Object of the contractConstruction work
Description: Contract notice: Construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45000000, 45100000, 45110000, 45111000, 45112000, 45113000, 45200000, 45220000, 45223000, 45236000, 45260000, 45261000, 45262000, 45300000, 45310000, 45311000, 45312000, 45313000, 45314000, 45315000, 45316000, 45317000, 45320000, 45321000, 45323000, 45324000, 45330000, 45331000, 45332000, 45333000, 45340000, 45342000, 45343000, 45400000, 45410000, 45420000, 45421000, 45430000, 45431000, 45432000, 45440000, 45441000, 45442000, 45443000, 45450000, 45451000, 45452000, 45453000, 45454000, 71000000, 71200000, 71210000, 71220000, 71221000, 71223000, 71240000, 71242000, 71244000, 71245000, 71246000, 71247000, 71248000, 71250000, 71251000, 71300000, 71310000, 71315000, 71320000, 71321000, 71325000, 71326000, 71327000, 71330000, 71332000, 71336000, 71337000, 71350000, 71351000, 71400000, 71420000, 71500000, 71520000, 71521000, 71530000, 71540000, 71541000, 71600000, 45000000, 45100000, 45110000, 45111000, 45112000, 45113000, 45200000, 45220000, 45223000, 45236000, 45260000, 45261000, 45262000, 45300000, 45310000, 45311000, 45312000, 45313000, 45314000, 45315000, 45316000, 45317000, 45320000, 45321000, 45323000, 45324000, 45330000, 45331000, 45332000, 45333000, 45340000, 45342000, 45343000, 45400000, 45410000, 45420000, 45421000, 45430000, 45431000, 45432000, 45440000, 45441000, 45442000, 45443000, 45450000, 45451000, 45452000, 45453000, 45454000, 71000000, 71200000, 71210000, 71220000, 71221000, 71223000, 71240000, 71242000, 71244000, 71245000, 71246000, 71247000, 71248000, 71250000, 71251000, 71300000, 71310000, 71315000, 71320000, 71321000, 71325000, 71326000, 71327000, 71330000, 71332000, 71336000, 71337000, 71350000, 71351000, 71400000, 71420000, 71500000, 71520000, 71521000, 71530000, 71540000, 71541000, 71600000
CPV Description: Construction work.
Site preparation work.
Building demolition and wrecking work and earthmoving work.
Demolition, site preparation and clearance work.
Excavating and earthmoving work.
Siteworks.
Works for complete or part construction and civil engineering work.
Engineering works and construction works.
Structures construction work.
Flatwork.
Roof works and other special trade construction works.
Erection and related works of roof frames and coverings.
Special trade construction works other than roof works.
Building installation work.
Electrical installation work.
Electrical wiring and fitting work.
Alarm system and antenna installation work.
Lift and escalator installation work.
Installation of telecommunications equipment.
Electrical installation work of heating and other electrical building-equipment.
Installation work of illumination and signalling systems.
Other electrical installation work.
Insulation work.
Thermal insulation work.
Sound insulation work.
Plasterboard works.
Plumbing and sanitary works.
Heating, ventilation and air-conditioning installation work.
Plumbing and drain-laying work.
Gas-fitting installation work.
Fencing, railing and safety equipment installation work.
Erection of fencing.
Fire-prevention installation works.
Building completion work.
Plastering work.
Joinery and carpentry installation work.
Joinery work.
Floor and wall covering work.
Tiling work.
Floor-laying and covering, wall-covering and wall-papering work.
Painting and glazing work.
Glazing work.
Application work of protective coatings.
Facade work.
Other building completion work.
Decoration work.
Exterior cleaning work for buildings.
Overhaul and refurbishment work.
Restructuring work.
Architectural, construction, engineering and inspection services.
Architectural and related services.
Advisory architectural services.
Architectural design services.
Architectural services for buildings.
Architectural services for building extensions.
Architectural, engineering and planning services.
Project and design preparation, estimation of costs.
Calculation of costs, monitoring of costs.
Approval plans, working drawings and specifications.
Determining and listing of quantities in construction.
Supervision of building work.
Supervision of project and documentation.
Architectural, engineering and surveying services.
Architectural and building-surveying services.
Engineering services.
Consultative engineering and construction services.
Building services.
Engineering design services.
Engineering design services for mechanical and electrical installations for buildings.
Foundation-design services.
Ancillary building services.
Load-bearing structure design services.
Miscellaneous engineering services.
Geotechnical engineering services.
Engineering support services.
Corrosion engineering services.
Engineering-related scientific and technical services.
Geological, geophysical and other scientific prospecting services.
Urban planning and landscape architectural services.
Landscape architectural services.
Construction-related services.
Construction supervision services.
Construction-site supervision services.
Construction consultancy services.
Construction management services.
Construction project management services.
Technical testing, analysis and consultancy services.
District revitalization Centrum Łodzi. Project 2 Reconstruction and superstructure of the building with demolition, land development (...) of the real estate located in Ł-dź at ul.Sienkiewicza 22 (... .)
Reference Number: ZIM-DZ.3322.26.2018
The subject of the order is:
Main Site: Łodź ul. Sienkiewicz
Realizamission n. "Reconstruction and superstructure of the building along with the demolition of the second left outbuilding and economic buildings, land development and the necessary technical infrastructure of the real estate located in Ł-dź at ul. Sienkiewicza 22, implemented in the "design and build" system.
1 The investment area is built up with cubature objects located on plot No. 161/2, at 22 Sienkiewicza Street in Łodz oo, developed along the western, northern and southern U border. The plot has an irregular shape. The entrance to the plot takes place from Sienkiewicza Street through the gate clearance of the front building. The area of the property is partly paved (pavement, ground). In the interior of the plot, at its south-eastern border, there are unsupported outbuildings (chambers and-garages) erected in 1970-1975. The plot from the eastern side is fenced, but the course of the fence does not coincide with the plot's boundary (the eastern end of the plot outside the fence).
2. The idea of the project is to adapt the building to office and service functions and the location of the community center. Revitalization of the tenement house and its adaptation to the above the functions are to provide the back of the lockand access to a preferentially priced service and office space. The operator of the day-care center will be selected through a competition for non-governmental organizations to run a ward.
3. The real estate is a fragment of the area constituting a monument protected by:
a. entry into the historical monuments of the historic urban layout and cultural landscape of "Osada Prządkow" (1827),
b. arrangements forconcerning conservation zone of the historic development of the urban development set in mpzp,
c. designation of category II protection in mpzp (designation in the plan with the symbol P1) for the front building with the outbuildings at ul. Sienkiewicza 22.
4. The investment intention is to renovate and rebuild the property at ul. Sienkiewicza 22 in Ł-dź is implemented as part of the "R" projectdistrict project Centrum Łodzi Łodzi Project 2 ", which was placed on the list of strategic investment projects of the City of Lodz constituting Annex No. 1 to Regulation No. 6045 / VII / 17 of the Mayor of Ł-dź dated 22.5.2017 regarding the preparation of strategic investment projects of the City of Ł-dź applying for co-financing from the European Union and Investment funds proComplementary councils of the City of Lodz not applying for co-financing from the European Union funds in the 2014-2020 programming period.
The contracting authority does not set a specific condition in this respect.
1. Documents confirming fulfillment of the conditions for participation in the proceedings and no grounds for exclusion, which based on art. 26 par. 1 of the Act will be required to submit the contractor whose offer is the highestj rated - on the request of the Employer within the prescribed period of not shorter than 10 days, valid as of the date of their submission.
2. In order to confirm compliance with the conditions of participation in the proceedings, the Contracting Party requests the following documents (Article 25 paragraph 1 point 1 of the Act): - information of the bank or cooperative savings and credit union confirming the amount of financial resources held or the ability to createcontractor, in a period not earlier than one month before the deadline for submission of tenders. If, for a justified reason, the contractor can not submit the documents required by the contracting party, referred to above, the Contracting Authority allows the contractor to submit other documents referred to in Article 26 (2c) of the Act
1. Contractors can apply for the order, who will show:there are no grounds to exclude from the proceedings under Art. 24 sec. 1 (obligatory grounds for exclusion) and art. 24 paragraph 5 of the Act (optional grounds for exclusion) and meet, at the level described below, the conditions for participation in the proceedings, referred to in art. 22 ust. 1 of the Act
2. Due to the limited number of characters in Section III.1.2) and III.1.3), the eligibility criteria and statements and todocuments, which must be provided to the contractor, confirming the fulfillment of the conditions for participation in the proceedings and demonstrating the absence of grounds for exclusion have been specified in the documents of the Tom I SIWZ Order for Contractors, posted on the website of the ordering party. Detailed information on the conditions of participation and grounds for exclusion and a list of statements or documents confirmingfulfilling the conditions for participation in the proceedings and the lack of grounds for exclusion can be found in items 6 and 7 of the ToR.
3. A statement constituting preliminary confirmation of compliance with the conditions of participation in the procedure and no grounds for excluding the contractor from the procedure - in the form of a single European order document (the so-called EAT). A statement made in accordance with the provisions of point 8 SIWZ. Zamawhe sends it in the form of a separate .xml file, which after importing should be completed, saved, signed and forwarded by the Contractor in an electronic version (file.pdf) to the Ordering Party at the following address:
[email protected] within the submission deadline. (Detailed instructions - see clause 7.1.1, item 8, items 11.10, 12.3 of the ToR).
4. At the request of the Employer, to confirm the lack of basicand to exclude the Contractor from participation in the proceedings, the Contractor is required to submit information, certificates, excerpt and statements referred to in - 5 of the Regulation of the Minister of Development dated 26.7.2016 on the types of documents that the Employer may request from the contractor in the proceedings for the award of the contract (Journal of Laws of 2016 item 1126)
5. If the Contractor has a registered office or a placeoutside the territory of the Republic of Poland, as well as in the case of a person whose document relates to a place of residence outside the territory of the Republic of Poland, the principles set out in - 7 and 8 above apply. Regulation.
6. The ordering party, in accordance with art. 24aa paragraph 1 of the Public Procurement Law, provides for the possibility of firstly assessing offers, and then examine themania or the Contractor, whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings.
7. The offer binding date is -90 days
8. Deadline for Completion of the Investment:
23 (say: twenty-three) months from the date of conclusion of the Contract, with the exception that the Contractor is obliged to provide the Employer with the Design Documentation necessary for the Applicationthe construction works and making such notification, Projekt / o Budowlany, together with the final decision on the construction permit (if it is required) and to hand over the Implementing Project (s) within 6 months from the date of conclusion of the Contract.
9. Amount of bid bond - 300, 000.00 PLN (in words: three hundred thousand zlotys)
10. Contractor, within 3 days from posting on the website inFormation, from the opening of offers, provides the orderer with a declaration of belonging or non-affiliation to the same capital group, referred to in art. 24 sec. 1 point 23 of the Act
Internet address (URL): http://zim.lodz.bip-e.pl/