Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 71315000, 45100000, 45200000, 45400000, 45300000, 45310000, 45332000, 45331000, 45262400, 45000000, 71315000, 45100000, 45200000, 45400000, 45300000, 45310000, 45332000, 45331000, 45262400
CPV Description: Construction work.
Building services.
Site preparation work.
Works for complete or part construction and civil engineering work.
Building completion work.
Building installation work.
Electrical installation work.
Plumbing and drain-laying work.
Heating, ventilation and air-conditioning installation work.
Structural steel erection work.
„Изпълнение на инженеринг (проектиране, СМР и авторски надзор)for site ... continue in Section VI.3) Additional information The subject of the public procurement includes design for internal repairs in the phase "Technical project" for execution of construction and assembly works in the lobby of the Second Corps for separation of 2 premises for management and monitoring traffic parameters, building partition walls, complete replacement of window frames, monopoly construction(three and five wire) electrical installation, laying of cables for the system for control and monitoring of traffic parameters, flooring, wall masonry and painting. It also includes the design, construction and construction of a hot-dip galvanized metal frame on concrete foundations for the installation of sensor elements and systems for measuring traffic parameters on the territory ofThe purpose of the public procurement is the construction of a portal frame above the St. Petersburg Blvd. № 63, in the direction of the St. Petersburg Boulevard, in front of the Second Corps of the Technical University of Sofia, Branch Plovdiv, Plovdiv.
Main Site: Location of the site: 63 St. Petersburg Blvd., Plovdiv PO Box 4017, BULGARIA
The subject of the public procurement includes projectsrepair works in the "Technical project" phase for the construction of a workshop in the foyer of the Second Corps for the separation of 2 premises for control and monitoring of traffic parameters, construction of partition walls, complete replacement of joinery, construction of a single phase (three and five conduction) electrical installation, laying of cables for the system for control and monitoring of traffic parameters, flooringcoatings, painting and painting. It also includes the design, construction and construction of a hot-dip galvanized metal frame on concrete bases for the installation of sensor elements and systems for measuring traffic parameters on the territory of a municipal road, over 6 lanes on St. Petersburg Boulevard, before Second Branch of Plovdiv Branch. Including exercising author's overzor. The investment project will be developed in the following parts: Building Structures; Road; Electro; Geodesy; Fire safety; PUSO; Health and safety plan; Quantity account for all parts, including quantity-value accounts for all parts and total for the project. The purpose of the public procurement is to build a portal frame above the 63 St. Petersburg Blvd., Plovdiv.Various Information and Intelligent Sensor Systems (ESCs) have to be installed to build an Intelligent Transport Systems (ITS) Lab The lab should be able to analyze, measure and certify ESCs from different manufacturers and verify their reliability, accuracy and suitability for operation on the Republican Road Network of BULGARIA.Access to facilities The portal frame should provide access to service facilities without stopping traffic on the boulevard. For this purpose, a pedestrian zone (track-type) with a width of at least 1 meter must be constructed. Next to the gantry frame, a channel-to-pipe connection must be provided to provide three-phase power supply with a minimum power of 30 kW. The contractor must build andchannel-tube connection between the second building of the TU Sofia - Plovdiv Branch and the portal frame for realizing an optical link between them. In order to install sensors in the road, it is necessary to replace the asphalt floor at a distance of 50 meters before the sensors and 25 meters after them. The system for measuring and collecting traffic parameters also provides a center for storing and analyzing the receiveddata. The building is constructed with a monolithic reinforced concrete structure bearing reinforced concrete bases, walls, columns, beams and slabs. The center will be located on floor 0 (L1_C4) and semi-storeys -0.5 (L2.1_C4) and 0.5 (L2.2_C4), where an existing staircase and foyer will be repaired to assume the functions of Data Center and Lab . The one-level room with an area of 50 m is on floor 0 (L1_C4) is provided for a server room and a room with uninterruptible power supplies. For the operation of the center, it is planned to build walls for individual rooms, installation of fire doors, installation of new double floors and ceilings, restoration of flooring for dehumidification, painting of walls, removal of radiator, landsing of windows. For the lab to nthe entrances of semi-stairs -0.5 (L2.1_C4) and 0.5 (L2.2_C4) are divided into 2 spaces with single areas of 40 m. They are provided for work rooms with desks and computers. On the outside of the building is foreseen the construction of a foundation for a diesel aggregate
Term for preparation of the investment project in the phase of a technical project in all parts (including the quantified quantity accounts): minimum 30 and a maximum of 60 calendar days from the date of conclusion of the contract. The period of exercising of author's supervision is from the date of signing of Act No 2 for the opening of a building. site for the completion of the construction. The time limit for execution of all construction works by the contractor with a test act 15 - minimum 40 and a maximum of 100 calendar days
The participant must have a registration in Cthe Central Professional Register of Builders to the Chamber of Builders of the Republic of Bulgaria for the execution of constructions of the construction category, in which the object of the construction contract falls, the second group, the second category according to Art. 137, para. 1, item 2, b. but by the Territorial Planning Act and according to the Regulations for the procedure for entry and maintenance of the Central Professional Register of the Builder and for the foreign persons -• When submitting a tender, participants declare their compliance with the selection criterion by filling in Section A: "Fitness" in Part IV: "Selection Criteria" in the Single European Document for Proposals by the Member State in which they are established or equivalent. (EEDOP).
According to art. 67, para. 5 of the Public Procurement Act, the contracting authority may require the participants from each of themtime to present all or part of the documents proving the information specified in EEDOP when this is necessary for the lawful conduct of the procedure. In these cases, the requirement shall be evidenced by the submission of a copy of the registration document in the CPSR to the Bulgarian Chamber of Builders for the execution of construction works for the second group, the second category according to Art. 137, par. 1, item 2, para. A of the Territorial Planning Act and according to the Rules for the procedure for entry and maintenance of the Central Professional Register of Builders. For foreign persons - a similar document proving such registration in a similar register, according to the legislation of the Member State in which they are established or equivalent - Before the conclusion of a public procurement contract, the contracting authority will require the participantfor the Contractor to provide up-to-date documents proving the fulfillment of the above requirement, namely: a copy of the registration document in the CPSR to the Building Chamber of the Republic of Bulgaria for the execution of construction works for the second group, second category according to Art. 137, para. 1, item 2, b. A of the Territory Management Act. When entering into a contract, the selected contractor - a foreign person presents a document, it is proved that he has the right to carry out the assigned activity in the Republic of BULGARIA, including that he has carried out the respective registration, according to the Law of the Chamber of Builders, in connection with Art. 112, para. 1, item 4 of the Public Procurement Act
In the case of unions which are not legal entities, compliance with the above selection criteria is evidenced by the participating association and not by each of the persons involvedexcept for the relevant registration, presentation of a certificate or other condition necessary for the fulfillment of the contract, according to the requirements of a normative or administrative act and according to the distribution of the participation of the persons in the implementation of the activities provided for in the contract for creating the grouping. Subcontractors must comply with the above selection criteria, according to the type and the share of the order they will perform and for which there are no grounds for removal from the procedure
Participants should have professional liability insurance in construction and design within the meaning of Article 171 of the TDA, for damages caused to other participants in the construction and / or to third parties as a result of unlawful actions or omissions in or onwater performance of their obligations with a threshold not less than the minimum insurance sums for design and construction for the respective construction category (second group, second category) according to the requirements of the Ordinance on the terms and conditions for compulsory insurance in the design and construction. For a participant established / registered outside Bulgaria, professional indemnity insurance, can only be the equivalent of the one under Art. 171 of the TDA, but made under the legislation of the state where the participant is established / registered. The requirement for insurance for professional liability of the persons under Art. 171, para. 1 of the TDA does not apply to a person from a Member State of the European Union or from another State party to the Agreement on the European Economic Area, which isESTABLISHING IN THE TERRITORY OF THE REPUBLIC OF BULGARIA and providing equivalent professional indemnity or guarantee insurance in another Member State of the European Union or in a country to the Agreement on the European Economic Area. 59, para. 6 of the PPA in the case of unions which are not legal entities, the compliance with this requirement is evidenced by the mergerand not by any of the persons included in it, except for the respective registration, presentation of a certificate or other condition necessary for the fulfillment of the order, according to the requirements of a normative or administrative act and according to the distribution of the participation of the persons in the implementation of the activities, provided for in the agreement establishing the grouping. According to Art. 66, para. 2 of the Public Procurement Actthe requirements must comply with the above-mentioned requirement according to the type and the share of the order they will perform and for which there are no grounds for disqualification.
Continuation from Section II.1.1.) ... "Establishment of two premises in the foyer in the Second Corps and commissioning of a road station for a system for measuring and collecting traffic parameters for the needs of TU - SofBranch of Plovdiv "under contract № BG05M2OP001-1.002-0023-С01, Center for Competence" Intelligent Mechatronics, Eco and Energy Saving Systems and Technologies ", funded through the" Science and Education for Smart Growth "Operational Program 2014-2020" Stakeholders can inspect the site, which can be done every working day from 9:00 to 16:00, until the date specifiedthe deadline for the receipt of tenders, upon prior request, at 359 32659551 or e-mail:
[email protected] or fax 028683215, the person responsible for the inspection Prof. Grisha Spasov
The maximum financial resource of the contracting authority for the implementation of the subject of the order is up to BGN 346, 846.67 excluding VAT, distributed as follows:
For activity 1: Preparation of investment project in the technical design phase to• For activity 2: Execution of all construction and assembly activities up to 323 025, 84 BGN without VAT • For activity 3: Exercise of author's supervision during construction up to 6 500, 00 BGN without VAT, with the cost of exercising the author's supervision at an hourly rate indicated by the bidder in the bid.
The participants will be removed if there is anythe remarks under Art. 54, para. 1 of the Public Procurement Act and Art. 107 of the PPA (Article 55 of the PPA does not apply), except for the explicit cases mentioned in the Public Procurement Act. The Contracting Authority shall remove from participation in the procedure and: - participants - related parties within the meaning of par. 2, item 45 of the PP of the Public Procurement Act - a participant who in any way has included somewhere in his offer out of the envelope "Suggested price parameters" items related to the offered(or parts thereof), - a participant who has offered a contract execution price higher than the estimated value of the contract as specified by the contracting authority, as well as prices higher than the maximum values specified in the notice and in the documentation - a participant who has submitted a Technical Proposal that does not meet the requirements of the Technical Specification andthe contractor's interests; - a participant for whom there are the obstacles for participation in public procurement provided under Art. 3, item 8 in the ZUFODRUPTRLTDS, unless they have applied the exemption under Art. 4 of it - a participant for whom the prohibitions under Art. 69, para. 1 and para. 2 of the Law on Counteracting Corruption and for Removal of Illegally Acquired Property - a participant who, in the defined invitation(if applicable) refuses to extend the period of validity of the offer or if it submits a tender with a shorter validity period. 54, para. 1, item 1, 2, 7 of the Public Procurement Act shall apply to the persons referred to in Art. 40 of the RSPC. According to Art. 46 of the PPPPP, the participants are obliged to notify the contracting authority in writing within 3 days from the occurrence of any of the circumstances under Art. 54, para. 1, Art. 101, para. 11 of the Public Procurement Act. According to Art. 67, para. 1 of the PPA when submitting a tender, the participant declares lack of grounds for removal from the procedure and compliance with the selection criteria by presenting the EEDOP. Documents demonstrating the information specified in EEDOP may be required additionally under the conditions of Art. 67, para. 5 and 6 of the PPA. According to Art. 67, para. 6 of the PPL before pthe award of a public procurement contract the designated contractor shall present up-to-date documents certifying the lack of grounds for disqualification from the procedure and compliance with the selection criteria. In the case of an association that is not a law. person applies Art. 59, para. 6 of the PPA. In case of subcontracting, Art. 66, para. 2 of the Public Procurement Act. On the use of thethird persons shall be subject to the provisions of Art. 65 of the Public Procurement Act
Tenders are to be submitted at the address: Sofia, bul. Kl. Ohridski "№ 8, Technical University - Sofia, school block № 1, floor 3, office 1317 -
Internet address (URL): www.tu-sofia.bg