ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Construction work. The project location is Hungary and the tender is closing on 24 Sep 2018. The tender notice number is 354700-2018, while the TOT Ref Number is 25845058. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Construction work

Deadline : 24 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25845058

Document Ref. No. : 354700-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Érd Megyei Jogú Város Önkormányzata
Address: Alsó utca 1.
Town: Érd
Postal Code: 2030
Contact Point: Dr. Konkoly Zita

Phone: +36 23522328
Fax: +36 23522384
Hungary
Email :kozbeszerzes@erd.hu
URL :http://www.erd.hu

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 45000000, 71320000, 45000000, 71320000
CPV Description: Construction work.

Engineering design services.

VEKOP-5.3.3-17-2017-00008 for implementation of the project

Reference Number: EKR000132842018

VEKOP-5.3.3.-17-2017-00008 Kodszamu, "Erd ket pontjan (Daroczi utca, Gardonyi utca), the main building site of the project: Erd, Erd, Bajcsy Zsilinszky ut. Daroczi utca crossroads

Erd, Bajcsy Zsilinszky street Daroczi streetmodernization of intersectional traffic engineering

The contractor is responsible for the implementation of the plan of the VIZKOeRTERV Kft. VKT / 2016/51 planned plan (2016.10).

The construction task:

Crossroads of Erd, Bajcsy-Zsilinszky ut and Daroczi Alsoerd-sor streets with the outbound pedestrian crossings.

The design sketch on the crossroadsrough cocoon with approx. 100-100 m from Bajcsy-Zsilinszky in

6, 5 meters wide and approx. 50 and 60 m in the crossing street. The Barackfa street connection is also to be built on the Alsoerd-sor street (5.5 to 6.0 meters windy). The Daroci Street is 5.1-5.65 meters windy.

The pavements of the roads should be watered and reinforced on the eroded sections.

Bajcsy-Zsilinszky ut and Daroczi utca, delre talalhato terueleten pollers out of place can be added from the Bajcsy-Zsilinszky ut and Daroczi utca can be arranged in the parking lot. During the closing phase of the Daroczi street flag, the parking area must be at least 10 m in length. - The Bajcsy-Zsilinszky roadI can get busoffs and busbars, and join the roundabouts of the knotter. The designer of the csopopont with the flagpole rules and the pedestrian and the busavall, which is currently not standard, is in the best interest of the buses and coaches, with the buses on the busses and the buses. The busoffs will be halado jardareplenishment of sections. The buszoebloek must be skinned with a basalt concrete cover.

During the design phase, there are a lot of teletypes atepitese succulent.

According to the actual traffic volume, you have to test the signal lamp phase plan. The control of the traffic light on the traffic light is to be carried out.

The technical design of the pilot project must be carried out according to the same designbased on the concession, must be obtained and after the completion of the construction, the corresponding levels of experimentation have to be verified by the signatures of the Moravia.

The formation of crags in the eroded sections of the Daroczi and the Alsoerdősor streets is exaggerated by the existing faces; Unitef'83 Zrt; a complex design for the eruption of water drainage; which extendsand also for the present design floor space! Under the enclosed part of the ridge there are a long stretches of long channels, awnings, auxiliary beds for Unitef'83 Zrt; should be drained in accordance with the drafting plan. The arches along the Bajcsy-Zsilinszky road should be pushed into the arm.

In the procedure, it is not possible to provide a timely, subtle, and inexplicable,, against whom the Kbt. Article 62 (1) to (2) of the present law shall survive. Verification mode: A 321/2015. (X. 30.) Gov. (1) of Article 1 (1) of the basic Regulation, the applicant shall be required to prove in advance that he is not a party to the Kbt. Article 62 (1) and (2) of the Code of Conduct. The timer is the fist resultbefore the advent of the doctrine, the Adjuster's nickname is the Order of the Order. Sections 8, 10, 12-16. The court must state in the statement of claim that he or she fails to comply with the Kb. (1) - (2) of Article 62. The Kbt. Article 62 (1) (k) (k) (b) of the Act on the Prevention of Pre-Trial and Prevention of Terrorist Financinggakadalyzasarol szolo 2017. evi LIII. 3. - 38 (a) to (b) or (d), all prospective owners shall disclose a statement containing, or including, an easy-to-read declaration; if the economic operator does not have the real owner of the bed linen, he / she shall attach a declaration to this effect. The recipe is a recipe for the appt. (4) to (7) of Section 69. A 321/2015. (X.30.) Korm. Declarations made by members of the public are also accompanied by negative content. The Kbt. In the case of the application of Article 65 (7) of the Civil Code, the order of the organization of the capacity shall be attached to the order. II. and EEKD, which proves the capacitythe organization is not a part of the Kbt. Section 62 para. (1) and (2) of the Exclusion Causes. For the time limit, see the Kbt. Subsection (4) of Section 67 (a) shall declare that he / she does not apply for the Contractor's fulfillment of the Kb. Section 62 - Taking the hypothesis of exclusionary grounds. A statement must also be made if the timeframe has not been released by the mrenowned subprojects. The Kbt. Section 74 (1) (b) of the Constitution provides that the time-limiter is excluded from the procedure if the exclusion occurs in the preceding paragraph. The Order of the Order Article 7 (1) of the Constitution may also enter documents issued before the commencement of the proceedings. Tender for the Kbt. Article 65 (1) (c) and Article 32 (2) of Section 32 para.-based on the design service related to the epithets of investment projects (the charter of the charter company), as well as the traders in the epitomous industry, in relation to the Etv. as well as the non-compliant-In the case of a host country established on HUNGARY, the person in the country of establishment or in the country of residency is entitled to a permit, a right or an organization or a chamber member. A 321/2015. (X. 30.) Section 1 para. (1) of the Law on Fundamental Rights shall, in the case of the EEKD, provisionally certify that he /

gi Koevetelmenyeknek. In this case, a good statement is given by the excelent host, ie ESPD IV. Resz "α:" Subtle flagship aspect "section must be enclosed, no further rows are verified. Verification mode: Checks in the register are checked by the administrator. In the case of a designer, you must enter the directory list or enter the directoryto get the tags of the Chamber. In the case of an economic operator established on HUNGARY, in the case of the 2014/24 / EU European Parliament and Tanzanian language XI. (extract) or any other certificate or statement must be substantiated.

1. The timing is reshaping:

Kbt. Article 66 (6) (a) and (b) statement, noeten is;

Kbt. Declaration pursuant to Article 66 (2) (electronic form);

the Kbt. Article 65 (7) Declaration with the content indicated therein, if applicable, a negative statement;

If necessary, please refer to the Kbt. As in Section 35 of the Kbt. According to Section 44, the U.S. secret is accustomed to, and is to be avoidedis justified by Article 11 (4) of the EDF Regulation. according;

321/2015. (X.30.) Government Order no. Documents pursuant to - 13 or a non-declaration; Persons entitled to register for Alairo alairasi cimpeldanya or. uegyved, or a subordinate lawyer under the law of a Chamber Judge.

2. All the qualifications and proofs to the list of qualified timers are strictly the same.

3rd PPA.35 (8) of the Constitution.

4. Tenderer applies the Kbt. Article 75 (2) (e).

5. AK will pay 60 days per day during the period of time spent in Schedules IV.2.6 of the Recorder, subject to the Kbt. Article 81 (11).

6. The language of the eljaras is Hungarian. In the meantime all documents, documents and declarations submitted in foreign languagesyou need to attach the responsible Hungarian translation to the information.

7. Period of time for the selection of applications for a low ar or exam review resumes the timing of the survey (Section 81 (4)). For further information, Section 79, for the date of the contract, the Kbt. Section 131 (6) and (8), for the deadlines related to commemoration, the koezep-european time is the irelandado.

9th In the above mentioned date and in the non-regulated quotations of the co-procurement document, and the Civil Code. I'm afraid of you.

10. The use of the EDF can be done by: https://ekr.gov.hu/portal/tamogatas; and http://nekszt.hu/tamogatas/ The EDF will be published on 27/2017. (XI.6.) MVM is based on NEKSZT Ltd., http://nekszt.hu. The system is artificial, ifin conjunction with his report, he or she is unable to give up. The reset timer is provided.

12. The timekeeper is a timely and improper co-driver of the test, which includes the design test. The designer is trying to propose an update to the full range of heresies.

13th Erectile Mode:

1. (vallalkozoi dij): translated arayositas 2. (coerstereherlesles): translate gold. 3. (without duration): straight gold. For the assessment of point 2, the runner must acknowledge receipt of the statement that he is entitled to use the specified landing site. Provider must provide the location where the landing material from the individual knotpoles is legally placed asphaltthese, as well as the roadmap on which to travel. The timekeeper must provide the place where the asphalt mixes and concrete mixes will be transported to the given packet and the draft plan. The lengths of the lines in km are to be rounded to one decimal place, the strengths given in the above-mentioned coefficient of mileage are based on their respective criteria. Pontagesar: 0-10 Mont The kepletek a koezbes. documents.

14. The timekeeper must attach the permission of the coercive force to the permission of the co-worker, in order to confirm that he is entitled to the task of the deceased person. The time-table is given in Section III.2.2. the liability statement in question must be stated on the application or extension file. The declarations of the declarationsits use is non-testing. FAKSZ: dr. Czako-Salusinszky Reka (registration number OO987)
Internet address (URL): http://www.erd.hu

Documents

 Tender Notice