ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Construction work. The project location is Hungary and the tender is closing on 28 Sep 2018. The tender notice number is 354705-2018, while the TOT Ref Number is 25845063. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Construction work

Deadline : 28 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25845063

Document Ref. No. : 354705-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Érd Megyei Jogú Város Önkormányzata
Address: Alsó Utca 1.
Town: Érd
Postal Code: 2030
Contact Point: Dr. Konkoly Zita

Phone: +36 23522328
Fax: +36 23522384
Hungary
Email :kozbeszerzes@erd.hu
URL :http://www.erd.hu

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 45000000
CPV Description: Construction work.

VEKOP-5.3.3-17-2017-00009 for implementation of the project

Reference Number: EKR000260112018

VEKOP-5.3.3.-17-2017-00009 building code "Ercsi ut Szabadsag ter (Ilona utca) - M6 autopalya "Main site: Ercsi ut Szabadsag ter (Ilona utca) - M6 autopalya

The contractor is responsible for planning permission of VIA FUTURA Kft. Schedule 1610/2 (2016.08.)This is the reason for the execution of the project:

Ercsi ut

The Ercsi ut enclosure reinforcement

1 490 meters in length, 7.0 meters in width, with maras and new asphalt bricks, with a local full scale structure. At the end of the road a 1.25 meter wind turbine is to be dropped.

From the beginning to the 0 690 km slope on the right side footpathitendő. This is due to the planning of the planned sidebuses and bus parks on both sides. 2.00 meters of windy footpaths are open.

From the beginning of the design phase, the planned 7.00 m winding cover is on the left side 0 535.45 km, on the right side 0 543.50 km on the slope K it should be developed with a groove. Up to the above sectional limits, the existing arophic system isto skip. This is the case with the 3 j. the beginning of the section, on the left side, the bussoebloet and the overflowing island on the left side of the section of the 0 022, 15 - 0 042, 60 km slopes, and the connecting joints . A 0 087.83 - 0 141.93 km from Szelveny on the right side of Kos Karoly SzakParallel parachute pools must be established before the school. The parks have to be taken into account in the development of the Vocational School, with a varied capuccino.

At 0 714.60 - 0 736.14 km of mountaineers, on the left side of the car you will find the overflowing island of the old buszoeboel with atepitesevel. At the 0 573.81 - 0 593.89 km in the mountaineering area on the right side of the bus to the 0 718.15 -0 739.15 km of huskies. The 0 772, 08 - 0 805, 08 km of horseshoes on the left side of the Sportcentrum atepiteset, due to the increasing tendency of the slope, creates a bus park with a 2 park parking place. For the same reason, the 3 km bus park on the right side of the 0 769.36 - 0 823.36 km slopes should be on the right. Bus parks have to be established with a yard connection. 1 439, 64 - 1 460.64 km left on the left side of the island and 1 443.50 - 1 464.50 km on the right side of the slope on the right side of the buszoeboel shore and uplifting island.

Buszoebloek and bus parks are to be buried with concrete slabs. The gardens and the overflowing islands are to be used with asphalt pavements.

During the reconstruction of the Ercsi ut, the pedestrian precinct before the school is refurbished, lassito lantitoshould be brought before it. The pedestrian crossing point at the cemetery next to the cemetery must be dropped.

In the 0 060.60 - 0 063.60 and in the 0 688.40 - 0 692.90 km slopes, the outskirts of the pedestrians should be placed on the side of the tactile casing elements

With the pedestrian crossing point you have to make sure that you are in the form of a gentlemen, and that you have to prove it with a remarkable record.

Julia Street

Julia Street-the culmination of the Ercsi ut utca is planned.

At the beginning of the planning phase of the Julia Street, with the connection of the Ercsi utca, the site simulation and the correction of the height are exuberant. On the right side of the existing rolling rivers, the 1.00 m slope of the existing enclosure (

5.00 m) is suffused. The street has an excellent section,

125 meters in length, 6.0 meters in width, The cemetery for the cemetery in Erd, probably - 0 009.25 km. - to the left of the intervention site, on the left is a 2.00 m wide yard.

The area of the planned parking areas is Julia Street 0 037.52 km, 0 068.38 km and 0 114.73 km in the direction of the village of Szelenc. A 3 j. in the area of the Ercsi ut 0 830, 21 km, on the left hand side,

Kthe continuation of the VI.4.3. It is not permissible to provide a time-consuming, undervalued, and not eligible, economic operator to whom the Kbt. Article 62 (1) to (2) of the present law shall survive. Verification mode: A 321/2015. (X. 30.) Gov. (1) (1) of the Statute of the European Union-the document must state in advance that it does not belong to the Kb. Article 62 (1) and (2) of the Code of Conduct. Prior to receiving the fictitious result before the solicitous adoption of the righteous person, Sections 8, 10, 12-16. The court must state in the statement of claim that he or she fails to comply with the Kb. Article 62 (1) to (2)there are no precarious reasons. The Kbt. Article 62 (1) (k) (k) (b) of the Act on the Prevention and Prevention of Prevention and Prevention of Terrorism. 3. - 38 (a) to (b) or (d), all prospective owners shall disclose a statement containing, or including, an easy-to-read declaration; if the farmerthe sagi actor has no real owner of the toothbrush, so make a declaration to do so. The Briefing is a bidding for the Kbt. (4) to (7) of Section 69. A 321/2015. (X.30.) Korm. Declarations made by members of the public are also accompanied by negative content. The Kbt. In the case of the application of Article 65 para. (7), aby attaching the capacity of the organization to the organization, the order of the Korm. II. EEKD, which proves that the capacity of the organization is not a part of the Kbt. Section 62 para. (1) and (2) of the Exclusion Causes. For the time limit, see the Kbt. Subsection (4) of Section 67 (a) shall declare that he or she does not claim the contract termplease see the Kbt. Section 62 of the Code of Civil Procedure. The declaration must also be submitted if the name of the sub-business known in the art is not disclosed in the list. The Kbt. Section 74 (1) (b) of the Constitution provides that the time-limiter is excluded from the procedure if the exclusion occurs in the preceding paragraph. The Order of the Order Article 1 (7) of the ConstitutionI can also go to the documents that were available before the start of the contract. Tender for the Kbt. Article 65 (1) (c) and Article 32 (2) of Section 32 para. based on the design services related to the bachelor's thesis (charter specialist), as well as the epitomous industrial designthe evolutionary economic operators in relation to the Etv. as well as in the case of non-resident operators established in the country of establishment or in the country of their place of residence, by virtue of a license, right or organizational or chambers of titleendless experiment. A 321/2015. (X. 30.) Paragraph 1 para. (1) of the Act on the basis of the EEKD shall provisionally certify that it complies with the requirements. In this case, a good statement is given by the excelent host, ie ESPD IV. Resz "α:" The subtle sign of the oesszesvivalence aspect "must be extracted, the other partthey do not. Verification mode: The list of roles that are listed in the register is checked by the provider. In the case of a designer, you are asked to provide the courtesy of the Chamber of Commerce or to submit the proofs of the Chamber's membership in the Chamber. In the case of a non-Hungarian registered economic operator, the European Parliament and Council Directive 2014/24 / EU XI. (excerpt) from the registers listed in his /-or any other proof or statement must be substantiated.

1. Providing a timely reminder: - Approx. Article 66 (6) (a) and (b), even in the case of negative content; - Kbt. Article 66 (2) statement (electronic form); - the Kbt. Article 65 (7) Declaration with the content indicated therein, if applicable, a negative statement; - where appropriate, testosterone megallapodas the Kbt. Section 35, and as specified in the Procurement Documents, the Kbt. According to Article 44, the U.S. secretary is accused and justified by Article 11 (4) of the EDF Regulation. according; - 321/2015. (X.30.) Government Order no. Documents pursuant to - 13 or a negative declaration; - persons entitled to register for Alairoasi cimpeldanya and uegyved or kAmaranth submarine counterparty.

2. All the qualifications and proofs to the list of qualified timers are strictly the same. 3. The body of the body according to Article 35 (3) (3) of the Civil Code is excluded. Section 75 (2) (e).

5. The CA has a period of 60 days during the period of time spent in the idle time spent in point IV.2.6 of the cloud, -taking into account the Kb. Article 81 (11).

6. The language of the eljaras is Hungarian. In the meantime, the responsible Hungarian translator must be attached to the document, document, statement and information submitted in all foreign languages. Period of time for the selection of applications for a low ar or exam review resides in time (see Section 81 (4)).8. To the oesszegezes-rt a Kbt. Section 79, date of the contracting party's date of the Kbt. Section 131 (6) and paragraph 8, for the deadlines related to the commencement of the work, the time of the European elections is about 9:00 am in the deadline for application and the deadline for not filed in the contract documents. and the Civil Code. I'm afraid of you.

10. The use of the EDF can be done by: https://ekr.gov.hu/portal/tamogatas;-and http://nekszt.hu/tamogatas/ The EDF will be published on 27/2017. (XI.6.) MVM is based on NEKSZT Ltd., http://nekszt.hu. Regardless of the artificial nature of the system, the system does not give rise to an acronym.

11. The rescheduled period is the complexity of the project (planned and executed) and the organizational problem., a work lunch. In case of a finer constructor, the responsible person would not be able to be contacted.

12. The timekeeper is a timely and improper co-driver of the test, which includes the design test. The designer is trying to propose an update to the full range of heresies. 13. Ertekeles method:

1. (vallalkozoi dij): translate gold 2. (coerteherhelesbecause of it): translated gold content 3. (duration of nt): straight gold. For the assessment of point 2, the runner must acknowledge receipt of the statement that he is entitled to use the specified landing site. The timekeeper must provide the location where the landfill materials from the individual trenches are legally placed asphalted and the road planI'm traveling. The timekeeper must provide the place where the asphalt mixes and concrete mixes will be transported to the given packet and the draft plan. The lengths of the lines in km are to be rounded to one decimal place, the number of points given in the basis of their total weight is the same. Ponthatar: 0-10 points Documentmentions.

14. The timekeeper must attach the permission of the coercive force to the permission of the co-worker, in order to confirm that he is entitled to the task of the deceased person. The time-table is given in Section III.2.2. the liability statement of the claim or request for extension should be stated in the statement. The use of the declarations of the declarations is not a test. FAKSWith: dr. Czako-Salusinszky Reka (Lajstromszam OO987)