Contract notice: Construction work Tender in Poland - 29132039
Tender notice from Poland, published on 11 Dec 2018.
Exeutive Summary
The POLSKIE KOLEJE PA?STWOWE S.A. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 11 Dec 2018 and is scheduled to close on 21 Jan 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29132039, while the tender notice number is 542838-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 45000000, 45100000, 45110000, 45111000, 45111100, 45111200, 45112000, 45111213, 45111214, 45111220, 45111230, 45111240, 45111250, 45111291, 45111300, 45112310, 45112420, 45112450, 45113000, 45120000, 45121000, 45122000, 45200000, 45210000, 45211310, 45211350, 45212180, 45212230, 45212350, 45212420, 45220000, 45221000, 45223000, 45230000, 45260000, 45300000, 45315100, 45317000, 45311000, 45314300, 45400000, 45343100, 45343000, 45421110, 45453000, 45500000, 45000000, 45100000, 45110000, 45111000, 45111100, 45111200, 45112000, 45111213, 45111214, 45111220, 45111230, 45111240, 45111250, 45111291, 45111300, 45112310, 45112420, 45112450, 45113000, 45120000, 45121000, 45122000, 45200000, 45210000, 45211310, 45211350, 45212180, 45212230, 45212350, 45212420, 45220000, 45221000, 45223000, 45230000, 45260000, 45300000, 45315100, 45317000, 45311000, 45314300, 45400000, 45343100, 45343000, 45421110, 45453000, 45500000 CPV Description: Construction work. Site preparation work. Building demolition and wrecking work and earthmoving work. Demolition, site preparation and clearance work. Demolition work. Site preparation and clearance work. Excavating and earthmoving work. Site-clearance work. Blast-clearing work. Scrub-removal work. Ground-stabilisation work. Ground-drainage work. Ground investigation work. Site-development work. Dismantling works. Infill work. Basement excavation work. Excavation work at archaeological sites. Siteworks. Test drilling and boring work. Test drilling work. Test boring work. Works for complete or part construction and civil engineering work. Building construction work. Bathrooms construction work. Multi-functional buildings construction work. Ticket offices construction work. Installation of changing rooms. Buildings of particular historical or architectural interest. Construction work for restaurants and similar facilities. Engineering works and construction works. Construction work for bridges and tunnels, shafts and subways. Structures construction work. Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork. Roof worksand other special trade construction works. Building installation work. Electrical engineering installation works. Other electrical installation work. Electrical wiring and fitting work. Installation of cable infrastructure. Building completion work. Fireproofing work. Fire-prevention installation works. Installation of door and window frames. Overhaul and refurbishment work. Hire of constructionand civil engineering machinery and equipment with operator. Reconstruction of the Gdańsk Głowny train station. Reference Number: KFZ / 2018 / WNP-009417 1. The subject of the order is a construction work consisting in the reconstruction of the Gdańsk Glowny railway station Main Site: Gdańsk Głowny 1. The subject of the order is a construction work consisting in the reconstruction of the Gdańsk Glowny railway station 2. Description of the subjecton orders (hereinafter referred to as "OPZ"), it constitutes Annex No. 2 to the ToR and it contains: construction design, detailed design, technical specifications of performance and acceptance of the robot and the robot's order. The Employer emphasizes that all works included in the scope of orders should be carried out in accordance with the design documentation, technical specification of performance and acceptance of construction works, guidelines of the Employer, TuesTenant's manual, recommendations and decisions issued as well as legal regulations and standards. The ordering party indicates that the robot's excess is auxiliary and does not constitute a closed robot description directory. The Contractor is obliged to fulfill the orders on the terms and conditions specified in the Contract template - Annex No. 9 to the ToR and description of the subject of the order (OPZ) Annex No. 2 to the Terms of Reference.3. The contractor or subcontractor is obliged to employ persons performing work within the meaning of art. 22 - 1 of the Act of 26.6.1974 Labor Code (Journal of Laws of 2016, item 1666, as amended). The employment obligation applies to employees who, under the Agreement, which will be concluded as a result of the order being awarded, will perform activities in the scope ofrobot: 1) accounting and maintenance of construction documentation. 4. The requirement of employment under a contract of employment does not apply to persons performing other work areas, in particular: construction managers, providing geodetic services, and suppliers of building materials. 5. During the performance of the Contract, the Contractor is obliged to submit within 5 days from the date of requesting declarations by the Employerand documents, which the Ordering Party is entitled to demand in connection with the performance of control activities with respect to the Contractor regarding the fulfillment by the Contractor or sub-contractor of the employment requirement under the employment contract, persons performing the activities indicated in point 3 - 6. The Contractor, in connection with the Employer's request specified in point 5, is obliged to submit, in particular, the following documentment: statements of the Contractor or subcontractor about employing persons under the contract of employment performing the tasks to which the ordering party refers. This statement should contain in particular: 1) precise specification of the entity submitting the statement, 2) date of submitting the statement, 3) indication that the actions covered by the tender are performed by persons employed under the employment contractwith an indication of the number of such persons, 4) type of employment contract and full-time job, 5) signature of the person authorized to make a statement on behalf of the contractor or subcontractor. 7. Specific rules, conditions and sanctions regarding employment on the basis of an employment contract are set out in Chapter III of the Terms of Reference 8. The Contracting Authority allows the subcontractors to entrust the execution of some orders to subcontractors. 9. Contractor fromis obliged to indicate in the document JEDZ, constituting Annex No. 3 to the ToR, parts of the contract, the execution of which is intended to entrust subcontractors and the submission of subcontractors by the Contractor (if known at this stage). 10. The orderer provides for a local vision. Details were included in the SIWZ. 11. The Contracting Authority will apply for co-financing from EU funds under the Operational ProgramInfrastructure and Environment 12. The Contracting Authority reserves the right to annul proceedings pursuant to art. 93 section 1a if it is not granted funds originating in the European Union. 13. Note: Due to the lack of the possibility of placing more information, detailed information is contained in the ToR posted on the Purchase Platform - "Platform" or "System" at:https: //pkp.eb2b.com.pl Zamawiający withdraws from the description of how to assess the fulfillment of conditions in this area. Additional information to Section III.1.3) Technical capacity and professional qualifications in the field of people who will be directed to the implementation of the contract. The Employer allows the option of combining functions, in the case of persons who have rights in more than one specialty, o ktreferred to in section III.1.3) item 2) lit. Ag with reservation below. The Employer allows the possibility of combining the functions of the Project Coordinator with the function of Construction Manager. The concept of public building should be understood in accordance with the definition contained in - 3 point 6 of the Regulation of the Minister of Infrastructure of 12.4.2002 on technical conditions buildings and theirs should matchlocation (ie OJ of 2015, item 1422). The concepts of entering a building in the register of monuments should be understood in accordance with the law on protection of monuments and the protection of monuments (Journal of Laws No. 162, item 1568 with later amendments .). Ordering Party considers the condition to be fulfilled if the Contractor demonstrates that: has financial resources or creditworthiness to incur liabilities in the amount not less than PLN 7, 000, 000.00annually: seven million zlotys 00/100). According to the provisions of Chapter X par. 20 In the case of the Economic Operators submitting all documents containing financial data in currencies other than PLN, the Employer as the currency conversion rate will accept the average exchange rate of the National Bank of Poland (NBP) on the date of publication of the contract notice in the Official Journal of the European Union, no such exchange rate was announced on that day, the average NBP exchange rate announced for the given currency will be used on the day before the publication of the contract notice in the Official Journal of the European Union. Note !!!! Due to the limited number of marks in Section IV: The procedure, the Employer informs that the Contractor within 3 days from the date of posting information on the Platform, referred to in art. 86 par. 5 of the Public Procurement Law, will provide the Ordering Party (without a separate request) with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23) of the Public Procurement Law Act in accordance with the model constituting Annex No. 6 to the Terms of Reference. Along with the submission of the statement, the Contractor may provide evidence that links with another Contractor do not lead tocompetition plots in the procurement procedure - the above document should be attached on the Platform in the tab Questions / Information. 1. Contractors who are not subject to exclusion from the proceedings under Art. 24 sec. 1 and art. 24 sec. 5 points 1), 2), 4) and 8) Public Procurement Laws - 2. A list of statements or documents confirming compliance with the conditionsin the proceedings and no grounds for exclusion are included in Chapter X SIWZ. Contractors jointly applying for the award of a contract (Consortium, civil partnership) conditions for participation in the proceedings can meet jointly. None of the Economic Operators acting jointly may be subject to exclusion pursuant to art. 24 sec. 1 and par. 5 points 1), 2), 4) and 8) Public Procurement Laws 3. The Contractor together with the offer shall submitvalid as of the day of submitting bids statement in the following scope: Part II sections AD, Part III sections AD, Part IV section α (Contractor is limited to completing the section α in part IV and must be completed by any of the other sections in part IV) and Part VI, in electronic form with a qualified electronic signature, via the Procurement Platform, referred to as "Platforma "or" System ", at: https://pkp.eb2b.com.pl, in accordance with Chapter XII of the ToR. The information contained in the statement is a preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the proceedings. The declaration referred to in the above Contractor shall be submitted in the form of a single European order document, drawn up in accordance with the standard formula forthe mulerza specified in the implementing regulation of the European Commission EC (EU) 2016/7 of 5.1.2016, issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU and art. 80 ust. 3 of Directive 2014/25 / EU, hereinafter referred to as "EAT", an example of which is Annex 3 to the ToR. 5 The contracting authority, in accordance with Article 24 aa paragraph 1 of the Public Procurement Law, provides for the possibility of assessing tenders in the first place, and usthen examine whether the Contractor whose tender has been evaluated as the most advantageous is not subject to exclusion and meets the conditions for participation in the proceedings. According to art. 26 par. 1 of the Public Procurement Law, the Contractor whose offer has been rated the highest, at the request of the Employer will submit the documents referred to in Chapter X of the ToR and Regulations referred to in Chapter II of the ToR, on the types of dockment, which may be requested by the Awarding Entity from the contractor in the proceedings for the award of the contract, - 2 para. 2 point 3) bank information or jump, - 2 para. 4 point 1) robot list, -2 para. 4 point 10) list of persons and -5 points 1) -6) and 9) in the case of foreign entities, respectively, documents from -7, -8 Resolution 7. Contractor who refers to the resources of other entities in order to demonstrate the lack of existence of substitute for themin exclusion and fulfillment, to the extent in which it refers to their resources, the conditions for participation in the proceedings also include the documents of the EED regarding these entities, in accordance with the model constituting Annex No. 3 to the ToR. 8. In the event of a joint application by the Contractors, the JEDZ document shall be submitted by each of the Contractors jointly applying for the order. These documents confirm the fulfillmentthe conditions for participation in the proceedings and the lack of grounds for exclusion to the extent that each of the contractors demonstrates fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion in accordance with the model constituting Annex no. No. 3 to SIWZ. 9. The Employer demands from the Contractor, which relies on the abilities or situation of other entities on the terms specified in art. 22a of the PZP Act, representations in referenceu to those entities of documents referred to in Chapter X, paragraph 7 point 2) SIWZ. 10. The term in Section IV.2.6 of the Announcement The minimum period for which the Contractor will be bound by the offer is 3 months = 90 days. 11. Specification in Section II.2.7 of the announcement period on days 826 = 118 weeks. 12. Other information is included in the SIWZ provided on the Platform at www.pkp.eb2b.com.pl. 13. SIWZ after the publicationThe announcement will be made available on the Platform at https: //pkp.eb2b.com.pl. Internet address (URL): http://www.pkp.pl/
The bid deadline for Contract notice: Construction work was 21 Jan 2019. Bidding is closed.
This tender has been issued by POLSKIE KOLEJE PA?STWOWE S.A. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45110000 - Building demolition and wrecking work and earthmoving work, 45111000 - Demolition, site preparation and clearance work, 45111100 - Demolition work, 45111200 - Site preparation and clearance work, 45112000 - Excavating and earthmoving work, 45111213 - Site-clearance work, 45111214 - Blast-clearing work, 45111220 - Scrub-removal work, 45111230 - Ground-stabilisation work, 45111240 - Ground-drainage work, 45111250 - Ground investigation work, 45111291 - Site-development work, 45111300 - Dismantling works, 45112310 - Infill work, 45112420 - Basement excavation work, 45112450 - Excavation work at archaeological sites, 45113000 - Siteworks, 45120000 - Test drilling and boring work, 45121000 - Test drilling work, 45122000 - Test boring work, 45200000 - Works for complete or part construction and civil engineering work, 45210000 - Building construction work, 45211310 - Bathrooms construction work, 45211350 - Multi-functional buildings construction work, 45212180 - Ticket offices construction work, 45212230 - Installation of changing rooms, 45212350 - Buildings of particular historical or architectural interest, 45212420 - Construction work for restaurants and similar facilities, 45220000 - Engineering works and construction works, 45221000 - Construction work for bridges and tunnels, shafts and subways, 45223000 - Structures construction work, 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45260000 - Roof works and other special trade construction works, 45300000 - Building installation work, 45315100 - Electrical engineering installation works, 45317000 - Other electrical installation work, 45311000 - Electrical wiring and fitting work, 45314300 - Installation of cable infrastructure, 45400000 - Building completion work, 45343100 - Fireproofing work, 45343000 - Fire-prevention installation works, 45421110 - Installation of door and window frames, 45453000 - Overhaul and refurbishment work, 45500000 - Hire of construction and civil engineering machinery and equipment with operator.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 29132039. The purchaser document reference is 542838-2018.