PÉCS MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Construction work. The project location is Hungary and the tender is closing on 03 Dec 2018. The tender notice number is 461199-2018, while the TOT Ref Number is 27822332. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Construction work

Deadline : 03 Dec 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 27822332

Document Ref. No. : 461199-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : PÉCS MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Pécs Megyei Jogú Város Önkormányzata
Address: Széchenyi tér 1.
Town: Pécs
Postal Code: 7621
Contact Point: Dr. Eötvös Gábor

Phone: +36 308161441
Fax: +36 72514810
Hungary
Email :kozbeszerzes@pvfzrt.hu
URL :http://www.gov.pecs.hu

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 35120000, 45111100, 45261400, 45262300, 45262500, 45262700, 45310000, 45312000, 45312100, 45312310, 45331000, 45332200, 45410000, 45421100, 45442100, 71320000, 71356400, 45000000, 35120000, 45111100, 45261400, 45262300, 45262500, 45262700, 45310000, 45312000, 45312100, 45312310, 45331000, 45332200, 45410000, 45421100, 45442100, 71320000, 71356400
CPV Description: Construction work.

Surveillance and security systems and devices.

Demolition work.

Sheeting work.

Concrete work.

Masonry and bricklaying work.

Building alteration work.

Electrical installation work.

Alarm system and antenna installation work.

Fire-alarm system installation work.

Lightning-protection works.

Heating, ventilation and air-conditioning installation work.

Water plumbing work.

Plastering-

Technical design services.

TOP-6.1.1-16-PC1-2017-00005-industrial hall version

Reference Number: EKR000507062018

TOP -6.1.1-16-PC1-2017-00005 - Design and construction of industrial doors for export of industrial halls' Main Site: Pecs, Időjos utca(hrsz .: 01455/88)

The most important technical elements of the new epitome:

Epites location: Pecs, Időjos utca (hrsz .: 01455/88)

Epitmeny purpose: industrial hall

Beepit nature: free allo

Levels: Foeld level 1 floor:

10, 000 m2

Land plot: 1 755.42 m2

Useful floor plan: 1664 m2

Inscription: 1 755.42 / 10 000 = 0.1755 (17.55%)

Epitmenymagassag: 6, 74 m

Fitted jacket: 4547, 14 m2

Zoeldelogs: 5452, 86 m2 (54, 52%)

Caravan placement: on a plot of land on a plot of land

Installation:

Cargo and wall masonry: 150 m2

Surface 540 m2

Trapezoidal roof: 1612 m2

Trapezoid panel: facade: 1428 m2

Interior sandwich panel: 1220 m2

Mounted gypsum wall: 661 m2

Gypsum plasterboard installation: 634 m2

Cold floor covering: 451 m2

PVC casing: 344m2

Artificial resin floor coverings: 100 m2

Female shelves for interior belts: 38 pieces

Insulated steel slats: 20 pcs

Industrial gates: 4 pcs

Appliances: 18 pcs

Disperse dyed: 1871 m2

Coating and covering mazolas: 1500 m2

Flat roof thermal and acoustic insulation: 1590 m2

Insulation of the plastic foil against the surface of the pavement: 1748 m2

Insulation against the soil: 490 m2

Installation:

Installation of Lapradiator with Thermostatic Valve: 50 pieces

Gyengearam:

Assembling system: 1 system

Structural work that covers both civil and static works:

Precast reinforced concrete elements:

Concrete pillar: 39 pieces

Concrete mixer: 36 pieces

Prefabricated reinforced concrete core: 22 pieces

Hardened screwdriver:

Uttuekoer builder: 2537 m2

Prepare floor covering: 75 m2

AsphaltThe task is to carry out the execution plans on the basis of the plan documentation.

Further task:

the contractor's test is subjected to a sub-surface to the surface;

the guardian of the workplace;

Temporary epithel for water purification and epithel for electrical supply and silencersdischarging the deceased ones; - the driver of the pilot project under construction;

the abolition of all epithet and mounting work for the exhibition;

uezemprobak lefolytatasa;

management, technical or other task;

the submissive term of submission is a verdict of contractual, legal, permissible lawsuits,

all docks. Preparation of that-and the maintenance, maintenance and maintenance of the materials, structures and equipment of the assembled materials, structures and equipments. treatment and disposal of AK,

--collecting and dispatching of garbage and garbage collections and garbage collections. craftsmanship, re-usability; - the construction work of the exterior workmanship is carried out in accordance with the pre-commencement of the substation;

the restoration of seruaires, arms restraint in the coffers, coarsening epithets, the endorsements of the right and the doctrinal testsand to provide an authenticated energy certificate and an AKD; to have pool puts you into use;

Winning AT is the task of any dock. the acquirer and the acquirer of the concessionaire, who is the debtor of AK and of the debtor, who for the use of the Letesitmeny, for the purpose of introducing it to the Letesitmeny operator, a safe artificial possessorthe law of 321/2015. (. X.30) on - 46 (3) - (6) -



details see KD refusal (hereinbelow KO) process to Bidder (AT) Branch, and shall not participate.... al kalmassag justify an operator (GS), to whom the Kbt.62.- (1) - KOK one exists according to para (2). Coach (AK) excludes from the commencement of the AT, sub-contract, sub. upazolasaban who takes part in ESC, who is the stone koevetkezett the proceedings. Authentication Mod: AT, verify who takes part in the GS 321/2015 (X.30.) KR Section 4 (1) -. (2) being for the single European koezbeszerzesi document (ESPD) koeteles submission demonstrate absence refusal of the previously Kbt.62.- and that in addition, meet the Kbt.65.- in general aptitude determined by AKfor experimental purposes. AT shall test ESPD in the suitably justified sub-enterprise or body as a justification for the KOs statement contained in the Kbt.62. In ESPD, GSZ is trying to declare that the KOC pursuant to Section 59 of the Kbt is incompatible with it, and it is advised to provide the CoR with other information related to the previous one. According to -- 2 (5) of the KR, the provisional statement of the appropriate test methods accepts the explicit statement of the GSZ. In accordance with Section 69 para. (11) of the Declaration on ESPD, pursuant to Section 69 para. (4), the GSZ has to provide these databases in the appropriate sections of the form - they can be obtained by checking the KOk certificatein the case of AK, a decree of this decree, and it should also be admitted that the provisions of Annex III. es IV. Which body is eligible for the certification of the chapter. The CoC has not filed a bribe on the basis of Section 59 (4) of the Kbt. and 16. The GSZ has to declare in Section 6 (1) - (2) and Section VI.6 (4) of the KR. In the justifications, the Kbt.64.- (1) - (2), (4) para and the FR-4 Section 5 Section 8, - 10 - 12 - 16 and 14 and the regulation - 12- EKR (2) officials have apply. AK Kok preliminary statement in control throughout accept the ESPD. [KR 4-5.-] The dok.-ok, i collision submission KR Section 1 (7) on the basis of - - 7 and is possible. The degree program. tev. By order FOR USE: The building construction in carrying out economic activities inyen is the Etv. according to the names of the building industry executives. To be registered in a non-HUNGARIAN GSZ case, be registered in the 2014-2014 European Parliament and Council language XI. and perform any of the other test procedures contained in the aforementioned breast augmentation as well as if you are in the habitual residence of the contractoras well as in the country in which you are resident, by a lawyer, a lawyer, or an organization or a chamber member. As a matter of fact, in connection with the epithets of the company, the related text is in the name of the respective professional chamber of the relevant professional body of the planning service. not on HUNGARYin the case of Acting Agents, the statutory seat of the resident country, or a member of the federal state, who is licensed, legally or organizational, with a member state. Verified mode: pre-ESPD in IV. (α) (alpha) section with a suffix. Exact Verification: In the case of the GSZ settled on HUNGARY, -the AK is responsible for the registration of the data of the names of the names of the companies involved in the construction industry, as well as in the case of the names of the names of the relevant professional chamber of the Hungarian Chamber of Commerce, in the case of GSZ established on non-HUNGARY, in the European Parliament and Council Directive 2014/24 / EU XI. (excerpt) or other evidence of the records listed in his or her breastsy statement must be substantiated. [321/2015. (X.30). Paragraph (2); 322/2015. (X. 30.) Section 8 para. (2) of the Act on the Application of Time and Date: CA does not have the economic and pennies allowance here. In accordance with Article 69, full-time probationary tests shall be completed by submitting a one-week European Documentation Document (ESPD)n confirm that the requirement is appropriate.

AK will raise awareness of 321/2015. (1) (c) and Section (5) of the Decree (X.30.) Of the Hungarian Government on the basis of the provisional declarations of the appropriate test methods shall be accepted by the distinguished economic operator. In view of this, the text of the Fourth Session of the European Covenant Document IV. "alpha" (alpha) The content of the information contained in the ESPD is the responsibility of the Time Users. Article 69 (4) of the Act on the basis of the most favorable terms of reference, or, if applicable, the Kbt. Article 69 (6) of the Law on the basis of the most favorable time-limitin the form of a proper business and pensioner's allowance:

P.1 / AT 321/2015. (X.30.) Korm. Decree must enclose a declaratory statement to the Ajanlati felhivas prior to the issue, the deadline for the closing of the contract shall be determined by the competent authority of the Contracting Authority, -in a hurry to see when the time was spent on paper or when it started to work if these data were available.

[Kbt. Article 65 (1) (a); 321/2015. (X. 30.) Korm. 19 - (1) (c)] If AT does not have the document in P.1 / point because it is in a legal form that can not be filed in arrearsincluding the performance and certification of the appropriate test set out in this point in 321/2015. (X. 30.) Korm. Of the Government of the Republic of Hungary. (6) and 19 (7) of the Decree (X.30.) Of the Hungarian Civil Code, instead of or in addition to the validation methods specified in Point P.1 /



In this case, carers attention to 321/2015. (X.30.) Korm. Of Section 28 (5) and Section 30 (4) of the Act on the Protection of Classified Asso- ciated Persons. (Or persons) according to Section 65, subsection (7) of the Civil Code, and the legality of the trained legal relationship is legal.

In this case, it should be noted that thisthe person in charge and the person concerned shall point to the appropriate test procedure or test procedures for which the Beneficiary is in the interest of the entity or its predecessor. 65 (7) - (8) and (11) of this Act. The auctioneer will, at this time, draw attention to the economic operators, Article 69 (4)the organization providing the capacities of its base operator must only submit evidence for the suitability of the experiment.

It is appropriate for the suitability tests and the exclusion of the exclusionary reasons can not be found by the economic operator to submit a certificate that the same timeframe is provided by the farmer's senior co-operative-in the EDRs in electronic form. In this case, the economic operator will declare the earlier documentary evidence to be taken into account in the selection. The attorney examines the fact that the earlier statement complies with the requirements for the content of the test in a given case lawsuit so thatthe earlier verdict will indicate, where applicable, the validity of the validity of the list of beneficiaries.

1) CA. Article 57 (1) according to KDt, it is related to the present experiment. AK distributes KD on ekr.gov.hu by electronic interface.

2) Key: Section Kbt. (1) - (5) and (7), Section Kbt. 116 (6). according to KD.

3) Placeb. AK keeps it

Cime: Pecs, Időjos utca (hrsz .: 01455/88) Ideas: 6.11.2018 10:00. Results. Pecs, Time Street (hrsz .: 01455/88).

4) Appointment of the times: The crossing of the EDF system to the deadline of the deadline.

5) The date should be read in pdf format with Acrobat Reader. The timeline is read in a password, but it should not be modosithaton. Tried excerpts for excel (.xls) format

7) AT in the form of an electronic form in the EDF, it is probable that the timeline will be encoded:

a) Reader

b) Kbt ------------------------------------------------------------------------------------------------------------------------------------------------ Bey. arrow;

e) ESPD;

f) Kbt. Section 67 (4), p.

8) AT, all ATn: - Approx. (6) - 65 (65) -- (1), (3) and (4), 65 (7), 134 (5) 7) a document containing a negative content statement is also a probationary) (7) Declaration of Government Decree 322/2015. (X.30.). Section 26, Kbt. Section 134 (5)9) Attach the application to the ATk and to the case of other organizations that may be legally validated. 10) In the case of a filing in progress, enclosed with the relevant registration file simple masquerade. Electronicand in the case of a questionnaire the non-certified copy of the docks associated with it.

11) Formal probation: Kbt. Article 47 (2) and the provisions of Article 10 of the EDF Regulation.

12) AT shall attach the period of validity to the abovementioned coarse verbal equivalent to the abovementioned unclear co-signatory. There is no time for AT to give the timing of the tedious test drive.

13) Translation: AK is the translation(15) Winner with AT test - the most accurate at the time of the contract - at the bottom of the cross-section of the sub-contractor is also a comprehensive epitesi-installer responsible for bizto extend or extend the liability insurance to a certified contractor at a minimum of HUF 200, 000, 000 / min and a minimum of HUF 50, 000, 000 / barrel. Design insurance: min. 3 000 000 HUF / year, min. 1 000 000 HUF / person

16) U.S. secretary: In the case of the use of the Kbt.44, the accredited placement of the document contained in the U.S. secret is applied in the EDF for this service function. Section 75 (2)(e) and Article 81 (4) to (5) apply.18) It is imperative that the winner AT is responsible for the contractor's argument below. Provision: Indicative design. and Penzuegy's work plan. org. plan.

19) M.2. (subject to the duration of the contract); • Provision must be made in the case of KD's reschedulinghe / she is entitled to a right and a chamber of registers.

20) Ertekeles: Kbt. 76 (2) c) base.Only number of adhato points: 0 to 10 points. Ertekeles modsz. Ar: Translated Art. Minimal Criterion 2.thanks (the most inferior level 36 ho, the most favorable level 60 ho) 3 .: straight match (best level 36 ho)

21) Right: Kbt; 424/2017 (XII.19.) KR.

22) In view of the character constraint, AFits total content in KD and its AFET annexed to the EDF should be interpreted as follows:

23) FAKSZ: Dr.Turi Akos 00416.


Internet address (URL): http://www.gov.pecs.hu

Documents

 Tender Notice