Contract notice: Construction work Tender in Hungary - 25579524
Tender notice from Hungary, published on 04 Aug 2018.
Executive Summary
The NEMZETI KÖZSZOLGÁLATI EGYETEM has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 04 Aug 2018 and is scheduled to close on 11 Sep 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25579524, while the tender notice number is 340375-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45000000, 45210000, 45214000, 45000000, 45210000, 45214000 CPV Description: Construction work • Building construction work • Construction work for buildings related to education and research • Ludovika Szarnyepuelet atepitese Reference Number: EKR000463632018 Ludovika Szarnyepuelet atepitese Main Site: 1083 Budapest, Ludovika ter 1. The eljaras targya a műemleki under the auspices of the Ludovika Szarnyepuelet, which is the hallmark of the University of Szannyaeducated, educated, and more, listening to the silence of listening. The function of the ephemeral remains an educated lesson. With the atomic structure, it does not jar, cel at the wall of the wall, only at minimal terueletes, new epitome. Cel is the preservation of the coverings and arrows, with the least possible atomicity to make the answer to the demandssa. The epic is four levels. In the basement, it remains unchanged in almost the present function of the oessz. In the current gym and in the gym, you will find more beautiful gymnasiums, with a variety of possibilities, with lobbies, with a delightful terrain, waterbeds, and cemeteries. Here I can find the work of a dog. The heating system of the epuelet varies, instead of being heated-(a warm gazelle ceases to exist), so at this level a heat cavity is formed with superalloys, utilizing the existing heating elements in the floor. In the basement, you will find more space and more space for the people who are in the basement. New functions: language rooms 3 pieces and 1 piece of room for study, as soon as the senior diacryclub is placed in a test space with the restoration of the original syntax. At this level you can find the server spaces, levels of tractus with feldspar. Pince walls must be provided with a waterproof and WTA plaster. On the foeldsin teruelet, typically the original function remains. Here is the gym of the great gym, the restaurant with its connected kitchen, thez uj buefe to serve its places. At the restaurant terrace there is a new technology system k-zuel. The upper level of the coat of arms is also rebuilt. In the classrooms there are offices for offices, with 4 single-service offices. The office occupation of the bourgeois department is also on this level. The first floor is the office space of the educator's office. There is one that is to be found here, according to the design programsenior and departmental executives, teaching jobs, senior, senior management, and workstation offices. Office blocks are equipped with kitchenware, kitchenware and wetrooms. The second floor is the level of education. The educator is a small group, with a classroom. 20, 30, 40, 50 person seminar rooms were housed. Certain classrooms indicated on the plan will temporarily function as an office space. A megnoebecause of the increase in water, the water blocks must be kept up, so that they are atepites. Along the basement there is also a movable toilet in each floor. In the roof-room there is currently only a boiler room. As the gas turbines cease to be used for the liquid-cooled condition, the refrigerators are equipped with the equipment of the refrigerator. When the boilers are broken, the installed boiler houses are brokens fresh air inlet mounted cocks. The coolers in the interior are demanding a large amount of fresh air, thus eliminating the celestial "celestial" roofs from the roof, which are covered with a lamellar rope in the same slit as the roof slope. its full set is just the first raisein the office spaces and in the server spaces with a VRV system with overlapping portholes in the upper part of the box, only optional chassis is available. Other roofs of the roof area remain intact, and the ventilation machines to be installed in the roof top do not have epithelia. The roof structure, cover, and badge of the roof with the cell of Allagmegovac recruits in the soft places. The task is further downteaching and maintenance of the program. The standard of the parameters in the reference test method is as follows: - net basic floor: 8386 m - teaching room for children: 774 persons - net office function: 1878 m The standard room is included in the technical brochure. data and evidenceas mod: Kizaro okok: - In this policy you can not be a time-consuming, undervalued, and can not, in any case, be validly verified by an economic operator against whom the Kbt. (1) of Section 62. - The economic operator may not be a time-consuming, indefinite, and may not be eligible, even if it is against the Kbt. 62 (2) of the Constitutionn is limited in scope. The Kbt. Section 74 (1) (b) of the Rules of Tender shall exclude from the commemorative the time-maker, the sub-contractor or the eligible body, who is responsible for the reasons for the exclusion. Article 67 (1) of the Constitution, with regard to time-keepers and, where appropriate, the opportunity(hereinafter referred to as the ESPD) shall declare that the exclusionary reasons are unrelated. Please refer to the Kbt. 69. - The Hungarian citizen (s) and, where appropriate, the economic role of the residentshoot in relation to 321/2015. (X.30.) According to Section 4 and Section 8 of the Order of Government (hereinafter: 321/2015. Kr.). The grounds for exclusion contained in Article 62 para. (1) and (2) are not met. In the case of a resident of Hungary who is not established in Hungary, the date is 321/2015. (X.30) Kr.4. and declarations and declarations pursuant to Section 10 of the Act on the Protection of Human Rights and Fundamental Freedoms. The date of the declarations is not-it may be possible to postpone the birthday of a newcomer by daylight. A 321/2015. (X.30.) Section 15 para. (1) of the Criminal Code for the sole purpose of submitting a legally valid letter to the sole supplier of the sub-contractor or body shall only submit the single European co-procurement document to the Kb. 62 of the Code of Criminal Procedure. We would like to draw your attention to the Kb. Section 67(3) and 321/2015. Section 3 (2) and (3) of the Act on the Undertakings, which do not necessarily refer to the Applicant in the appropriate manner. (4) of - 67. We will pay attention to Article 321/2015. 12-14. Section 16 and the Kbt. 64. - In the case of a glossary: The Kbt. Section 65 (1). (c) and Article 32 (2) of Law No 322/2015. the basis of which is the case with the operators involved in the epithetics industry. as well as non-Hungarian hosts. in the case of the European Parliament and Council Directive 2014/24 / EU XI. breastin the case of a similar account in its present case. Section 65 (7) in case the organization that has been able to provide the capacity must demonstrate, at the time of the submission of the one-off European documentary document, that the above-mentioned min. complies with the requirements. The details of these above mentioned names in case of economic operators established in Hungary-the Provider checks for non-Hungarian economic operators in the case of European Parliament and Council Directive 2014/24 / EU XI. (extract) or any other certificate or statement to be filed in accordance with Section 69 of the Provider. Section 2 (5) BC. based on the time, they are eligible for the ESPD IV. please provide proof of the accuracy of the data provided by the application form, and if necessary, please provide the full details of the special requirements. According to Article 69 (4) and (8) of the Act, a valid statement must be made. The Beneficiary must attach: P1) A 321/2015. Kr. Article 19 (1) (c) on the basis of the total price of the subsection (s) of the previous quarter, and the same period of time, as a result of the purchase of a subpoena (or epitaxis) and when he started on camelsif the data is available to you, if the data subject does not have the above mentioned document because he is in a legal form in which the disclosure of the arbevetel is not feasible, he or she shall be entitled to a reasonable suit and instead of the verified mod, it does not matteryou may certify a Penzuegy and a business opportunity with another declaration or document considered as a candidate. In the case of a well-timed person, he or she will be encouraged to work in a legal form in which the disclosure of the statement of the arbevetel is not possible and sufficient to meet the requirements of these pointsinstead of a glass mod, it is customary to justify the modularity approved by the 321/2015. According to Section 19 para. (3) of the Act. Paragraphs 65 (7) - (8), (11) and 321/2015. Paragraphs (6) to (7) of Section 19 of this Act are also irrevocable. 1) (8) of Section 35 of the Basic Law in the contract award procedure does not allow the winning bidder (s) to(2) The date must be attached to the date of the foundation of the person who is a member of the family or a lawyer or a chamber member of the Chamber. If the date is not recorded by a person who is not a registered student, it must be accompanied by a mandate of the date of filing. 3) In the case of a filing, it is necessary to enclose to the cegbirosag the registered copy of the bill and the confirmation of the cegbirosag altal. If the filing date is not in progress, please enclose the relevant statement. 4) The Registrar shall be aware that the Kbt. Subsection (6) of Section 71 does not order another Hianypotlast if the Hianypotlass(5) Provider in the cloud compares the terms and conditions of the contractor's full pension, financial, technical and professional qualifications and is certified by qualified accountants the listener was hardest hit by the user III.1.2) and III.1.3) in all aspects of his / her experiment. 6) The supervisor has examined the opportunity and does not consider it economically critical since the volume, complexity, solidity, due to tight deadlines due to the deadline, it is impossible to grant the resale-doentes. 7) A IV.2.6. point is based on the time period of the probationary period of 60 days. 8) FAKSZ: Kerekes Anita 00181, dr. Zoltan Budai 00783. 9) The Trustee reminds us that the winning bidder is to extend the responsibility of the contractor responsible for enforcing the contract in the contractor or the existing liability insurance as provided for therein. Forces: this is 2 000 000 000 HUF (ie two billion forints) and at least HUF 100 000 000 (ie one million HUF) / aresmen. In the case of - 40, the one-off, electronic bidding system (EDF), operated by the ME, will eventually be completed by 424/2017. (XII. 19.) Korm.). documents from 424/2017. (XII.-(12) Korm. (12) Provides other documents related to documents transmitted in the EDF, declarations made in electronic form to electronic declarations, and declarations made electronically in the EDF / 2017th (XII.19.) Government Decree 10-13. They contain. 13) The use of the EDF may be made by: https://ekr.gov.hu/portal/tamogatas; and http://nekszt.hu/tamogatas/ 14) There are no questions about the buyers in the beginning of the year, about the co-purchases in the year 2015. CXLIII. in accordance with the regulations of the Toervens and the Regulations of the Applicant. 15) The Trustee will remind you that, as outlined above, the Kbt.-Section 16, paragraph (6) of this Act. 16) The Applicant shall apply the Kbt. Section 75 (2) (e). 17) The time period specified in point II.2.7 shall be 270 days in the calendar days and shall be 270 days from the date of submission to the Technical Assistance Committee. Internet address (URL): http://www.uni-nke.hu
The bid deadline for Contract notice: Construction work was 11 Sep 2018. Bidding is closed.
This tender has been issued by NEMZETI KÖZSZOLGÁLATI EGYETEM in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45210000 - Building construction work, 45214000 - Construction work for buildings relating to education and research.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 25579524. The purchaser document reference is 340375-2018.