ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Construction work. The project location is Hungary and the tender is closing on 28 Sep 2018. The tender notice number is 354707-2018, while the TOT Ref Number is 25845065. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Construction work

Deadline : 28 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25845065

Document Ref. No. : 354707-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Érd Megyei Jogú Város Önkormányzata
Address: Alsó Utca 1.
Town: Érd
Postal Code: 2030
Contact Point: Dr. Konkoly Zita

Phone: +36 23522328
Fax: +36 23522384
Hungary
Email :kozbeszerzes@erd.hu
URL :http://www.erd.hu

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 71320000, 45000000, 71320000
CPV Description: Construction work.

Engineering design services.

VEKOP-5.3.3-17-2017-00001 for implementation of the project

Reference Number: EKR000264822018

VEKOP-5.3.3.-17-2017-00001 Kodszamu, "Erd, Buvar utca hrsz: 933 ; 936, 937 real estate projects planned for real estate "

Main Site: 2030 Erd, Buvar utca hrsz: 933, 936, 937

Executing task:

The Buvar and Burkolo streets Foeldmunkas utca and kožigazgatasi hatar koeand the painters and painters of Fuvaros and Favago streets will be able to complete the construction of the Buvar and Burkolo streets.

The contractor is responsible for the execution of the construction works, according to the plan of approval of VIA FUTURA Ltd., plan design 1610/3 (2016.08).

Buvar utca

Excellent road section

590 meters long, 5.5 meters sect

Sozut telepueles are six miles from Favago Street to the traffic circle, Foeldmunkas Street and Favago Street, which is one block from the other.

Right side (deli side) jarda epitome, on the other side curled edge, the boulder crosses the road.

The 933 hrsz-u real estate school and sporting goods park and the entrance to the right side "K". On the left side, -

Painted street to Foeldmunkas street on the left side (paramented side), with parsed parking lot, with highlighted bushes, with a yard, right with "K" bushes, bushes.

Burkolo street

The well-off section is 575 meters in length and 5.5 meters in width. The Burkolo Street, now Foeldmunkas Street and Festő Street, are equipped with 3-4 m of asphalt pavement.

Sozut telepueles hat out of Favago-street from Favago Street to Festő Street, the 933 hrsz school property and sports facilities are parked in a "K" corner on the left side about 45 m long, then the Sportpalya bejarata join, then place a highlighted edge and a jar, and the right side of the "K" to the right.

Festő Street Foeldmunkas streetup on the right (unobstructed) side with a parachute park, with a raised groove, a lawn, a "K" on the left, with a lawn.

Favago Street

The well-trained section is 143 meters in length and 5.5 meters in width. The project is planned to be connected to Burkolo Street on the left side of the building. On the left side there is a 933 hrsz-u school with park access to the street with a "K"all jordan with highlighted edges. On the right side there is a bus waltz with oebo and passenger. Right on the side of the bus stop and the Buvar utca is a jewel in the street.

Painting Street

The well-trained section is

143 meters in length, 5.5 meters wide.

The beginning of the design phase starts at Buvar Street, and is connected to Burkolo Street. On the right side there is 933 hrsz-u real estate school-a car park is connected to the carriageway "K".

The school planned for 933 hrs will park a moose with a pedestrian yard, so it is not typical of the property side to plan a yard, a rocky section at Burkolo Street. the real estate designer's side of the real estate site is the planned plot of landnala

The parking lots are visible in the frame of the investment booths

Flooring:

The pavements of the streets are asphalt

The pavement of the pavement is asphalt

The buszoeboel is covered with concrete

The roofs of the jars are covered with a claddings

The continuation of VI.4.3.

In this policy, it can not be time-consuming, under-represented, and can not be taken into account in a veritable manner by an economic operator against whom-the Kbt. Article 62 (1) to (2) of the present law shall survive. Verification mode: A 321/2015. (X. 30.) Gov. (1) of Article 1 (1) of the basic Regulation, the applicant shall be required to prove in advance that he is not a party to the Kbt. Article 62 (1) and (2) of the Code of Conduct. The timekeeper is pleased with the performanceBefore the Entes were taken, the Admiral's Appointment is the Order of the Order. Sections 8, 10, 12-16. The court must state in the statement of claim that he or she fails to comply with the Kb. (1) - (2) of Article 62. The Kbt. Article 62 (1) (k), subsection (k), point (b) of the Act on the Prevention and Prevention of Early Childhood and Terrorism Financing-szolo 2017. evi LIII. 3. - 38 (a) to (b) or (d), all prospective owners shall disclose a statement containing, or including, an easy-to-read declaration; if the economic operator does not have the real owner of the bed linen, he / she shall attach a declaration to this effect. The Briefing is a bidding for the Kbt. Section 69 (4) to (7)-of this Article. A 321/2015. (X.30.) Korm. Declarations made by members of the public are also accompanied by negative content. The Kbt. In the case of the application of Article 65 (7) of the Civil Code, the order of the organization of the capacity shall be attached to the order. II. and EEKD, which proves that the capacitance is availablebundle organization does not belong to the Kbt. Section 62 para. (1) and (2) of the Exclusion Causes. For the time limit, see the Kbt. Subsection (4) of Section 67 (a) shall declare that he / she does not apply for the Contractor's fulfillment of the Kb. Section 62 of the Code of Civil Procedure. The declaration shall also be admissible if the provider has not disclosed in themy name is Alkoja. The Kbt. Section 74 (1) (b) of the Constitution provides that the time-limiter is excluded from the procedure if the exclusion occurs in the preceding paragraph. The Order of the Order Article 7 (1) of the Constitution may also enter documents issued before the commencement of the proceedings. Tender for the Kbt. Article 65 (1) (c) and Article 32 (2) of Section 32 para. a base booklet-in the name of the relevant Chamber of Commerce in the name of the relevant Chamber of Commerce in the name of the relevant technical service related to the bachelor's affiliation, as well as the economic operators of the epitomous industry, as well as in the non-Hungarian sub-sectorin the case of settled economic operators, in the Registered State of the resident country, or in the country of resident, subject to a permit, a right or an organizational or chambers clause. A 321/2015. (X. 30.) Paragraph 1 para. (1) of the Basic Law shall, with the EEKD's statement, provisionally certify that it complies with the requirements of the Subparts. In this case, a good statement is given by the excelent host, ie ESPD IV. Respect ": The" Subtle Signal "subsection must be extracted and no further data will be retrieved. Verification Mod: Checks in the Registry are checked by the Provider. In the case of a designer, you must provide a list of attorneys in the Chamber or submit the Chamberand tagagrol solely certified. In the case of a non-Hungarian registered economic operator, the European Parliament and Council Directive 2014/24 / EU XI. (extract) or any other certificate or statement must be substantiated.

1. Providing a timely reminder: - Approx. Article 66 (6) (a) and (b), even in the case of negative content; - Kbt. 66th- (2) statement (electronic form); - the Kbt. Article 65 (7) Declaration with the content indicated therein, if applicable, a negative statement; - if applicable, the test case for the test subjects is the Kbt. As in Section 35 of the Kbt. According to Section 44, the U.S. secret is compelled, and an arbiter declaration is justified by theArticle 11 (4) of the EDF Regulation. according; - 321/2015. (X.30.) Government Order no. Documents pursuant to - 13 or a non-declaration; - persons entitled to register for Alairoasi cimpeldanya and uegyved, or a subordinate lawyer under the law of a Chamber Judge.

2. All the relevant information and testimonials to the list of qualified timers are strictly enforced.

3. Yes. Article 35 (8)4. The Provider shall apply the Kbt. Section 75 (2) (e).

5. AK will pay 60 days per day during the period of time spent in Schedules IV.2.6 of the Recorder, subject to the Kbt. Article 81 (11).

6. The language of the eljaras is Hungarian. In the meantime, all documents, documents, declarations and information submitted in foreign languagesthe responsible Hungarian translator must be attached.

7. Period of time for the selection of applications for a low ar or exam review resumes the timing of the survey (Section 81 (4)). For further information, Section 79, for the date of the contract, the Kbt. Article 131 (6) and (8), the time limit for the commemoration of the co-european time is iranyado.in bold, and in the non-compliant versions of the Procurement Document, the Kbt. and the Civil Code. I'm afraid of you.

10. The use of the EDF can be done by: https://ekr.gov.hu/portal/tamogatas; and http://nekszt.hu/tamogatas/ The EDF will be published on 27/2017. (XI.6.) MVM is based on NEKSZT Ltd., http://nekszt.hu. The system is synonymous with the use of the systemn N / A N / A N / A N / A. The rescheduled period is the complexity of the project (planning and implementation) and the organizational problem. It is not possible to avoid problems. It is an epithet for a job, a job vacancy. In case of a finer constructor, the responsible person would not be able to be contacted.

12. A timer of a timely and improper co-pilotalso lead the test. The designer is trying to propose the time magazine for his full-range playthrough.

13. Erectile Mode:

1. (pronounced di): translate gold 2. (coefficient of interest): translate gold. 3. (for the duration of the period): straightforward placement For the purposes of point 2, the sponsor shall certify to the holder that he has the right tothere is space to use. The timekeeper must provide the place where the burrowing materials from the workshops are lawfully placed on the asphalt floor and the layout on which they are to be transported. The timekeeper must provide the place from which the asphalt mixes and concrete mixes are delivered to the given working lunch and the layout. That's fineThe figure shall be expressed in km per round, rounded to the decimal point, the strengths given in the above-mentioned coefficient of gravity to the decimal point. Pontagesar: 0 to 10 points. documents.

14. The timekeeper must attach the permission of the coercive force to the permission of the co-worker, in order to confirm that he is entitled to the task of the deceased person. THEthe list of beneficiaries referred to in point III.2.2. the liability statement in question must be stated on the application or extension file. The use of the declarations of the declarations is not a test. FAKSZ: dr. Czako-Salusinszky Reka (registration No. O0987)


Internet address (URL): http://www.erd.hu

Documents

 Tender Notice