Contract notice: Construction work Tender in Hungary - 29471213
Tender notice from Hungary, published on 26 Dec 2018.
Exeutive Summary
The IPARM?VÉSZETI MÚZEUM has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 26 Dec 2018 and is scheduled to close on 29 Mar 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29471213, while the tender notice number is 572328-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45000000, 45100000, 45111100, 45200000, 45210000, 45212300, 45212310, 45212313, 45220000, 45223200, 45223300, 45260000, 45262690, 45310000, 45315100, 45315300, 45320000, 45331000, 45332000, 45350000, 45400000, 45420000, 45432000, 45451300, 45000000, 45100000, 45111100, 45200000, 45210000, 45212300, 45212310, 45212313, 45220000, 45223200, 45223300, 45260000, 45262690, 45310000, 45315100, 45315300, 45320000, 45331000, 45332000, 45350000, 45400000, 45420000, 45432000, 45451300 CPV Description: Construction work. Site preparation work. Demolition work. Works for complete or part construction and civil engineering work. Building construction work. Construction work for art and cultural buildings. Construction work for buildings relating to exhibitions. Museum construction work. Engineering works and construction works. Structural works. Parking lot construction work. Roof works and otherspecial trade construction works. Refurbishment of run-down buildings. Electrical installation work. Electrical engineering installation works. Electricity supply installations. Insulation work. Heating, ventilation and air-conditioning installation work. Plumbing and drain-laying work. Mechanical installations. Building completion work. Joinery and carpentry installation work. Floor-laying and co Interior gardens IMM full reconstruction and expansion (1094) Reference Number: EKR001110692018 Main Site: Budapest IX. keruelet 36862 at local scale, in production at 1093 Budapest, Uellői ut 33 37th „The full reconstruction of the Museum of Applied Arts in the framework of the author's authoring of the industrial museum" IMM existing monuments are reconstructed, the existing forests serve for traction, refreshment, restaural and reconstructive, as well as for imperative reasons, static constellation reasons, and modern technical service (elevators, cheetahs, etc.). 12 050 m long. The existing monuments are epuelthe epeliet's structures, dissidents, superintendent, dwarfed, reconstructed ornaments, fem, stone, ueveg, padlo, plaster and wall coverings, and the place of the painter's painters. as well as the smaller courtyard also levelen suellyesztesevel conference ko The facades of the existing epuelet can basically be divided into four groups: the facades faced by the street, full felueletuekoen Zsolnay ceramic elements, and the inner courtyard facades with plastered ceilings, with the drawings. The fa-ade of Zsolnay ceramics and other design elements can be kept as large as possible, the reconstruction will be completedni. In the new epithelial cornice, the epicureate is equipped with a modern runner-up facility, such as artifacts and material moves, car parking at the level of 2 and -3, garage, carpentry and retrofit for locals, and new functional elements let's like the new design class and the foyer. the eserem and the museum are new to the queens. By uIn addition to the resilient workpiece floor, the foundation wall of the Hőgyes Endre street is covered with original lechner designs, with the use of the material structures used in the existing building. In the case of the Lechner epuel, the materials used originally are restaural, complementary to keruel, according to the principles and determinants of the restorer professional documentation.Such is the fa-ade element of the fa-ade, from the Zsolnay ceramic elements to the wooden arrows at the tactile coverings. as well as reconstructing its intermittent spaces (for example, painted colored uevegtető fields). A mOn the eve of the evangelism or in the established terrain areas (eg interiors of the seasonal cialito, conference center) their structural materials are simple, but today the highest technical level is formed for keruel. A -3. The basement level is net and the useful floor area is 1159.99 m2. basement level net, and also useful base area 1167.80 m2will be A -1. The basement level will be net and the useful floor area will be 4036.93 m2. The basement net and a useful basement will be 2122.77 m2. The net and useful floor area of the foeld level will be 5335.93 m2. The net high and useful base area will be 614.61 m2. The 1st floor will have a net and useful base area of 4486.71 m2. The 2nd floor is a net and a useful baseruelete will be 3645.10 m2. The 3rd floor will have a net and useful base area of 1965.87 m2. The museum's epuelete Mindoesses will be 24576, 15 m2 net, and it will also be a useful floor space. - 62 (1) and (2) exclude the grounds for exclusion Eliminates keruel from Kbt. - 74 (1) is based on the subscriber against whom, or whose sub-agent and appropriately true reader, is a buyer, against the involved economic operator, the Kbt. (A) to (q) of Article 62 (1), or (2) (a) to (b), or any of the grounds for refusal of thethe excitement is the first step in the process. In the case of the exclusions referred to in Article 62 (1) (b) and (f) of the Excluded Act, the host entity submitting, subordinating or appropriately retaining the appropriate excerpts from any other reason shall not refer to Kbt. Article 64, if Koezbekerzesi Hatosag is the Kbt. Article 188 (4)or by means of a case-by-case order in case of a case of Kbt. According to Article 188 para.that the proof of the excitement of the excitement can be accessed (can be used) by the authenticated documents before the start of the trial, as long as the contents of the data sheets or data are correct.SZ.1. in 322/2015. (X.30). Subject to the provisions of Article 21 (1) of the Kormany Decree, if no Etv. in the construction industry, according to the notices; is not Magyarorarely established hosts are not listed in the country of establishment of the country of residence, or do not have a license, legal or organizational license in the country of establishment. Included arrow in EEKDIncorporation. The following is a reference to the KDT in Section 1 (1) of the Government Decree, which is based on the Kbt. In the case of a Kezzeszerzesi, which is conducted according to Masodik Resze, it is necessary to prove in advance that the Kbt is not included in the introduction of the unified European Co-Procurement Document. 6- - (1) and (2) of the Act on the power of the subdivision. In the case referred to in Section 69 para. To be verified by the modalities defined in -- 1, 2, 3 and 4 of the lower standard: A Kbt. Article 62 (1). (c) in relation to point (k), a statement must be made in Hungary, or in Hungary, in order not to disclose such information.whether they are listed on a stock exchange or listed on a stock exchange; if the subscriber is not quoted on the stock exchange, then LIII. toerveny Article 3 (38) (a) to (b) or (d) shall include a statement containing the description of allando residential areas; if the host does not have the penzmoslo toerveny. The reasons for the expulsion are not valid. from an actor that has been filed in the EDF by the same AK in the early history of the host. In this case, the host participant declares in arrest which of the earlier ones he / she has taken into consideration.only the EECD has to be inserted into the Kbt. - 62 excluded. SZ.1. real mod. character string in III.1.2 The timekeeper of the penzuegyi host and the proper documentation must attach the lower documents: P.1. Article 19 (1) of the Government Decree. (c) and (19) (5)alairt's statement about the net-arabeteler, and the full arbeveteler, according to the subject-matter of the theses of the battlings of the pre-indiscriminate task before the start of the exam period (in the case of the heroes of the thesis, who had begun after the beginning of the exam period). Section 2 (5) is based on the appropriate research papera preliminary statement of the owners accept the simple declaration of the economic actors (in the fourth section of the alpha alpha), does not search for a single European document of the European Union. The capacities of any organization or person in charge of the program can meet the demands of the appropriate counterparts, and the relationship between the audiences and the audiences can be met.legal fueggetlenuel. In this case, you should report this organization and the relevant points of interest in the present case, or the appropriate audit trail or case-law that the resource resource of the organization or reporter has or is struggling with. You must attach your capacity to the schedulehenceforth, an organization that has a contract or contract with a contractor or contractor has a document that undermines that the author's performance will be sporadic for the duration of the contracted performance.the organization issuing the capacities shall declare the statement under paragraph (1) and, in the case of the authenticity of the certificates, the organization shall, except in the case of appropriate counterparts, justify the application by the same modalities as the appropriate condition. Yes. Article 65, ilGovernment Decree No. 321/2015. (X.30.) Section 19 (3) of the Government Decree Technical Documentation (Continued) Reputation on the basis of Section 2 (5) of the Government Decree, the preliminary proof sheet of the relevant candidates is accepted by the Hosts. simple statement (kitoel of the 4th alpha alpha), does not look for a single EuropeanCoaching document IV. The capacity of a suitable organization to meet the requirements of a suitable body or person can be met by the capacities of any organization or person, the legal relationship between the audiences and the law is fueggetlenuel. In this case, you should report this organization in the newsletter and as a reference point in the pastk expose to the appropriate researcher or researcher whose resources or resources of the organization are present or suspicious of the organization. It must be accompanied by a document containing the capacities of the contractor or contractor who has the capacity to dispose of it, which underlies that the authorwill be provided with spontaneous resources for the duration of the contract. Article 26 (2) of the Government Decree. based on the case of a hired entrepreneur established in Hungary, the record is checked by the news agency on the basis of the data of the notepads of the construction industry.in the case of e-mail, the European Parliament and Council Directive 2014/24 / EU XI. You must enter a certificate (extract) or any other certificate or statement according to the registers listed in the bill of lading. For more information, please refer to the Character String section of the 7th edition of the Kezzeszerzesi documents - For more information on the latest news.it is possible to introduce cross-border documents in the EDF system exclusively through electronic means II. - According to the formal requirements set forth in the Foreword by Oesszeallitasa, 1. For the AK, the attention is drawn to the timeliness (s), 321/2015. (X. 30.) Government Decree Article 30 (4). be based on the list of qualified journalists for those who are qualifiedestorub is downlifting the appropriate conditions of the Newsletter; es III.1.3. 4. AK is the Kbt. Article 54 (1) is based on the requirements of Article 54 (2). Ticket: HUF 50, 000, 000 (Oetvenmillio forint). In case of payment the place of payment is Hungarian Allamkincstar. treated with samsam samsam 10032000-01425152zam. More info in documentation. 5. K koezoes journalists also accept the suggestion. AK does not make a successful bet on the winner, but in the case of koezoes, the koezoes journalists must have a one-to-one relationship with one of the choreographers and the timekeeper. (READ mOREIn the case of the documentary, the AK does not answer the basic budget of the project organization, the project manager, does not make it from the winning timekeeper (s), nor does it make a host organization (project partner). Yes. Article 56 para. (7) base date shall be dated: 21.01.2019, 10:00 am. The location of the collector: Museum of Applied Arts, 1091 Budapest, Hőgyesi Endre u. 10. Underneath the front of the port in front of the port. 8.No order AK another hianypot, if the hijanypotlass is the timer of the event not previously. Involves an actor in front of the player, and with this host in mind, the other hianypotlas would be suicidal. 9.AK does not use an electronic arsenal. Article 66 para 11.Az AF I.3. The URL is the technical advert. feladhatosagaert. AK provides the technical documentation in the file. According to AK - the preliminary negotiation with the head of the EDF system, its jovahagyas, draws attention to the fact that Kbt. Article 39 (2) (b) and 424/2017. (XII. 19.) Korm.Article 3 (1) (b) of the Decree does not provide all the technical documentation in the EDF system; - "20180524_engterv_jogero" .2) Other technical documents: All the previous oneskumentum data carrier eskoezoen keruel is the owner of the owner of the bocsatasara full-length documentary and reclaiming against, Lebonyolito lower name: Őszy Koezbekerzesi Tanacsado Kft., section: 1036 Budapest, Becsi ut 57-59. I. em. 10, on business days during opening hours, from 9:00 to 16:00 ora koezoett. We bring the attention of the host actors to the fact that if they are not quotedthis eligible person would take the farmer. the person in charge must present the media, such as the person who received it, with his or her legal, the legal representative of the legal person, who has the legal certainty, shall present it at the time of dismissal. An inquiring host is a timely response to technical documents. Responsible Insurer: Author's Terms and Conditionsresponsible for large-scale (full-bodied construction work). If you do not have the date of your authorship, you will consider the Kbt. Section 131 (4). According to jar. Internet address (URL): http://www.imm.hu
The bid deadline for Contract notice: Construction work was 29 Mar 2019. Bidding is closed.
This tender has been issued by IPARM?VÉSZETI MÚZEUM in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45111100 - Demolition work, 45200000 - Works for complete or part construction and civil engineering work, 45210000 - Building construction work, 45212300 - Construction work for art and cultural buildings, 45212310 - Construction work for buildings relating to exhibitions, 45212313 - Museum construction work, 45220000 - Engineering works and construction works, 45223200 - Structural works, 45223300 - Parking lot construction work, 45260000 - Roof works and other special trade construction works, 45262690 - Refurbishment of run-down buildings, 45310000 - Electrical installation work, 45315100 - Electrical engineering installation works, 45315300 - Electricity supply installations, 45320000 - Insulation work, 45331000 - Heating, ventilation and air-conditioning installation work, 45332000 - Plumbing and drain-laying work, 45350000 - Mechanical installations, 45400000 - Building completion work, 45420000 - Joinery and carpentry installation work, 45432000 - Floor-laying and covering, wall-covering and wall-papering work, 45451300 - Interior gardens.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 29471213. The purchaser document reference is 572328-2018.