Contract notice: Construction work Tender in Bulgaria - 25783302
Tender notice from Bulgaria, published on 11 Aug 2018.
Executive Summary
The ?????? ???????? has issued a Tender notice for the procurement of a Contract notice: Construction work in the Bulgaria. This Tender notice was published on 11 Aug 2018 and is scheduled to close on 14 Sep 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25783302, while the tender notice number is 352384-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45000000 CPV Description: Construction work " Completion of finishing works for repair of Day Care Center for children and young people with disabilities, town of Sevlievo" Subject of this public procurement within the meaning of Article 3, paragraph 1, item 1, letter "b" of the PPL is construction performance. The title of the public procurement contract is "Execution of finishing repair works at the Day Center for Children and Young People with Disabilities"Main site: The territory of the municipality of Sevlievo - The building for the provision of social services was built in 2012, located at the town of Sevlievo, Sevlievo, 5. Gocho Moskov Str. It is a massive two-storey building without a basement. The structure of the building is made of reinforced concrete. The steelworksElements such as foundations, columns, beams, rectangles, slabs are made monolithic. The walls are made of brick masonry of 25 cm for exterior walls and 12 cm for partition walls. The internal partition walls are made of double gypsum plasterboard with double insulation construction. The roof construction is made of reinforced concrete, covered by rolled two-layer waterproofing. Construction and installationProject work includes: 1. Part AC - partition on the second floor: 1) Supply and installation of aluminum joinery: Aluminum door frames for interrupted thermal doors and double glazing will be installed. On the facade inside the facade is provided with plaster and painted with latex. 2) Flooring: There is a mortar cement mortar M 300 D = 4 cm on floors. Flooringfrom terracotta in the service rooms and granite flooring in the foyer and the rooms 3) Partitioning / facing: The following are envisaged: - installation of partition walls made of 12, 5 cm double layered double layer with thermal insulation - 30 m and without thermal insulation - 80 m, - plasterboard with metal structure free standing - 15 m, and directly fixed - 130 m, - plasterboard ceiling cover on mesuspended ceilings made of minerals panels 600/600, - ceramic tile lining in the service rooms 4) Finishing SMP: The walls and ceilings of all rooms will be plastered, primed and painted with latex three times - 555 m Heating system: - For all radiators a radiator valve with thermostatic head and a safety valve for regulatorof the resistance, - to build the entire distribution network. Parts C and K: The building is supplied with water from the street water supply and connected to the street sewers. All water and sewerage installations are built on the 1st floor. Supply and installation of polypropylene pipes with alum. insert - 20 mm, PVC pipes Ф 110 and Ф 50 for sewerage and installation of sanitary fittings on the second floor (forof this order). In the vicinity of the building there is mounted a street fire hydrant in accordance with Ordinance No I-1971 on construction and technical rules and fire safety standards of the CAB and CIPD since 2009 (Amended, SG, 75/2013 . 3. Electro part: Lighting and contact installation: The external power supply of the site is existing.to the main switchboard - GRT, is carried out by LV cables. From the main switchboard, GRT is powered by the 2nd floor. The internal electrical installation of the building on the first floor is built. It is planned to build the installation on the second floor, as well as installation of lighting fixtures, switches and sockets. Lighting calculations for lighting installations are doneusing the coefficient of utilization method and applied in the implementation of the lighting installations. The power and type of luminaires are selected to achieve normal illumination and normative quality indicators at a balanced power consumption. Lighting fixtures LOT 2х18W, 1x58W, 230 V, IP-21, with ECPA are provided. Emergency lighting fixtures are provided-EXIT 8 W with acoustic. battery. All contact outlets are provided and terminated on "Shuko" type contacts All of the contacts are with earthing terminals The lightning protection of the building is built through a lightning net The conductor is a concrete iron 4 Part OV - Building installation, The participant the grouping that will perform the CMP) must be entered in the Central Professional Registerthe construction contractor for the first group, the 5th category according to the Rules for the procedure for entry and maintenance of the Central Professional Register of the builder, and if he is a foreign natural or legal person, he is entitled to (under his national law and subject to mutual recognition) to perform the subject matter of the procurement. Demonstration: When submitting the tender, t declares compliance with the requirement by stating in Section IV (A) (1) of the EEDOP group and the category of building sites for which it is entered in the Central Professional Register of Builders as well as the number of the certificate of entry and the date of validity, and a foreign natural or legal person indicates the document / grounds on which it is entitled (according to its national lawand under the conditions of mutual recognition) to fulfill the subject of the order. Under the terms of Art. 67, para. 5 of the PPA, the contracting authority may require documents proving the information declared in EEDOP - a copy of a valid certificate for entry in the Central Professional Register of the builder or an equivalent document for the foreign participants certifying the right of correspondence(in accordance with its national law) to perform the subject matter of the contract. Under the terms of Art. 67, para. 6 ppl before signing the contract the selected contractor shall submit the documents mentioned in the previous sentence (if not presented in accordance with Art. 67, para. 5 of the PPA) participant (respectively member of the consortium that will carry out construction works) must have valid Professional Insuranceconstruction responsibility "for the construction of the constructions - for the 1st group, 5th category, according to Article 171, paragraph 1 of the TDA with a minimum insurance sum according to Article 5, paragraph 2 of the Ordinance on the terms and procedure for compulsory insurance in the design and construction for the construction category according to the construction - subject of the public procurement, or an equivalent for a non-residentthe law of the country where it is established. For the participants there should be no justification for the removal of Art. 54, para. 1 and Art. 55, para. 1 of the Public Procurement Act, Art. 3, item 8 of the Economic and Financial Relations Act with the companies registered in preferential tax jurisdictions, the persons controlled by them and their actual owners and Art. 101, para. 11 of the Public Procurement Act. In the procedure-a participant meeting the conditions of Art. 10, para. 1 of the Public Procurement Act and the requirements of the contracting authority. The grounds for removal shall be applied until the expiration of the terms under Art. 57, para. 3 of the PPA. Where a participant is a grouping of natural and / or legal persons, the grounds for exclusion are also applicable to each member of the grouping. When a participant provides for the use of subcontractors or withrefers to the capacity of third parties under Art. 65, para. 1 of the PPA, the grounds for elimination shall also apply to subcontractors and third parties. According to Art. 67, para. 1 and 4 of the PPA when submitting the tender, the participant declares the lack of the grounds for elimination and the compliance with the selection criteria by presenting the ENEDOP and the documents are presented under the conditions of Art. 67, para. 5 and para. 6 ot ZOP. Internet address (URL): www.sevlievo.bg
The bid deadline for Contract notice: Construction work was 14 Sep 2018. Bidding is closed.
This tender has been issued by ?????? ???????? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 25783302. The purchaser document reference is 352384-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.