Contract notice: Construction work Tender in Poland - 31502377
Tender notice from Poland, published on 13 Mar 2019.
Executive Summary
The PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE, NADLE?NICTWO K?DZIERZYN has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 13 Mar 2019 and is scheduled to close on 16 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31502377, while the tender notice number is 116454-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45100000, 45200000, 45110000, 45230000, 45111000, 45233000, 45111200, 45233226, 45000000, 45100000, 45200000, 45110000, 45230000, 45111000, 45233000, 45111200, 45233226 CPV Description: Construction work. Site preparation work. Works for complete or part construction and civil engineering work. Building demolition and wrecking work and earthmoving work. Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork. Demolition, site preparation and clearance work. Construction, foundation and surface works for highways, roads. Site construction and clearance work. Access road construction work. Rebuilding - reservoir renovation - Kozieława pond located in the forestry of Rudziniec, branch 184 in the area managed by the Kędzierzyn Forest District - II round. Reference Number: 02-10-1.1-01 The subject of the orders are construction works as part of the task carried out under the name "Reconstruction - renovation of the reservoir - Kozieławy pond, locatedin the forestry of Rudziniec, branch 184 in the area managed by the Kędzierzyn Forest District. the project is to be performed by the following robot: - Reconstruction of the channel of the watercourse Link (Provykopa) on episode from km 7 217.00 to km 7 052.49, from km 7 663 to km 7 653 as well as in the reservoir part from km 7 235.55 to km 7 653 - Reconstruction of an open ditch constituting a drainage section from overflow No. 2 to the watercourse on the length of 45.00 m - Reconstruction of the tank structure: transfer No. 1 with 2x diameter 1 000 mm - rebuild for overflow with elem. reinforced concrete. with a light of 2.5 x 2.5 m, partially limited bywith building in the bottom element with concrete and heavy stone throw, inlet chamber to the culvert: light 2.5 x 1.8 m, thickness of side walls 0.5 m, face wall 0.6 m, in the front wall in order to enable tank freezing provision is made for recesses for 2 chandeliers from channel sections, in the right side wall in order to ensure biological flow during the filling of the tank is provided withabudowa steel pipe with a diameter of 300 mm; transfer No. 2 with an extension of 1 x 800 mm diameter - rebuild for overflow with elem. reinforced concrete. with a light 2.5 x 1.5 m, inlet chamber for the culvert: light 2.5 x 1.4 m, side wall thickness 0.5 m, face wall 0.5 m, front wall on ordinate 204.85 m as above, a trapezoidal overflow with a width of 1.00 m will be made in the bottom with an inclination of edges 1: 1. The upper edge ofthe lion will be made on the ordinate of 205.15 m above sea level. - Construction of fish ladder, length 223 m, fall: max. 1:20, which includes: open trough (trapezoidal cross-section, with a constant depth of 1.2 m, width in the bottom of 1 m, slope of 1: 3, bottom reinforced with river rubble, 20 cm layer and irregularly arranged pebbles or broken stone 0.5 m in diameter, embedded in hydrotechnical concrete, to ensuredirections of water flow - steering wheels made of heavy stones with spacing every 2 m); rest chambers (3 pcs, length 10 m, water depth minimum 0.6 m, width at the bottom 2.2 m, slope slope 1: 2, construction as the kortyto open); reinforced concrete elements in the body of the dam dike - connecting the tank with the fish pass (the place of transition from the open channel with a width of 8 m wide, at the end of the concrete elementnew part will be made to enable permanent, tight connection of geomembrane, all reinforced concrete elements will be made on site on previously prepared substrate with 6-20 mm thick layer of 0.4 m thickness after compaction, the thickness of external walls will be from 0.3 to 0, 4 m, the width of the light passes will be 1.0 m, inside - partitions by a thickness of 0.2m, in the walls: passing by transfers with dimensions. 0.3 x 0.3 m, the difference of water mirrors in individual chambers is 0.1 m, in the existing passes the pass will be a culvert with a light of 1 x 1.3 m together with abutments and barriers, in the place of widening the dam - an open chamber covered with grates WEMA, an inlet hole with dimensions of 0.30 x 0.25 m will be made in the end wall) - Reconstruction of the canopy- earthworks (desludging the reservoir - removal of spoil, in order to ensure the storage of 61 596 m of water for NPP, slope profiled, slope 1: 3, sown with a mixture of grass, frontal dam reinforced in the base with a band of half-pipe 2 x 12-14 cm palikami fi 10-12 cm length 1.2 m at a distance of 0.5 m) - Overhaul of the road (on the dyke of the dam, length 177 m, width 3 m, the construction of the layer by the sideof the gr. 10 cm, covered with geoextreover, bottom layer 30 cm - stone breakage 31.5-63 mm, upper layer 10 cm - stone breakstone 0-31, 5 mm) - Fire intake - for water intake, from the walls of the larsena, from the drainage side frontal dyke, in the form of a niche with dimensions 13.3 x 8.68 x 9.44 m, with the housing of the recess concrete boughed with stone 15 cm with reinforcement mesh dia. 8 mm for 10 x 10 cm eyelets. - Execution of fire service yard - in order to enable water intake and fire vehicle traffic - extension of the existing road on the length of 50 m up to width 6 m (cavity form with the area of 370 m), parameters of the square as for road renovation - Export of the spoil for shelving - dumpers on the average distance of 1 km In order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 pkt 1 Pzp Contractor (hereinafter: "Chart"), the offer will be accompanied by an excerpt from the relevant register or central records and business information, if separate regulations require entry into the register or records. If the lecturer is established or resides outside the territory According to the above-mentioned information, the Republic of Poland (RP) files documents issued in the country in which it has its registered office orresidence, confirming that its liquidation has not been opened or bankruptcy has been announced. The Employer does not make any particular requirements regarding the description of compliance with the condition of participation in the proceedings with respect to the condition regarding economic capacity. The condition with regard to the financial situation will be met if the lecturer proves that he has financial means or creditworthiness not lessPLN 1, 000, 000.00. To confirm compliance with the conditions regarding the financial situation, Fee will complete the form of a single European order document (hereinafter referred to as "EAT") - Part IV letter a. and will submit to the Employer on the date indicated in the call (consolidated text with the mode of Article 26 paragraph 1 of the PPL) information of a bank or cooperative savings and credit union confirming the amount of financial resources ownedor the creditworthiness of Wyk, in a period not earlier than one month before the deadline for submission of tenders. If for justified reasons Wyk. can not submit documents regarding the financial or economic situation required by the contracting authority, may submit another document that sufficiently confirms compliance with the condition of participation in the procedure described by the orderer. The proceedings are conducted in accordance with the principles of the so-called "Reversed procedure" referred to in Article 24aa (1) and (2) of the Public Procurement Law - Communication between the Employer and the Customer is carried out using the Josephine platform https://josephine.proebiz.com/pl/ and e-mail with reservation that the submission of offers and statements, including the statement submitted on the EAT form takes place only throughJosephine platform. The electronic communication means will be software that meets the requirements described in the regulation. Of the Prime Minister of the President of 27.6.2017 in Sp. use of means of electronic communication in the procurement procedure public and sharing the storage of docs electronic devices implemented as part of the Josephine platform available at the internet address. given in secji I.3 Wadium - 80, 000.00 PLN, may be brought in the following forms: - money - bank guarantees or social-savings bank guarantees, except that the surety is always a cash guarantee - bank guarantees - insurance guarantees - sureties granted by entities referred to in art. 6b par. 5 points 2 of the Act of November 9, 2000 on utwaid Polish Agency for Enterprise Development The bid bond paid in cash should be transferred to the bank account of the Ordering Party at BGŻ BNP Paribas S.A. invoice number: 38 1600 1462 1027 6150 4000 0001 with a note: bid bond to secure an offer in the "Rebuilding - reservoir renovation - Kozieławy pond" procedure II In order to confirm the lack of grounds for exclusion from the proceedings forordering in the circumstances referred to in art. 24 sec. 1 item 23 of the Public Procurement Law, a lecturer will be required to submit a declaration on belonging to or not belonging to the same capital group. Immediately after opening the offers Zam. will post information on the website regarding: the amount it intends to spend to finance the order, companies and addresses of the contractors who submitted offersat the date and prices included in the offers. lect., within 3 days from the date of posting on the website of the above inf. provides the orderer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 Pzp. Along with submitting the statement, the lecturer can present the doc. or information confirming that connections to another lecture are not prthey will distort competition in the procurement procedure. In the case of persons applying jointly for the order, the declaration is submitted by each of such lectures. In the case of the offer jointly applying for the award (consortium), EAT submits each of the Orders jointly applying for the order. These documents confirm compliance with the conditions for participation in the proceedingsand no grounds for exclusion to the extent that each of the lectures shows compliance with the conditions for participation in the proceedings and the lack of grounds for exclusion. The statement of applications jointly applying for the order placed on the EAT form should be submitted together with the offer and should take the form of a doc. electronic, signed with a qualified electronic signature by each of them inthe extent to which they confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion. may entrust the implementation of elements (parts) of the order to subcontractors. In the case of the intention to perform the subject of the contract with the participation of subcontractors, Wyk is obliged to indicate in his offer parts of the orders (material ranges), which he intends to entrust the executionsubcontractors and providing subcontractors by Wyk. Such an indication should be included in the Offer. In the absence of an indication of subcontract in the Offer, the Contract will be able to enter the subcontractor only on the terms specified in the contract. The Ordering Party does not specify the requirements referred to in art. 29 para. 4 Pzp The ordering party does not reserve the execution of key parts of the order by lect. Internet address (URL): http://kedzierzyn.katowice.lasy.gov.pl
The bid deadline for Contract notice: Construction work was 16 Apr 2019. Bidding is closed.
This tender has been issued by PA?STWOWE GOSPODARSTWO LE?NE LASY PA?STWOWE, NADLE?NICTWO K?DZIERZYN in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45200000 - Works for complete or part construction and civil engineering work, 45110000 - Building demolition and wrecking work and earthmoving work, 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45111000 - Demolition, site preparation and clearance work, 45233000 - Construction, foundation and surface works for highways, roads, 45111200 - Site preparation and clearance work, 45233226 - Access road construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31502377. The purchaser document reference is 116454-2019.