Expired Tender Hungary ICB TOT Ref. 29936631

Contract notice: Construction work Tender in Hungary - 29936631

Tender notice from Hungary, published on 18 Jan 2019.

Executive Summary

The SBTC SPORT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 18 Jan 2019 and is scheduled to close on 04 Mar 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29936631, while the tender notice number is 025464-2019 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
29936631
Document Ref. No.
025464-2019
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
18 Jan 2019
Bid deadline
04 Mar 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45000000
CPV Description: Construction work.
Tostrandi Sports Center Reconstruct. - plan. and reference
Reference number: EKR001143612018
Tostrandi Sports Center Reconstruction - design and construction . Main Quantities:The main stage foeld level 1 floor design. The epitated, epithelial, electrostatic, uterine, gardening, and horticultural works are included.and the song is received by the women from the appropriate localities. On the two longitudinal sides, the structure of the lelato is located in a moegoet, with the locals of the football palace (oeltoers, washrooms, and koezoessegi squares and offices), which were placed on a four-tiered elephant ridge on the delft side. The football palya can be found on the western side of the nezer, which can be accessed by the gates and the gates. money
The planned epuel is a full frame structure with pre-assembled and monolithic reinforced concrete elements. the roof structure is made up of cantilevered steel beams. The 'Z' is a superconducting task (toebbek koezoett), the plentiful quantities are contained in the unearthed coel: Bontas works on a 10, 000 m teruetile MLSZ infrastructure standard fueves ballarugo centerpalya (105x68 m (7140 m) epitian, epithelium, palyat, palyak koeruel balloon with halo, sporting goods and potted place Palladium, epithelium on 4 columns with 165 sheep body Kuelteri villagitas and transformerallit epitsa Palya reservoir sketches 22 pcs 2000 m at Koezműepitesi munka oesszesen on 2585 ramps Embedded and mobile furniture 220 pcs Pellet assemblies 2, 500
- Parkolo epithelium: 166 carriages and 2 bus trucks
- Stadium roofing roof cover 4790 m, where the applied acel console support structure: 14.7 m task steel construction and assembly of the stadium roof implementation)
Customer roegziti that the signn is a prime mover for the organizer of NB II level junctions, and accordingly the receivers must be compliant with the MLSZ infrastructure standard, according to which they must be "D" category.
It is not possible to have a timer, a subordinate and notyou can take the right handful of a farmer against whom Kbt. Article 62 (1) to (2) excludes any of the grounds for exclusion. "The economic operators involved in the construction of industrial buildings, Kbt. Section 65 para. in the construction industry of the construction industry according to the noticesor, in the case of non-Hungarian economic operators established in the country of the contractor, if the author is a full-fledged performer, is a resident of the country of residence, or with a license, legal grandfather or organizational, chamber tagag in the country of establishment. : Timers (koezoes all ATs) and the host company that retains the appropriate passport in the newsletter 321/2015. (X. 30.) Government Decree (hereinafter referred to as KR) Section 1 para. (Section 4-7) in the EDF system (424/2017. (XII: 19.) Government Decree, hereinafter referred to as the EKRR), the European Coalition Procurement Document (EECD) is presented in advance.that there is no Kbt. Article 62 (1) and (2), Exclusion of Exclusion of Exclusions in Submissions The declarations to be made in the EDF for the submission of an electronic form shall be filed by the representative of the Kezoes ATK and organizations duly authorized in the original. times. it does.
The Kbt. Based on Section 67 para. (4), AT must declare that he does not fulfill the contractor's performancem takes a great deal of Kbt. Section 62 (1) and (2) of the Act on the Exclusion of Exclusion of Subordinate Subordinate. AT (koezoes AT) established in Hungary, according to -8 of the CM, certify that Kbt does not belong. Section 62 defines the field of power of exclusions. AK does not search for the admitted AT (s) in the KR III. If the AK is Kbt. Article 69 (11)The GSZ has made them available in the ECD - those databases that are capable of checking the excerpts of the exclusions in the corre- sponding sources of the K AK's letter KR. ----of-keteles certify that there is no Kbt. Article 62 states the reasons whytalya area. In case of case AK, the authentication certificates are certified by the MA VI. are entitled to check in accordance with the Chapters. The applicable standards, the use of EEKD, and the reasons for using the modalities are set out in paragraphs 1-16 of the CR. - -. They apply at the level of the relevant rules of the EDF Regulation. Let's draw attention to Kbt. And Article 67 para. (3).appropriately the master of the real master. times. in the newsletter in the EDF system, the unified european coexistence document is presented in the IV. The alpha alpha points out in advance that it meets the requirements of the appropriate AEs. Declarations to be made in the EDF by submitting an electronic form are provided by koezoes journalists as well as by appropriate proofs.The host organizations in the company represent the owner of the event. Subsequent documents include the AK only Kbt. Article 69 (4) - (5) of the Code of Civil Procedure:
P1) In Section 321/2015. (X.30.) Governmental Order. Section 19 para. (1) (a) on all pennants of circulation, the statement from the penzuegyi intezmeny (s) - attol fuege, howhen the timer dropped off or when he started to act, if these data are available - with the lower content: ● the timer of the update, which has samlasmas ● the pennant sampled in the 24-month period returned by the previous task allegations. Hopefully in line with allitas during the 2009 LXV. ToerArticle 25 (2). The Kbt. According to Section 65 para. (6), koezoes journalists may meet the requirements of the appropriate candidates. Those weave who can uniquely relate to one another to the host actors, the sufficiency of the unicorn suffices in the artefact, if the koesuelles are one matching the P1).321/2015. (X.30.) Governmental Order. - 19 (1) (c) based on the statement of the timekeeper of the full report of the theatrical statement preceding the start of the task.
P3) A 321/2015. (X.30.) Governmental Order. Article 19 (1) (c) based on the statement by the subscriber according to the pre-emptive task of the first theses of the pre-theses procurement (high-heels)
III.1.3) Minimum qualifying requirements continued:
M4.2) min. 1 person, from 266/2013. MV-EV Cat. Specialist with FMV entitlement or qualified personally qualified and qualified person with professional experience, min. With 1 major specialist in the 266/2013. (VII.11.) According to Kri) MV-EV Responsible Technical Manager for Qualifying (or Equivalent Entitlement) Acquired as Acquired in Section 266/2013 (VII. 11.) Kr. trams
with Vegzettias and 3 years (36 months) of professional practice, or -villamosmernoek with vegated, and 4 years (48 months) of professional practice.
M4.3) min./ 2013th (VII.11.) Responsible (or equivalent) technician responsible for the category of MV-EG category in accordance with Kr., No. 266/2013 (VII. 11.) Kr. (See section 3) -experienced epithelial contraceptive specialist with 3 years (36 months) of professional practice;epeleetgepesz is a specialist in technical training and 3 years (36 months) of professional practice; D, or higher, at a design stadium for designers at "E" designerst. The MLSZ Infrastructure Code is available on the lower link: http://dokumentumtar.mlsz.hu/02_Szabalyzatok/02_Labdarugas_uzemeltetesi_szabalyzatok/01_Versenyajatesi_szabalyzatok/ISZ/ISZ_2018_1_(20180604).pdf
The above-mentioned experts are not allowed to do kaezoett atfedes.the same expert can not update the performance of two or more eligible candidates
Further information:
1. The Kbt. Article 71 (6) is based on the fact that the subscriber (AT) enters the host entity not previously listed in the schedule with the winner (HP), and the new HP would be bogus with this host player, and no additional HP will order a.
2nd According to the criteriaalso the upper limit of the score in the row: 0 points, where 0 points are the worst, 10 points are the best ones. Regardless of the gold bullion of the reverse, the golden gold and the pearl in the case of professionals, the dotted modesty of the artillery is based on the doctrine. The net timelines should also include the planned jaro counterparts.The design counterparts should be given as soon as possible.
3. The Kbt. Section 35 (8) does not permit the establishment of an organization (project partner).
4th Targyi is a responsible accredited colleague in the field of education: dr. Juharos Robert, (registration: 00312)
5. The statement must include an express statement by AT on the terms of the update, copied by the authortesere and performance and the garden against counterclaim (Kbt. 66 (2)).
6th The AT has to declare the case of his winner at the disposal of the commissioned commissioners for a term of six [Kbt. -134 (5)]. Article 61 parathat the complex complexity of the epite, the tasks performed are unlimited in terms of technical-professional aspects, that is, I do not provide the opportunity to get to the grid. The above-mentioned comes up. to one epuel. Cont. VI.4.3)
Internet address (URL): http://www.sbtc.hu

Documents

Tender Notice
Login to view

Similar tenders

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 04 Mar 2019. Bidding is closed.

This tender has been issued by SBTC SPORT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 29936631. The purchaser document reference is 025464-2019.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.