Contract notice: Construction work Tender in Poland - 24353274
Tender notice from Poland, published on 21 Jun 2018.
Executive Summary
The WÓJT GMINY TARNOWO PODGÓRNE has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 21 Jun 2018 and is scheduled to close on 30 Jul 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24353274, while the tender notice number is 264963-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45112700, 45111291, 45111200, 45100000, 45214200, 45262522, 45262300, 45261200, 45320000, 45330000, 45332200, 45331110, 45331200, 45331100, 45421152, 45421146, 45421000, 45421160, 45400000, 45431000, 45000000, 45112700, 45111291, 45111200, 45100000, 45214200, 45262522, 45262300, 45261200, 45320000, 45330000, 45332200, 45331110, 45331200, 45331100, 45421152, 45421146, 45421000, 45421160, 45400000, 45431000 CPV Description: Construction work. Landscaping work. Site-development work. Site preparation and clearance work. Site preparation work. Construction work for school buildings. Masonry work. Concrete work. Roof-covering and roof-painting work. Insulation work. Plumbing and sanitary works. Water plumbing work. Boiler installation work. Ventilation and air-conditioning installation work. Central-heating installation-work. Installation of partition walls. Installation of suspended ceilings. Joinery work. Ironmongery work. Building completion work. Tiling work. Construction of the Technical School Complex in Tarnow Podgorny Reference Number: WOP.271.49.2018 1 . The subject matter of the contract is the construction of the Technical School Complex in Tarnowo Podgorne. Main Site: Tarnowo Podgorne. 1. All work should be done in accordance with the agreementnot with regulations, applicable standards, technical conditions and construction knowledge, safety and fire regulations, as well as recommendations of the Employer. The Contractor will apply materials with technical, constructional and functional parameters not worse than those specified in the technical specification and design. Applied in the design documentation and technical specifications of the performance and acceptance of the robot wskproducts of origin are used to define the standards of technical and quality characteristics. The Contractor may use indicated or equivalent, another product that meets technical and quality requirements and has functional properties not worse than those specified in the Employer's documentation. The contractor who invokes equivalent solutions is obliged to demonstrate that the deliveries he offers, services or works meet the requirements specified by the Employer. 2. The Contractor's obligation and cost also includes: - - carrying out all types of works by persons with valid building qualifications, - securing the construction site and operating the robot in accordance with health and safety regulations and fire protection, - preparing and handing over as-built documentation to the Employer, - secureinstallation and equipment on the construction site and in its immediate environment prior to their destruction or damage during the execution of the work that is the subject of this Agreement, - ensuring safe use of the land adjacent to the construction site, - - completing, during the implementation of the robot subject to this Agreement, any documentation in accordance with the provisions of Law budowlanego, - removal of any defects and faults found during the work in the time agreed by the Parties, however not longer than the technically justified date necessary to remove them, - protection and management of the construction site until the completion of the investment, which does not exclude the contracting authority for supervision, - elimination of the effects of the construction process on the environmentno construction, - payment of fees for storing waste, - carrying out the necessary tests and obtaining opinions prior to commencement of use, - organizing a construction office at the construction site, in which the weekly Construction Council will be held 3. Ordering party pursuant to art. 29 para. 3a of the Public Procurement Law, requires employment by a contractor or a subcontractor based on a contract of employment for persons performing nthe following activities in the implementation of the order, the performance of which involves the performance of work in the manner specified in art. 22 - 1 of the Act of 26.6.1974 Labor Code (Journal of Laws of 2014, item 1502, as amended). The detailed requirements are included in SIWZ. 4. The ordering party requires the contractor to indicate the part of the orders that he intends to entrust with the subcontractors, and the contractorm subcontractors. 1. The ordering party does not set any requirements as to the ability to run a professional activity. 2. The Contractors, who: 1) may not be excluded under the provisions of art. 24 sec. 1 of the Public Procurement Law, 2) meet the conditions for participation in the proceedings set out below. 3. The contracting authority provides for the possibility of excluding the contractor based on art. 24 sec. 5-point. 1, 2 and 4 Public Procurement Laws 4. The contracting authority, before awarding the contract, will call the Contractor whose offer has been rated the most, to submit within the prescribed, not shorter than 10 days, the current date as of the day of submitting the following statements and documents: a) Information from the National Criminal Register in the scope specified in art. 24 sec. 1 items 13, 14 and 21 of the Public Procurement Law, issued no earlier than-6 months before the deadline for submitting offers; b) A copy from the relevant register or central records and information on economic activity, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act; c) Declaration of the Contractor about the lack of issuing a final court or final judgment against him-an administrative decision on defaulting on payment of taxes, social security or health insurance premiums or in the event of such a judgment or decision confirming payment of such claims together with any interest or fines or a binding agreement on repayment of such claims; d) Disclaimer Contractors about the lack of a ruling inpresent as the preventive measure of the prohibition against applying for public orders; 6. If the Contractor has his registered office or place of residence outside the territory of the Republic of Poland, he submits documents in accordance with the provisions of - 7 and -8 of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the procurement procedure-(Journal of Laws of 2016, item 1126), described in detail in the SIWZ. 7. i) Contractor who relies on the abilities or situation of other entities under the terms of art. 22a of the Public Procurement Law, in order to demonstrate the absence of grounds for exclusion, submit documents referred to in the ToR in Chapter VIII point 5 a-d) regarding this entity. J) In the event of a joint application for the contract by the Contractorsyou mentioned in the SIWZ in Chapter VIII point 7 and in p. 5 point ad) must be submitted regarding each of the Contractors jointly applying for the order. 3a) it is required to have financial means or creditworthiness for a minimum of PLN 1 700 000.00 3b) Contractor must have appropriate civil liability insurance on the guarantee sum for menimum PLN 10, 000, 000. 1. The Contractor must submit a bid deposit of PLN 500, 000.00 before the deadline for submission of tenders. The Employer will demand from the Contractor whose tender has been selected as the most advantageous, to provide security for the proper performance of the contract with a value of 5% of the total price specified in the offer. The offer must contain the following statements and documents: 1) completed forman offer line prepared using the template constituting Annex No. 1 to the SETC, containing in particular: the total gross offer price, obligation regarding the deadline for the order, warranty period and payment terms, statement on the period of binding the offer and acceptance of all provisions of the ToR and the contract template without reservations, as well as information about which part of the contractca intends to entrust subcontractors; 2) statements listed in Chapter VIII, point 1-4 of this ToR; The statement should be sent in an electronic form with a qualified electronic signature (for detailed requirements see chapter X of the ToR), 3) the third party's obligation (in original) to make available to the Contractor the necessary resources for the needs of ordering (hedthe contractor refers to the resources of the third party); 4) a simplified or partial cost estimate containing all positions of the robot's returns together with a statement of calculating factors adopted for the cost estimate (R, S, Kz, Kp, Z) and a price list of materials 3. The contracting authority will apply art. 24aa of the Public Procurement Law 4. The Contracting Authority provides for the possibility of ordering on the terms specifiedin art. 67 section 1 point 6 of the Act on Public Procurement Law, up to 10% of the value of the basic order, consisting in the return of similar construction works, in particular: sanitary installations, electrical installations, road works, finishing works (painting, flooring, etc.) etc.) 5. Contractor within 3 days from the date of posting on the website information referred to in art. 86 ust. 5 of the Public Procurement Law, will provide the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 Public Procurement Law. Along with the submission of the statement, the contractor may provide evidence that links with other contractors do not lead to distortion of competition in the procurement procedure. The pattern of the declaration is attached as Annex 4 do SIWZ. Internet address (URL): www.tarnowo-podgorne.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 30 Jul 2018. Bidding is closed.
This tender has been issued by WÓJT GMINY TARNOWO PODGÓRNE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45112700 - Landscaping work, 45111291 - Site-development work, 45111200 - Site preparation and clearance work, 45100000 - Site preparation work, 45214200 - Construction work for school buildings, 45262522 - Masonry work, 45262300 - Concrete work, 45261200 - Roof-covering and roof-painting work, 45320000 - Insulation work, 45330000 - Plumbing and sanitary works, 45332200 - Water plumbing work, 45331110 - Boiler installation work, 45331200 - Ventilation and air-conditioning installation work, 45331100 - Central-heating installation work, 45421152 - Installation of partition walls, 45421146 - Installation of suspended ceilings, 45421000 - Joinery work, 45421160 - Ironmongery work, 45400000 - Building completion work, 45431000 - Tiling work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24353274. The purchaser document reference is 264963-2018.