„?????????? ???????? ???????????? ????“ ??? has floated a tender for Contract notice: Construction work. The project location is Bulgaria and the tender is closing on 03 Apr 2019. The tender notice number is 075879-2019, while the TOT Ref Number is 30784568. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Bulgaria

Summary : Contract notice: Construction work

Deadline : 03 Apr 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 30784568

Document Ref. No. : 075879-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : „?????????? ???????? ???????????? ????“ ???
Office Name: „?????????? ???????? ???????????? ????“ ???
Address: ??. ????? ?????? ? 1, ???? 4
Town: Sofia
Postal Code: 1000
Contact Point: ???. ????????? ??????

Phone: +359 28902902
Fax: +359 29871684
Bulgaria
Email :office@nciz.bg
URL :http://nciz.bg/

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45233252, 45233161, 71320000, 45000000, 45233252, 45233161, 71320000
CPV Description: Construction Engineering - Design, Authorization Supervision and Construction Works for Implementation of Infrastructure for Sites of "National Company Industrial Zone" EAD "

1. The contract involves the conclusion of a framework agreement with three (3) potential contractors to carry out construction work on sites, The activity will be expressed mainly in the following works: Geodesic, Patna, Permanent Traffic Organization, WADD, and other projects, PB, "Electrical", "Street Lighting", TC, "Water Supply", "Drainage", "Gas Pipeline", PZP, PPSO, Author's Supervision and Building- building an accessible infrastructure environment (technical and road).

Main Site: Sofia, Bozhurishte, Karlovo, Kardzhali, Suvorovo, Telish

1. The scope and volume of individual contracts awarded on the basis of the framework agreement will depend on the particular need of the contracting entity and on the requirements of the regulatory framework within the framework of the framework agreement.the underground network to be built is 2100 m:

- for Sofia - 600 m;

- for Bojurishte - 13 000 m,

- for Suvorovo - 3 400 m,

- for Kardzhali - 1200 m,

- for Karlovo - 2 300 m,

- for Telish - 2 200 m

2. For each specific implementation contract to be concluded under the agreement, the contracting entity will conduct an internal competitive choice, specifying the place of performance, the volumeof the work and the maximum execution time in the written invitation to the contractors to submit a tender. For each separate assignment, the assignor will assign according to the financial resources available to him at that time

Note: If the procedure reveals that there are not enough potential contractors meeting the selection criteria and / ora staggering number of bids meeting the pre-announced conditions, the contracting entity will only enter into a framework agreement with the participants who meet the selection criteria and whose bids meet the pre-announced conditions, although the number of rated participants will be less than three. The participant in the procedure is required to have a registration in the Central Professional RegisterBuilder's Builder (CPSR) to the Bulgarian Construction Chamber in accordance with Art. 3, para. 2 of the Construction Chamber Act for execution of constructions from the second group of constructions from first to third category, third group of constructions from second to fifth category; fourth group of constructions from third to fourth category, and for non-residents - in analogous registers under thethe Member State in which they are established. If the participant is a grouping that is not a legal entity, compliance with the selection criterion shall be demonstrated by each of the persons included in it who will carry out the relevant activity according to the distribution of the participation of the persons in the performance of the activities provided in the contract document creating a reunion.

When the participant provides for the participation ofsubcontractors, the compliance with the selection criterion is also proved by them according to the type and the share of the order they will execute and for them there should be no grounds for disqualification.

When submitting a tender, the information on the requirement is indicated by the participant EEDOP in accordance with the instructions for its completion. 67, para. 5 of the PPA, the contracting authority may requireof the participants at any time to submit all or part of the documents proving the information specified in EEDOP when this is necessary for the lawful conduct of the procedure. For foreign persons - an analogous document proving such registration in a similar register, according to the legislation of the Member State in which they are established, or equivalent.and a contract for performance of the contract, the contractor shall submit a copy of the registration document to the TSPR to the Chamber of Builders of the Republic of BULGARIA pursuant to Art. 3, para. 2 of the CPA for the execution of constructions from the second group of constructions from the first to the third category, third group of constructions, from the second to the fifth category; fourth group of constructions from third to fourth category, if the document is not presented po the order of art. 67, para. 5 of the Public Procurement Act. A document shall be presented to a foreign person proving that he has the right to perform the assigned activity in the Republic of Bulgaria, including the fact that he has carried out the respective registration pursuant to the Chamber of Builders Act in connection with Art. 112, para. 1, item 4 of the Public Procurement Act. The participant must have valid professional liability insurance of the participantsconstruction and design under Art. 171 of the TDA, covering the minimum insurance sum for the respective construction category, as follows: first category according to the Ordinance on the terms and conditions for compulsory insurance in the design and construction, or a corresponding valid equivalent document. The participant declares compliance with the requirement set out in Part IV "Selection Criteria", B "Economic and financial condition ", item 5 of EEDOP Proof of conformity shall be established by the procedure of Article 67, Paragraphs 5 and 6 of the Public Procurement Act, including upon conclusion of a contract, with a copy of an insurance policy for insurance" Professional responsibility "and / or by reference to a public register. The participant must have achieved a minimum turnover in the scope of the contract, calculatedon an annual basis.

"Turnover within the scope of the contract" means an amount equal to the part of the net sales revenue realized from activities falling within the scope of the public procurement (- 2, item 67 of the Public Procurement Act). The participant declares compliance with the requirement set out in Part IV "Selection Criteria", b. B "Economic and Financial Condition", item 2a) of EEDOP"Scope" means activities for the preparation of investment projects in a phase of technical or work design and implementation of the construction of roads - new construction and / or reconstruction and / or rehabilitation and / or modernization of streets and / or road facilities to them or construction of roads - new construction and / or reconstruction, and / or rehabilitation and / or modernization ofand / or road facilities to them. 67, para. 5 of the PPA, the contracting authority may require the participants at any time to submit all or part of the documents proving the information specified in the EEDOP when necessary for the lawful conduct of the procedure

In these cases, as well as at the conclusion of Contract for performance of the order Compliance with a requirementproof is demonstrated by the representation of:

1. bank certificates; or

2. annual financial statements or parts thereof when required to be published; and

3. reference for the total turnover and the turnover in the sphere falling within the scope of the contract (in free text)

When, for a good reason, a participant is unable to provide the documents requested by the contracting authority, he can prove hiseconomic and financial situation with the help of any other document that the Assignor deems appropriate.

Proceeds from Section III.1.3), Item 3 "Technical and Professional Opportunities, Minimum Requirements":

B.8 Designer under Part B with full designer qualification under LLLPI or equivalent under the national legislation or legislation of a Member State of the European Union, or of another State party to the Agreement on the European Economic Area: experience: participation in a team involved in carrying out fire safety activities in at least 1 manufactured techn. or employee. project for new building construction. and / or rehabilitation and / or rehabilitation, and / or major overhaul of motorways and / or Roads and / or Roads and / or Roads and / or RoadsСъборя. to them, and / or to roads with an equivalent. har- chies outside the country; Designer of the Gas Supply part of a full project, a legal person under the Law on Energy Efficiency or an equivalent in accordance with the law or the law of an EU Member State or another country under an EEA Agreement. of the construction works: part of "Road" - 1 pc: Prof. area (qualification): Higher education by special TC or PS, or equivalent; specific. opit: participation in a team involved in carrying out activities on the part "Road" in min. 1 completed building for new construction and / or reconstruction, and / or rehabilitation and / or repair of motorways and / or roads of the WFD and / or of streets and / or of roads and / or of road transport to and / or of roads with equivalent harnesses outside the country .. C.2. ": Prof. area (quadrature): yousessions of SSS or PGS, or TC or PC, or "Build. Transp. or "Railway Build." or equivalent; specific. experience: participation in a team related to of construction activities in a minimum of 1 site for new construction and / or reconstruction and / or rehabilitation and / or repair of motorways and / or Roads and / or streets, and / or on TEN roads and / or on roadwayshang on. to them, and / or to roads with equivalent maps outside the country.

B.3. Quality Control Engineer - 1 pc .: Prof. area (quadrature): construction engineer and / or engineer or equivalent, specific experience: participation in a team related to quality control and acceptance of the building works in at least 1 completed building for new construction and / or reconstruction, and / or rehabilitation and / or major overhaulmotorways and / or Roads and / or Roads and / or Roads and / or Roads. to them, and / or to roads with equivalent harnesses outside the country. Health and Safety Coordinator (BFA) - 1 pc .: Prof. area (quadrature): Professional qualification related to construction, with completed BAE course or equivalent; specific. experience: participation in a team involved in carrying out safety activities and hDraw a minimum of 1 (one) completed building for a new building. and / or rehabilitation and / or rehabilitation, and / or major overhaul of motorways and / or Roads and / or Roads and / or Roads and / or Roads. to them, and / or to roads with equiv. har- chies outside the country.

4. The participant should have tools, facilities and technicians. equipment required to make the order, no lessfrom:

- combined excavator - 2,

- loader - 2,

- grader - 1,

- roller earthworks - 2,

- road milling machine - minimum width 1 m - 1 - - - - - - - - - - - - - - - - - - - - - - 2 -,

- on-board truck - 1 pc.

1. The circumstances under Art. 54, para. 1, Art. 55, para. 1, item 1, item 3, items 4 and 5 and Art. 107, item 4 of the Public Procurement Act and under Art. 3, item 8 and Art. 4 of the ЗИФОДРУПДРКЛТДС, Art. 13, para. 1 of CTA and Art. 69 of the ARPOPS are declared in EEDOP.

2. Nod. will remove from the trial. each participant allowed an arithmetic. error (inaccuracy) in your pricing offer. and / or in the KCS, as well as in case of misconduct. in the general building site of the project. in cent. Prel. and KCS. All. samples attached to the document. for general p-ka are obligatory. for yprivate, as an assortment. will remove from participation in a trial. a participant who changes or does not fill out the samples in with specified. at node


Internet address (URL): http://nciz.bg/

Documents

 Tender Notice