Contract notice: Construction work Tender in Poland - 31307950
Tender notice from Poland, published on 06 Mar 2019.
Executive Summary
The PRZEDSI?BIORSTWO WODOCI?GÓW I KANALIZACJI W CZECHOWICACH-DZIEDZICACH SP. Z O.O. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 06 Mar 2019 and is scheduled to close on 09 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31307950, while the tender notice number is 106410-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Utilities entity Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45200000, 45230000, 45231300, 45232000, 71221000, 71320000, 45000000, 45200000, 45230000, 45231300, 45232000, 71221000, 71320000 CPV Description: Construction work. Works for complete or part construction and civil engineering work. Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork. Construction work for water and sewage pipelines. Ancillary works for pipelines and cables. Architectural services for buildings. Engineering design services. Kontrakt III Modernizacja sieci wodin the area of Czechowice-Dziedzice Połnoc Part 2 (subtask 29, 30) Reference Number: 18 / POIS / JRP / 2019 1. The subject of the order is the design and modernization of existing but malfunctioning water supply networks in the northern part of the city of Czechowice-Dziedzice under the Project: Regulation of water and sewage management in the Czechowice-Dziedzice commune stage 2, "Contract III Modewater network deployment in the area of Czechowice Dziedzice Połnoc Part 2 (subtitle 29, 30). "The operator of the water supply network implemented as a result of the project will be Przedsiębiorstwo Wodociągow i Kanalizacji w Czechowicach-Dziedzicach Sp. z oo Main Site: Czechowice-Dziedzice 1. the order is to design and modernize the existing but malfunctioning functionof water supply systems in the northern part of the city of Czechowice-Dziedzice under the Project: Regulation of water and sewage management in the Czechowice-Dziedzice commune stage 2, "Contract III Modernization of the water supply network in the area of Czechowice Dziedzice Połnoc Part 2 (subtitle 29, 30)". waterworks carried out as a result of the project will be Przedsiębiorstwo WoDociągow i Kanalizacji w Czechowicach-Dziedzicach Sp. z o.o. 2. The project: "Regulation of water and sewage management in the Czechowice-Dziedzice commune stage 2" is co-financed from the European Union funds under the Operational Program Infrastructure and Environment in the financial perspective 2014-2020, Measure 2.3 "Water and wastewater management in agglomerations". 3 . This contract is planned protake part in one part (Part 2, Subtasks 29, 30). 4. Part 2, indicatively consists in: - Designing and execution of the water supply network throughout the area covered by the Concept - in accordance with the Annex contained in Volume III of the Terms of Reference. The modernized water supply network will include water supply network pipes and necessary wire sections resulting from the need to switch existing onesconnections in the area covered by the Concept and ensuring the delivery of water to existing recipients together with the necessary water supply fittings and water supply devices (eg sluices, hydrants, venting and aerating valves, etc.). In addition, the scope includes the design and construction of measuring chambers without equipment (2 pieces). Estimated based on the length concept presentedwater pipes from PE SDR 11 pipes 40 and 315 mm is about 3.4 km (according to PFU points 1.1.1 and 1.4.3) along with the restoration of the area after the construction works to its original state. 5. As part of the order, the Contractor will be obliged to perform author's supervision over the investment performed on the basis of the design documentation. 6. The detailed description of the item is presentedy was in Volume III SIWZ Description of the Subject of the Order (OPZ). Ordering party: Przedsiębiorstwo Wodociągow i Kanalizacji w Czechowicach Dziedzice Społka z o.o. with headquarters in Czechowice-Dziedzice (43-502), ul. Legionow 85, POLAND, which will conclude a contract with the Contractor selected in this procedure and which will be the payer of the remuneration due to the Contractor for the performance of the contractrtej as a result of the present proceedings. Beneficiary: Przedsiębiorstwo Inżynierii Miejskiej Sp. z o.o. with headquarters in Czechowice-Dziedzice (43-502), ul. Szarych Szeregow 2, POLAND, acting as the plenipotentiary of the Employer who, on behalf of Przedsiębiorstwo Wodociągow i Kanalizacji in Czechowice-Dziedzice Społka z o.o., carries out this procedure from the moment of its announcement toon the day of signing the contract (website address www.pim.czechowice-dziedzice.pl). 1. In the present proceedings, communication between the plenipotentiary of the Ordering Party - PIM Sp. z o.o. and the Contractors will be held using the miniPortal https://miniportal.uzp.gov.pl/, ePUAP https://epuap.gov.pl/wps/portal - in the scope of submitting, changing or withdrawing the offer and electronic mail - in the remaining withaccreditation, in accordance with IDW. The Contracting Authority informs that pursuant to art. 24aa Pzp will first evaluate the offers, and then examine whether the contractor, whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings. According to art. 22 section 1 of the PPL, the contractors may apply for the award of the contract, who: 1) are not subject to exclusion; 2) meet the conditionsand participation in the proceedings referred to in point 9.3. IDW. 2. The contractor is excluded from the contract award procedure for any of the circumstances referred to in Article 24 sec. 1 point 12-23 of the PPL - excluding the premises specified in art. 24 sec. 1 point 13 lit. d) and point 14 of the PPL regarding the crime referred to in art. 24 sec. 1 point 13 (a) d) Pzp. Ordering youkeys also to the Contractor based on art. 24 sec. 5 PzP. 3. The Contractor is obliged to attach to the offer a statement valid as of the day of submitting bids constituting preliminary confirmation that the Contractor: a) is not subject to exclusion; b) meets the conditions for participation in the proceedings. 4. The statement referred to in point 3 The Contractor is obliged to submit in the form of a Uniform Document prepared in accordance witha standard form specified in the European Commission Implementing Regulation issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU in electronic form, hereinafter referred to as "EAT." When completing the EAT, it should be limited to the general statement regarding all eligibility criteria by completing the α section in Part IV and not completing any of the other sections in partPart IV IV. 5. Contractor within 3 days of placing (in accordance with the principles set out in point 10.3 of the IDW) on the website of the information referred to in Article 86 par. 5 of PPA, it submits to the Ordering Party a declaration on belonging to or lack of belonging to the same capital group referred to in art. 24 sec. 1 point 23) PPL. The declaration is submitted by each of the Contractors who submitted the offerthis (also applies to Contractors appearing jointly) prepared in accordance with the formula included in Appendix No. 3 to IDW. Along with the submission of the statement, the Contractor may provide evidence that links with another contractor do not lead to distortion of competition in the procurement procedure, 6. The ordering party, before granting the order, will call the Contractor whose offer has been assessed the highest, to submit within the prescribed, not shorter than 10 days, the current date as of the day of submitting statements or documents confirming the circumstances referred to in art. 25 para. 1 Pzp. 7. Contractor who refers to the resources of other entities, in order to demonstrate the lack of grounds for exclusion and compliance with them, to the extent in which he relies on their resources, the condition of participation in postingalso submits (along with the offer) to EED regarding each of these entities and a written commitment of these entities to place the Contractor at the disposal of the necessary resources for the performance of the Order. The Contractor who intends to entrust the execution of a part of the orders to subcontractors by submitting the EAT is obliged to complete Part II section D and indicate the parts of the orders, the execution of whichto entrust subcontractors with subcontractors and provide subcontractors if known. 9. The Employer demands from the Contractor, which relies on the abilities or situation of other entities on the terms specified in art. 22a Pzp, submission at the request of the Employer, in relation to these entities of documents listed in item 10.7.2) items 1-9) IDW. 1. If the Contractor has a registered office or place of residence, itemand the territory of the Republic of Poland, instead of the documents listed in point 10.7.2) IDW: 1) point 1) submit information from the relevant register or, in the absence of such register, another equivalent document issued by the competent judicial or administrative body of the country where the contractor has the seat or place of residence or place of residence has a person who concerns information or tothe document, to the extent specified in art. 24 sec. 1 items 13, 14 and 21 - excluding the premises specified in art. 24 sec. 1 point 13 lit. d) and point 14 of the PPL regarding the crime referred to in art. 24 sec. 1 point 13 lit. d) Pzp and par. 5 points 5 and 6 Pzp; 2) point 2 4) submit a document or documents issued in the country in which the contractor has its registered office or place of residence, confirming respectively thate: a) he is not in arrears with paying taxes, fees, social security or health insurance contributions or that he has entered into an agreement with the competent authority regarding repayment of such receivables with possible interest or fines, in particular he obtained the legally required exemption, postponement or payment in installments overdue payments or suspension in full of the decision of the competent authority, b) nits liquidation was not opened or bankruptcy was declared. Documents referred to in point 10.8 para. 1 and par. 2 lit. b IDW, should be issued no earlier than 6 months before the deadline for submission of tenders. The document referred to in point 10.8 para. 2 lit. and IDW, should be issued not earlier than 3 months before the deadline expires. 3. If in the country in which the contractor is sittingthe person concerned is located or has his place of residence or place of residence, documents referred to in point 10.8 IDW, it is replaced by a document containing the statement of the contractor, indicating the person or persons authorized to represent it, or a statement of the person to whom the document was to be applied, submitted to a notary or before a judicial authority, adthe ministerial or professional self-government or economic authority competent for the seat or place of residence of the contractor or place of residence of that person. The provision of point 10.9 is applicable. 4. Contractor established in the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Poland, who is subject to the document indicatedin point 10.7. paragraph. 2) point 1) IDW, shall submit information from the relevant register or, in the absence of such register, another equivalent document issued by the competent judicial or administrative body of the country in which the Contractor has its registered office or place of residence is the person concerned or document, to the extent specified in art. 24 sec. 1 point 13, 14 and 21 - exclthe conditions set out in Article 24 sec. 1 point 13 lit. d) and point 14 of the PPL regarding the crime referred to in art. 24 sec. 1 point 13 lit. d) Pzp - and para. 5 points 5 and 6 Pzp. If the country in which the person has the place where the document was to reside is located, no such documents are issued, it is replaced by a document containing a statement made by that person before a notary or by a notaryd a judicial, administrative or professional body competent for the place of residence of that person. The provision of point 10.9, the first sentence applies. 5. In case of doubts as to the content of the document submitted by the Contractor, the contracting authority may contact the competent authorities of the country in which the person concerned is residing, for whom the document isnecessary information about this document. Contractors who are in an economic and financial situation ensuring performance of the Order can apply for the order, ie they have financial resources or creditworthiness - in an amount not less than PLN 300, 000; the Contractor's request is submitted by the Contractor to confirm the absence of grounds for exclusion: 1)information from the National Criminal Register in the scope specified in art. 24 sec. 1 pts 13, 14 and 21 Pzp - excluding the premises specified in art. 24 sec. 1 point 13 lit. d) and point 14 of the PPL regarding the crime referred to in art. 24 sec. 1 point 13 lit. d) Pzp - and, regarding a conviction for a prison sentence, to the extent specified by the ordering party under art. 24 sec. 5 points 5 and 6 Pzp, ofset no earlier than 6 months before the deadline for submission of tenders or requests to participate in the proceedings; - 2) a certificate from the competent head of the tax office confirming that the contractor is not in arrears with the payment of taxes, issued not earlier than 3 months before the deadline for submission of tenders, or other document confirming that the contractor has contractedplace with the competent tax authority repayment of such receivables along with any interest or fines, in particular obtained legally permissible, postponement or payment of overdue installments or suspension in full of the decision of the competent authority; - 3) certification of the relevant organizational unit of the Insurance Institution Social or other documconfirming that the contractor is not in arrears with payment of social security or health insurance contributions, issued no earlier than 3 months before the deadline for submission of bids, or other document confirming that the contractor has concluded an agreement with the competent authority regarding repayment of such claims with possible interest or fines, in particular, he obtained the prescribed rightsthe release, postponement or spreading of overdue payments into installments or suspension of the execution of the decision of the competent authority in full; 4) excerpt from the relevant register or central records and business information, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion pursuant to art. 24 sec. 5 point 1) Pzp; 5) declarationthe contractor for failure to issue a final court judgment or final administrative decision on default of taxes, fees or social security or health insurance premiums, or in the event of a verdict or decision confirming the payment of such claims together with any interest or fines or conclusion binding agreementon repayment of these debts; 6) the contractor's statement about the lack of a ruling against him as a precautionary measure prohibiting applying for public orders; - 7) the contractor's statement about the lack of a final conviction of a conviction court for a restriction of liberty or a fine to the extent specified by the awarding entity on the basis of art. 24 sec. 5 points 5 and 6 Pzp; 8) decreethe contractor's failure to issue a final administrative decision against him in breach of obligations under labor law, environmental law or social security provisions in the scope determined by the contracting authority pursuant to Article 24 sec. 5 point 7 Pzp; 9) the contractor's statement on not paying taxes and local fees, referred to in the Act ofon 12.1.1991 on local taxes and charges (Journal of Laws of 2016, item 716). Requirements referred to in art. 29 para. 3a of the PPL are specified in Volume II of the Terms of Reference for the Contract. The Contractor remains bound by the submitted offer for 60 days. The period of being bound by the offer starts as soon as the deadline for submission of tenders expires Internet address (URL): www.pim.czechowice-dziedzice.pl
The bid deadline for Contract notice: Construction work was 09 Apr 2019. Bidding is closed.
This tender has been issued by PRZEDSI?BIORSTWO WODOCI?GÓW I KANALIZACJI W CZECHOWICACH-DZIEDZICACH SP. Z O.O. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45200000 - Works for complete or part construction and civil engineering work, 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45231300 - Construction work for water and sewage pipelines, 45232000 - Ancillary works for pipelines and cables, 71221000 - Architectural services for buildings, 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31307950. The purchaser document reference is 106410-2019.