Expired Tender Bulgaria ICB TOT Ref. 31158828

Contract notice: Construction work Tender in Bulgaria - 31158828

Tender notice from Bulgaria, published on 01 Mar 2019.

Executive Summary

The ?????? ??????? has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 01 Mar 2019 and is scheduled to close on 11 Apr 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31158828, while the tender notice number is 096836-2019 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
31158828
Document Ref. No.
096836-2019
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
01 Mar 2019
Bid deadline
11 Apr 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45231300, 45231110, 45000000, 45231300, 45231110
CPV Description: Construction work for the water and sewerage pipelines
Pipelaying construction work.
"Reconstruction of the sewerage and plumbing networks of Plovdiv, Stage 1, neighborhood (part) 2, 3 and" Dunav "- Brezovsko shose "The public procurement has the following subject:" Reconstruction of the sewerage and water supply networks of Plovdiv, Stage 1, quarter (part) 2.3 and "Dunav" Blvd."- Brezovsko shosse:" Main site: Plovdiv - "Dunav" Blvd. - "Brezovsko shose": covers "Dunav" Blvd. from Vasil Aprilov Blvd. to Brezovsko shose Blvd., and "Brezovsko Shose" Blvd. from the Danube Blvd. to the North bypass collector
The types of works are the following:
Machine excavation - 68 244, 00 m;
Manual trench - 3 173, 00 m;
Installation of a fortification system for excavation - 31 424, 80 m;
Installation of a drainage pipeDN 250 / 218-270o - 5 492, 00 m;
Preparation of drainage (foundation from felt) - 3 401, 00 m; Supply and installation of leveling beams - 920, 00 pc;
Installation of GRP pipes for sewer DN2500, resp. DN2000, with rigidity SN 10000 and pressure PN 1 5 242, 00 m;
Installation of PEHD pipes for water supply from DN63 to DN160 2 101, 00 m;
Installation of cast iron pipes DN500 (DI) 1 002, 00 m; from sand 2 047, 00 m;unpolluted ground rock ballast, gravel 2 038, 00 m Construction of inspection shafts according to EN 1916 or the equivalent of 24, 00 E Construction of the street drainage system 40, 00 Rehabilitation of the existing pavement - 19 038, 00 m
Water Drainage 1 370, 00 mm
For lot 1 and 2:
The participant must be entered in the Central Professional Register of the Builder forthird group, second category and be certified according to the Regulations for the procedure for entry and maintenance of the Central Professional Register of the builder, and for foreign persons - in analogous registers according to the legislation of the Member State in which they are established. When submitting the tender, the fulfillment of this requirement is declared in Part IV: "Selection Criteria", (a) "Efficiency" of EEDOP, including the relevant national databases containing the declared circumstances, or the competent authorities designated by the law of the country where the participant is established shall be required to provide information. Documentary evidence - certificate of entry in the CPSA or equivalent document will be presented under conditionsof Art. 67, para. 5 and para. 6 of the Public Procurement Act
For lot 1 and 2:
1. Fill in the relevant information in Part IV, Section "B" of EEDOP. To prove the requirement, evidence of the existence of professional liability insurance, under the conditions of Art. 67, para. 5 and para. 6 of the Public Procurement Act. The information in Part IV, Section B of EEDOP shall be filled in. To prove the requirement, a certifiedpursuant to Art. 62, para. 1, items 1, 3 and 4 and para. 2 of the Public Procurement Act, under the terms of Art. 67, para. 5 and para. 6 of the Public Procurement Act. In the event that direct and free access to the public register in which this information is published, the assignor will not require the submission of the documents. Full access to the procurement documentation is provided on the official website of the Municipality of Plodin www.plovdiv.bg, in Buyer Profile at:
http: //op.plovdiv.bg/ q = page & idd = index & porachkaid = 20190215wLEV7853648, under the terms of Art. 32 of the Public Procurement Act. Electronic documents will be published at the same Internet address in accordance with Art. 42 of the Public Procurement Act. By publishing it, it is assumed that the persons and / or participants concerned are informed of the circumstances reflected in them, unless otherwiseunprecedented in PPL.
2. The assignor shall remove a participant for whom the grounds for removal related to the personal condition under Art. 54, para. 1 and Art. 55 para. 1 of the PPA, which occurred before or during the procedure, as well as under Art. 107 of the Public Procurement Act. Where the participant is a grouping of FL and / or LU, the above grounds for exclusion apply to each member of the grouping. Remedies to removeshall not apply until the expiry of the terms under Art. 57, para. 3 of the Public Procurement Act. When a participant envisages the use of a subcontractor within the meaning of -2, item 34 of the Supplementary Provisions of the Public Procurement Act or refers to the capacity of third parties under Art. 65, para. 1 of the PPA, it should be taken into account that the grounds for elimination apply to subcontractors and third parties as well. According to Art. 67, para. 1 of the Public Procurement Act, upon submission of the tender, participantt declares the lack of grounds for elimination and the compliance with the selection criteria by submitting the EEDOP, and the documents are presented under the conditions of Art. 67, para. 5 and para. 6 of the Public Procurement Act. The companies registered in jurisdictions with preferential tax regime, as well as the persons controlled by such companies within the meaning of Art. 3, item 8 of the Economic Lawand the financial relations with the companies registered in preferential tax jurisdictions, the persons controlled by them and their real owners (the information is to be filled in Part III, Section D of EEDOP.)
4.The persons under Art. 69 of the Law on Counteracting Corruption and Forfeiting the Unlawfully Acquired Property (APCON) -the information is to be found in Part III, Section D of EEDOP. No later than two business days before the date of opening of the bids by a message in the buyer's account, the date, time and place of opening are announced. The financing of this procurement is carried out under Operational Program "Environment 2014-2020", the estimated value for each lot is limiteda.
7. Payments will be made according to the draft contract.
An advance payment is provided at the request of the contractor at the rate of 10% (ten) of the price for carrying out the construction works according to the contract. Payment of the advance shall be made within 30 (thirty) days after the submission of a sum of money, bank guarantee or insurance equal to 100% of the value of the advancewading. Detailed information is contained in the draft contract.
8. The performance guarantee - is presented by the selected contractor before signing the contract and is 4% of the contract value excluding VAT for the respective lot. The warranty is represented in one of the following forms:
1. cash amount; bank guarantee; insurance that ensures performance through coverresponsibility of the contractor. The guarantee in the form of a sum of money or a bank guarantee may be provided on behalf of the contractor on behalf of a third party guarantor. The participant designated as a contractor shall choose the form of the performance guarantee itself. Where the selected contractor is an association which is not a legal entity, each of its members may be a bank guarantee agent, respectively the importer of the amount under the guarantee or the holder of the insurance. The conditions for the detention and release of the guarantee are set out in the draft contract for this order
Internet address (URL): https://www.plovdiv.bg/

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 11 Apr 2019. Bidding is closed.

This tender has been issued by ?????? ??????? in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45231300 - Construction work for water and sewage pipelines, 45231110 - Pipelaying construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 31158828. The purchaser document reference is 096836-2019.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.