Expired Tender Bulgaria ICB TOT Ref. 27785498

Contract notice: Construction work Tender in Bulgaria - 27785498

Tender notice from Bulgaria, published on 19 Oct 2018.

Executive Summary

The ?????? ???? ?????? has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 19 Oct 2018 and is scheduled to close on 22 Nov 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27785498, while the tender notice number is 455862-2018 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
27785498
Document Ref. No.
455862-2018
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
19 Oct 2018
Bid deadline
22 Nov 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45233330, 45233252, 45211360, 45000000, 45233330, 45233252, 45211360
CPV Description: Urban development construction work.
"Implementation of construction and assembly works under the project" Reconstruction and Urban Development of the Urban Environment in Dobrich ", contract BG16RFOP001-1.011-0006 for granting of the BRF under OPRD 2014-2020 with 6% vol. "
In the execution of the order should be carried out:
Main Site: On the territory of a municipalityand the town of Dobrich
"Reconstruction and rehabilitation of the street network, sidewalks and development on Temenuga Street - to provide:
- improvement of the state of the street network, the adjoining sidewalks and parking areas,
- creation of the infrastructure for cycling,
- increasing the comfort of traveling on the renewed infrastructure and improving the capacity of the road infrastructure,
- floorsafety improvement. 53 - development, landscaping, reconstruction of com. playgrounds "- the improvement of the conditions for pedestrian connections in the spaces between spaces and the inner court spaces by replacing the pavement and building new pedestrian connections in places where the pedestrian flow forms large paths in the green areas.It is aesthetically pleasing, it is an easier way to maintain the space and is a relatively economical option. Replacement of pavements for transport links and car parks is also envisaged, consisting of re-paving and placement of concrete jointing elements of a grass joint, which, although with a small percentage, improve the balance of landscapes
. 54 - development, landscaping, reconstruction of com. - Improving the conditions for the pedestrian connections in the inter-block spaces and the inner court spaces by replacing the pavement and building new pedestrian links in places such as pedestrian zones, -where the pedestrian flow forms large paths in the green areas. It is envisaged the use of different types of habitation as it is aesthetically pleasing, it is an easier way to maintain the space and is a relatively economical option. Replacement of floorings for transport links and car parks is also envisaged, consisting of re-coating and placing concretewhich will improve the landscaping balance, albeit with a small percentage,
The implementation of the site is carried out in accordance with the investment project and the technical specification - Participants are entered in the Central Professional Register of Constructors for the execution of construction works of the second group, third category and for the six lots at the time of submission of the tender, and for the foreign ones• If the participant participates as a consortium / consortium, any member of the consortium / consortium who will carry out the construction activities must have such a registration. subcontracting, the requirement is evidenced for those subcontractors, which according to typeand the works assigned to them will execute construction
When submitting a tender, participants declare compliance with this selection criterion only by filling in the relevant section in a single European Public Procurement Document (EEDOP) - Part IV, Section A " Eligibility, Field 1 "Entry into the relevant professional register" of EEDOP - The document proving the requirement is afor the registration in the TSPR to the Construction Chamber for execution of construction works of the construction category, which includes the object of the contract: constructions of the second group, third category and for the six lots. If the participant is a non-resident, he may present a valid equivalent document or declaration or certificate issued by a competent authority of a Member State of Europesor any other State party to the Agreement on the European Economic Area, proving the entry of the participant in a relevant register of that State.
Proof of compliance with the requirement shall be submitted by the participant designated as contractor or upon request in the course of the procedure - in the cases of Art. 67, para. 5 and 6 of the PPA. Documents are submittedand subcontractors and third parties, if any.
The participant should have professional liability insurance in construction with coverage in the amount of the minimum insurance amount for the object subject to the contract as defined in Art. 5, para. 2 of the Ordinance on the Terms and Procedure for Compulsory Insurance in Design and Construction (promulgated, State Gazette No. 17 of 2.3.2004).and the bid participants declare compliance with this selection criterion only by filling in the relevant section in a single European Public Procurement Document (EEDOP) - Part IV, Section B "Economic and Financial Condition", field "Insurance Policy for Risk" professional liability of EEDOP .
If the participant participates as an association / consortium, any such insurance should have everyonea member of the consortium / consortium to carry out construction works.
When the participant envisages the participation of subcontractors, the requirement shall be demonstrated for those subcontractors who, depending on the type and proportion of the contract awarded, will perform construction work. to prove the requirement under Art. 62, para. 1, item 2 of the Public Procurement Act - evidence of the existence of a set-upProfessional accountability in construction "with the required coverage - a copy of an insurance policy or equivalent, if they are not accessible through direct and free access to the relevant national database
When, for a good reason, the participant is not able to submit the requested the contracting authority, he can prove his economic and financial situation with a pomp• Documents to prove compliance with the required requirement shall be submitted by the tenderer designated as contractor or upon request in the course of the procedure - in the cases of Art. 67, para. 5 and 6 of the PPA. Documents shall also be submitted to subcontractors and third parties, if any. Specific national grounds for exclusion, whichthey should be declared in Part III. "Grounds for exclusion", section D: A. The participant should declare the absence or existence of a final judgment for an offense under Articles 194-208, 213a-217, 219-252 or 255a -260 C. B. The participant should not be related to other participants in the present procedure according to Article 101, Paragraph 11 of the PPA C. The participant should not be identified with the entry-in force a penal decree or a court decision, a violation of Art. 61, para. 1, Art. 62, para. 1 or 3, Art. 63, para. 1 or 2, Art. 228, para. (3) of the Labor Code or similar obligations established by an act of a competent authority under the law of the State in which the applicant or participant is established. No violation under Art. 13 para. 1 of the Labor Actmigration and labor mobility; E. The participant should not have the circumstances under Art. 69 of the Law on Counteracting Corruption and for Removal of the Acquired Property; F. The participant should meet the requirements of Art. 3, item 8 and Art. 4 of the Economic and Financial Relations Act with companies registered in jurisdictions with preferential tax regime, controlthe persons they have taken and their actual owners
2. The guarantee for the performance of the public procurement contract amounts to 3% of the value of the contract excluding VAT for each lot. The validity of bank guarantees / insurances should be no earlier than 30 days after the expiration of the term of the contract on the relevant lot, which is 24 months. The contract also stipulates awhich guarantees the entire amount of the advance payment when requested by the Contractor in the form of a payment order on the above-mentioned bank account / bank guarantee / insurance (free form) regarding the advance payment, which is 20% of the contractual fee. This guarantee is released within three days of repayment or drawdown of the advance and is valid for the term of the contractin the respective lot, which is 24 months. This public contract is awarded on the basis of the most economically advantageous tender. The most economically advantageous tender shall be determined on the basis of the following award criterion: an optimal price / price ratio as well as indicators including quality and environmental aspects related to thepublic procurement. First of all, the participant who has received the highest complex evaluation of the offer is ranked for the respective lot. The formula on which the "Complex Assessment" is calculated for each participant is: CO = P1 P2, where: P1 is the indicator "Technical Proposal of the Participant for Execution of the Order" with a weight of 50%; P1 = CTP1 CTP2 CTP3; CTP1- Suggested approach for qualitativeexecution of construction - up to 20 points; CTP2 - Organization for the performance of the activities of the subject of this order - up to 20 points; CTP3- Environmental Protection Measures - up to 10 points, P2 is the evaluation of the "Price Proposal for the Execution of the Order" - 50% weight.The bodies providing information about taxes are: NRA, MOEW, EA and EA "GIT"
Pursuant to Article 114 of the Public Procurement Act, at the time of the opening of thethis procedure does not provide financing for the implementation of the activities under the six separate lots of the public procurement. In the event that after expiration of three months from the date of signing a contract for each lot, the Contracting Authority has not notified the Contractor of the financing provided and the entry into force of the contract, either of the parties may request termination of the contract withoutnotice
Internet address (URL): www.dobrich.bg

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 22 Nov 2018. Bidding is closed.

This tender has been issued by ?????? ???? ?????? in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 45233330 - Foundation work for streets, 45233252 - Surface work for streets, 45211360 - Urban development construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 27785498. The purchaser document reference is 455862-2018.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.