Contract notice: Construction work Tender in Bulgaria - 31121658
Tender notice from Bulgaria, published on 28 Feb 2019.
Executive Summary
The ?????? ???????? has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 28 Feb 2019 and is scheduled to close on 02 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31121658, while the tender notice number is 094332-2019 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45233142, 45233252, 45000000, 45233142, 45233252, 45233330 CPV Description: Surface work for streets. Current repair of streets in the villages of Jitnitsa, Bozveliysko, Barzitsa, Hrabrovo, Kiten, Blaskovo, Tutrakantsi, Komarevo and Chayka, Provadia municipality Reference Number: 2019 - OP - 8 The scope of the contract includes the following types of construction works: Main Site: Jitnitsa village, Provadia municipality, Varna district.the special position is the implementation of the following types of construction and assembly works: mechanical and manual paving of asphalt pavement with a thickness of 4 cm in compacted condition - 856 sq.m, of which 428 sq.m. machine spraying and 428 sq.m. manual wiping. The above-mentioned construction works will be carried out on the territory of the village of Jitnitsa, municipality of Provadia The quantities mentioned are subject to measurement after completion of the construction works.it is required that the participants be entered in the Central Professional Register of Builders as follows: - For the first lot - the participants shall be entered in the TSPR for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance № 1 of 30.07.2003 on the Nomenclature of Construction Types and Art. 137 of the Device Act, - For the second lot - the participants are entered in the TSPR for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance № 1 of 30.07.2003 on the nomenclature of the types of construction and art. 137 of the Law on the Structure, - For the third lot - the participants shall be entered in the TSPR for execution of constructions with the followingHolding: construction activities by object Second group, minimum third category, according to Ordinance № 1 of 30.7.2003 on the nomenclature of types of construction and art. 137 of the Construction Act, - For the fourth lot - the participants shall be entered in the TSPR for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance No. 1 of 30.7.2003 for the Nomenclature of Construction Types and Art. 137 of the Construction Act, - For the fifth lot - the participants shall be entered in the TSF for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance № 1 of 30.07.2003 on the nomenclature of types of construction and art. 137 of the Device Act, - For the Sixth Independentposition - the participants are registered in the CPSA for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance № 1 of 30.7.2003 on the nomenclature of types of construction and art. 137 of the Construction Act, - For the Seventh Lot - the participants shall be entered in the TSPR for execution of constructions with the following scope: construction activitiesby group of objects Second group, minimum third category, according to Ordinance № 1 of 30.7.2003 on the nomenclature of types of construction and art. 137 of the Act on the Structure, - For the Eighth Lot - the participants shall be entered in the TSPR for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance № 1 of 30.7.2003 on nomenclatureof the types of construction and art. 137 of the Construction Act, - for the Ninth place - the participants are registered with the TSF for execution of constructions with the following scope: construction activities by objects Second group, minimum third category, according to Ordinance № 1 of 30.07.2003 on the nomenclature of types of construction and art. 137 of the Device Act. 60 of the Public Procurement Actforeign participants may prove their registration in analogous registers under the law of the Member State in which they are established .. In the case of a grouping which is not a legal person, the requirement to register is evidenced by each participant in the grouping according to the distribution of the participation of the persons in the implementation of the activities, beforeSee sub-contractors for subcontracting, which must meet the above requirement, depending on the type and the share of the contract they will perform The participants declare their compliance with the selection criterion in EEDOP. each assignment. The Contracting Authority requires participants to have a valid insurance policy"Professional Responsibility" with coverage corresponding to the volume and character of the contract, namely in the construction within the meaning of Article 137 of the TDA for construction of third category (for first, second, third, fourth, fifth, sixth, seventh, eighth and ninth In the case of a grouping which is not a legal entity, compliance with the selection criterion shall be demonstrated by each participant in the pool, whichit will carry out construction, according to the distribution of the participation of the persons in the performance of the activities provided for in the contract for the formation of the grouping .. In the case of subcontracting, they shall meet the above requirement according to the type and the share of the order they will execute. foreign participants - have professional liability insurance for construction or dan arrangement in another Member State of the European Union or a party to the Agreement on the European Economic Area with a threshold not less than the minimum insurance sums for construction for the respective building category The participants declare their compliance with the selection criterion in EEDOP. . For each individual lot, the participants present the following documents for participationin the procedure: 1. Application form involving 1.1. EEDOP 1.2. Documents to demonstrate the reliability measures taken (if necessary); 1.3. For participants - unions that are not Jur. a copy of a document showing the grounds for the unification, as well as the rights and obligations of the members of the grouping, including the designated partnerrepresents the unification for the purposes of this general. order; the division of responsibility between the members of the grouping; a clause of joint and several liability of the members of the consortium for the performance of the public procurement contract and the activities to be performed by each member of the grouping. The offer contains: 2.1. Authorization document when the bidder is not a lawyerthe representative of the participant; Proposal for the execution of the order in accordance with the tech. specification and requirements of the Contracting Authority and attached to it a program for the organization and execution of the contract (obligatory provided in electronic format in the format "* .doc") and a Linear schedule for the implementation of the envisaged activities on the respective lot. kvalue account and analyzes of the unit prices by the respective volume. position. A participant shall be removed from participation in the procedure, in which the circumstances under Art. 54, para. 1 and under Art. 55, para. 1, item 1 of the Public Procurement Act. The Contracting Authority will remove from participation in the procedure and: - Participants - related parties within the meaning of - 2, item 45 of the PP of the Public Procurement Act, - a participant who has offered a price for execution ofthe lever is higher than the progression specified by the Assignor. value of the order, - a participant who submitted Tech. a proposal that does not meet the requirements of Tech. specification and terms of the contract, - a participant for whom the circumstances under Art. 3, item 8 in connection with Art. 4 and Art. 5, para. 1, item 3 of ЗИФОДРУПДРКЛТС, - a participant who, following a call from the Contracting Authority and in the appointed by himthe term does not extend the validity of the offer. III. According to Art. 67, para. 1 of the PPL when submitting the tender, the participant declares lack of grounds for removal from the procedure and compliance with the selection criteria by submitting EEDOP. Documents demonstrating the information specified in EEDOP may be required additionally under the conditions of Art. 67, para. 5 and para. 6 of the Public Procurement Act. According to Art. 67, para. 6 of the Public Procurement Act, prior to the award of a public procurement contract, the participant designated as a contractor shall present up-to-date documents certifying the lack of grounds for removal from the procedure and compliance with the selection criteria. Documents are also submitted to subcontractors and third parties, if any. IV. Participants can get information abouttax and social security obligations, compliance with environmental protection measures, protection of employment and working conditions in force in the country by the NRA, MoEW, Employment Agency and the General Labor Inspectorate. In preparing their bid, participants should comply with the following maximum limits for the formation of an economist. Indicators: - Hourly rate - up to 4.50 BGN / h, - Suppl. Expenditures on FAO - up to 100% - Extra. Expenditure on machinery - up to 40% - Delivery and warehousing costs for materials - up to 8% - Profit - up to 8% Internet address (URL): www.provadia.bg
The bid deadline for Contract notice: Construction work was 02 Apr 2019. Bidding is closed.
This tender has been issued by ?????? ???????? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45233142 - Road-repair works, 45233252 - Surface work for streets, 45233330 - Foundation work for streets.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31121658. The purchaser document reference is 094332-2019.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.