Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 34928500, 45111000, 45111290, 45231300, 45232154, 45232400, 45233120, 45247130, 71240000, 45000000, 45000000, 34928500, 45111000, 45111290, 45231300, 45232154, 45232400, 45233120, 45247130, 71240000
CPV Description: Construction work.
Street-lighting equipment.
Demolition, site preparation and clearance work.
Primary works for services.
Construction work for water and sewage pipelines.
Construction work of elevated tanks for drinking water.
Sewer construction work.
Road construction works.
Aqueduct construction work.
Architectural, engineering and planning services.
Zalaegerszeg Eszaki Ipari Park előkoezművesitanium
Reference Number: EKR000820422018
Concessionaire in the frame of the project TOP-6.1.1-15-ZL1-2016-00001, Zalaegerszeg Industrial Industrial Park for construction works and execution projects for waterworks and waterworks
Main Site: Zalaegerszeg 0788 / 80, 0788/78, 0788/79, 0788/75, 0787, 15443, 0788/69, 0778/1, 15445, 0788/85, 0779/2, 0779/4; Kispali 010/14, 08
Design Tasks:
Zalaegerszeg Technical Industrial Park Building and Construction Engineering Design Plan of 191/2009. (IX. 15.) Government Decree No. IV. (Section 22-23) and the first part: "The content of the documentation of the contractor" is based on the design and implementation of the experimental design (water and wastewater management and water supply)series and sculptures, sewage drainage - gravitational, kneeling) and artillery. Planning of the industrial park is ensured by the planning of new projects.
The actual planning of the plans is based on the designs planned or extended in the framework of the mass tourism. Compensation and reparation with a customer, drainage of new wheelchairs.
Works to be carried out:
1. Eszak-Deli Industrial Park Utility: 0 040 km. Wedfrom where it is 0 840 km. E-D, designed for eagles, 7.0 m without casing, 800.0 m in length with 2x1 sparks (K.VI.B.) and 0 840 km in length. The projected experimental traffic is R = 20m with honey sugars, the inner radius is R = 15.0m.)
2. The experimental effect of the design is the result of the "small"The low-energy energy with a foam-shaped foam: 873 m. Designed with a low-impact design with a foam core: 1264 m
3. The epitope of the water works: Zalaegerszeg Industrial Park Industrial Park with water works, 3097 fmwaterworks, a 500m3 water tower and a trailer and other artificial beds. 1660 fm gravitational ducts and 570 fm sewage drainage systems, with heater and other worksheets.
The design documentation of the project is:
FL Consortium, 2803117. Working Hours, Zalaegerszeg Industrial Industrial Park, t 17E. working day, Zalaegerszeg Industrial Industrial Park, and the completion of the pilot project. Documentation and technical documentation related to the plans, concordant declarations and other documents. Approvals:
Utepites licensing: ZA / UO / NS / A / 12/5/2018 .; 01/26/2018. (legal force: ZA / UO / NS / A / 12/9/2018, 2018.03.23)
Water and drainage waterlegal permission to grant permission: Zala / 1733 vizikoenyvi szam, 36800 / 179-21 / 2018. alt .;
A) Kizaro Causes:
There is no AT, sub-business in the standard, and it is not possible to obtain a valid economic operator, against whom the Kbt. Section 62 (1) to (2)• The AT (in the case of a timely interview with the deadline) and the Kbt. Section 65 subsection (7) of the Act on the organization / person at the time of filing the application, In accordance with the provisions of this section, EEKD must state in advance that it does not belong to the Kb. Article 62 (1) and (2) of the Exclusion CausesThe AT declares that the contractor will not be required to complete the contract. Section 62, subsection (1) and paragraph (2), which does not take into account the validity of the subpoenas that are not valid. (4) - (6) of Section 69 of the Criminal Code of the Criminal Code for the exclusionary reasons and the suitability of the probationary claims.III. The reasons for the exclusion of the grounds for non-existence are set out in Section 1 (2) - (5) of the Criminal Code, and in Article 8, Section 10, Section 10 of the Criminal Code. - 12-16. The sections are also properly applied.
For the exclusionary reasons, please refer to the Kbt. 64 and - 74 (1).
Iranyado tovabba: e-Kr. 12th- (2) -Articles for the entry into professional and qualifying entries:
The minimum qualifying requirements:
SZ.1 Unfit AT, if the business operator on the epithetics business is not registered in the Etv., and in the case of the non-Hungarian epitomous business operators in Hungary, -NO.2 Unsuitable AT if the business operator on the epithetics business is not registered in accordance with the design services of the epithet berth store, in the trade register of a professional chamber, or in the case of non-resident operators established in the country of establishment or in the country of resident of the country of origin, with no license, no entitlement or with organizational or chamber members. the information provided in the form is compressed in the formint by submitting proof of suitability for the suitability of the suitability of the application. Article 69 (4) according to the data of the names of registrars in the building industry, in case of a registered economic operator established in Hungary, AK is registered in the register of non-resident Hungarian companies(1) (2) to (5) of the Act on the Protection of the Rights of Civil Servants in the Republic of Hungary. in case of settled economic operator, the role of the public in the register AK controls the epithet-in the case of a non-resident economic operator established in the Republic of Hungary, a certificate relating to the role of the resident country in the register, or the right to dispose of the right to dispose of a license, a right or an organization or a chamber member in a resident country(2) - (5) of Section C of the Act. Section 65 (7), (9), (11) and the Kbt. Section 69 para. (11) of the EEKD. please provide us with detailed information on how to apply for the relevant proofs regarding the suitability of the application. Article 69 (4) According to a circular line.
Exact Verification:
P.1.-a 321/2015. (X.30.) On the basis of Article 19 para. (1) (a) of all the constituent members of the penitentiary party, the date of the summoning of the debtor shall not be more than one day with the lowest probationary and express content contained therein, or when it started to work if these data were available to you:
- penzforg(in line with the date of the previous 24 months),
had it been 15 days before the deadline (AF point VI.5)
("sorba allitas" kitetel under the terms defined in Article 25 Paragraph 2 of the LXV toervens of 2009), P.2. pursuant to Article 19 (1) (b) of the Decree 321/2015 (X.30.)the last one preceding the filing of the solvency message is completed by the administrator, his or her predecessor, in accordance with the administrative law, in a simple masonry, if the garden can be consulted on the website of the ceginformation service, the information of the co-operative is checked by the co-ordinator, and the website of the ceginformation service is not succesful.
If AT iseljarast felindito felhivas III.1.2. P.2., it does not have a full period of time because of the fact that it has begun to be artificial after the beginning of the period, the amount of the work being carried out by the contractor (construction works and / or waterborne epitaphs) and the constructions related to them structurally or functionally(s) is able to justify the AT penzuai and the economic opportunity if, during the artificial life, the co-ordinated product (construction drawings and / or waterborne epitaphs (water supplies) and the construction of texts related to them structurally or functionally )- P.3. In the case of a certain number, the arbevetele is equal to or greater than the value of AK. a 321/2015. (X.30.) Korm. Decree on the basis of Section 19 (1) c) of the Decree on the basis of the EEKD decree, with the closing date of the 3 seizureto produce and / or display the content of the subdirectory (s), and to construct the constructions that are structurally or functionally linked to them, in the context of an exemplary comparison of the AT at the time of the letter and when the activity data were available .
A 321/2015. (X.30.) Korm. Decree No. 19 (3)if it does not have the document as described in paragraph (P.2) and P.3 of the Code because it is in a legal form in which the submission of a statement or a statement of facts is not possible, instead of a valid and modal verdict, any other statement or document deemed appropriate by the CAyou can choose a pensioner and a cashier. In the case of the excellence of the AT, it is probable that it is in a legal form in which the presentation of the report or the statement of the matter is not possible and can not be used for the purposes of this point, instead of the appropriate test and verification modalities, al accepted modjarol.
Continue. suitable for min.
Roeviditesek: Timer = AK, Timer = AT Electronic Timer System = EDR, Vall.dij = Timer, Timer: Content Frame, KD = Timely Documentation.
1st Yes. Section 53 para. (6): CA provides the Tamogatasi Authorization Module for the provision of the Penzuegi collateral for the Tire Project, which has not-or in the case of accepting a claim in a smaller oasis, you can use it to disclose it or you may sue the contractor / contractor.
2nd Provision of Time: 5 000 000 Ft, Kbt. Article 54 (2) based on KD. Location of the payer: The seat of the CA, number of copies: 11749008-15432704, certificate of attestation: atutral certificate of the AT at the request of the debtorl, a bank guarantee statement or the test deposit (e-Cr. - 10 (4)). The number of ATs available to the list of qualified ATs is strict (P / 1, P / 2, P / 3, M / 1, M / 2). Local beyards: 12.11.2018 10.00 am, location: Zalaegerszeg, Kispali crossing in the east-west industrial park crossroads
5. The offer must include AF and KDall the documents.
8. AF Section IV.2.6), "2 Months" = 60 Days, according to - - 2 - - 2 of - e-Kr.31
9 The FAKSZ is responsible for the performance of the Fellowship: Dr Hatas Orsolya Liliana (now. 00040), e-mail:
[email protected] 10. The Authority shall apply Section 75 (2) (e) of Section 75.
11. In AF, no warranties will be made regarding the purchase of the co-ownership in 2015 CXLIII.-toerveny and vh. according to the directives of his decrees.
12. AK host organization will not be funded.
13th Responsibility: The winner AT must have a contractual time, and during the contract, he / she must always have a) ervenyes, leg. 200 000 000 HUF / carnival cost. 300 000 000 HUF / year, with oesszkockazatu epitesi and installer (duly and responsibly), b) leg. 5 000 000 HUF / carnival cost. 25 000 000 HUF / year with planners, insurer, and in full contact with the contractor. At the time, AT must declare that it will be provided by the insurer at the time of the contract, and will maintain it under the authority of the contracting party.
14th To the authors of point III.1.3) M.2 to the author's questionnaire (contract descriptor) MV-VZ or. MV-KE or KE-K or VZ-TEL must have a legitimate interest in the Chamber's notices in relation to the KD content.
15th The Kbt. Section 77 (1): 2nd and 3rd min. ert. in case of the 60th month in the event of a vigorous or even exceeded time period. with the help of a battery. Ert. aspect: best artifacts gold, ar: translated gold, 2nd and 3rd min. Wedpoint: straight gold, in the KD, straight. ponthatar: 0 10
17. A II.2.5) 2. min. ert. aspect: the rehearsal is not exclusive to the experience gained from experience.
18. The reason for the resignation is the exclusion of the reason: The contractor is responsible for the execution of the export plans, the size of the real estate.
The artillery jigs that link to it cross the planned path and the open arch. Crossing skins will give you a chance to get a chance when a technically unusual sequence of epithets does not last. As a result, the bargaining costs increase. These tightly-knit work can not be limited if they are-From a technical point of view, it is of paramount importance that the water and the water works on a runway track, and may cause fatal warranty problems in the event of a polling engineer.
Internet address (URL): http://www.zalaegerszeg.hu