is necessary to have a full dog epitope-responsible person (or an existing responsible person Kitfor the whole duration of the contract: minimum HUF 20, 000, 000 / contract term and minimum HUF 10, 000, 000 / karesemeny. The responsible person should cover the third person's arm. An affiliated or extended responsible person may include, as a matter of urgency, time limits for force majeure. If the winner is Ajantathe person responsible for the work does not have the responsible person until the date of the authorship, it is up to the newsletter, and the Kbt. Article 131 (4) may be based on the most favorable proposer of the future. 7th Ertekeles aspect: Kbt. Article 76 (2) (c). Adhato Score: 0 100. The moderator of the artefact is the gold in the case of the AR criterion.Qualitative Criterion 4 is straightforward in the artistic aspect, as described in the Koezbekerze Documentation. points of interest awarded to you during the regular practice period Projects' level does not take into account the line of the art! If you make AF more than the Prophet's Day. Item II.2.5) 2-4 Samplesin one of the Kestian aspects in the evening, the professional oeuvre of the specialist (s) presented in the case of the conscientious aspect (s) attached to the newsletter (if applicable). The Kbt applies Kobt in the eagle line. 81 (5) - and Kbt. 75 (2) (e). It would make the Kbt publicly unpublished as a result. Article 75 (2)even if the EDF artificial error of the EDF comes from a legal person who cannot remedy the principles defined in the CCP Ervenyesueleset Insurance (Section 20 (6) of Government Decree 424/2017 (XII. 19.)) . 8th Accumulated Coach Ratio (AF IV.2.6) punctuated): 60 days, Kbt. Article 81 (11), sub-paragraph. FACT 9: dr. Ferenc Kerekes registration number: 00140 Attention Morei information from LSD. AF. VI.4.3) Indication of remedies in relation to their place of appearance (charactershiany okan). Internet address (URL): http://kk.gov.hu/karcag
The bid deadline for Contract notice: Construction work was 08 Jul 2019. Bidding is closed.
This tender has been issued by KARCAGI TANKERÜLETI KÖZPONT in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 09331000 - Solar panels, 42416000 - Lifts, skip hoists, hoists, escalators and moving walkways, 45210000 - Building construction work, 45261210 - Roof-covering work, 45262500 - Masonry and bricklaying work, 45321000 - Thermal insulation work, 45410000 - Plastering work, 45421100 - Installation of doors and windows and related components, 45442100 - Painting work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 33715868. The purchaser document reference is 267279-2019.
This tender falls under Construction and Real Estate, Power and Energy, Technology and Equipment in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.