Contract notice: Construction work Tender in Poland - 24352929
Tender notice from Poland, published on 21 Jun 2018.
Executive Summary
The MIASTO STO?ECZNE WARSZAWA DZIELNICA BIA?O??KA has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 21 Jun 2018 and is scheduled to close on 31 Jul 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24352929, while the tender notice number is 264905-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 71220000, 71221000, 45100000, 45200000, 45300000, 45400000, 45112723, 37530000, 45000000, 71220000, 71221000, 45100000, 45200000, 45300000, 45400000, 45112723, 37530000 CPV Description: Construction work. Architectural design services. Architectural services for buildings. Site preparation work. Works for complete or part construction and civil engineering work. Building installation work. Building completion work. Landscaping work for playgrounds. Articles for funfair, table or parlour games. Budowa szkoĹ‚y podstawowej w rejonie ulic Ruskowy Brod i Verdiego w Warszawie. Reference-Number: UD-II-WZP-271.52.2018..ZDY / PN-b The subject of the order is the construction works together with the implementation of the supplementary project documentation as part of the project: "Construction of a primary school in the area of Ruskowy Brod and ul. Verdiego ". Main Site: Warsaw. 1.3 The material scope of the subject of the contract includes: Construction works, namely: 1) preparation of the construction site, including OrganizacI movement in the vicinity of the construction, Protection of the vegetation to be preserved, grubbing up the trunks and roots, Construction site fencing, Equipment and reconciliation at the own cost of the location of the construction site along with the connection costs and use of water and electricity (local vision necessary), Placing in a publicly accessible place, visible to third parties, on the investment site, -for communication routes, on the fence of the construction site or other visible place in the immediate vicinity of the construction site, information boards compliant with the requirements and guidelines specified by the Employer, Necessary dismantling and disassembly (Contractor will determine independently during the local vision) 2) Construction of the building in accordance with project documentation, which is possessed by the Employer and executed by-Contractor, in particular: a) partitions if it becomes necessary to dismantle and export existing items, export and utilization of material from the partitions, b) provide solutions and costs related to the preparation of the ground and foundation of building foundations and construction of roads, playgrounds, playgrounds from geological surveys and the recommendations of the constructor attached to dokume- c) protection and protection of high-voltage power cables and gas network cables (if necessary), d) sanitary sewage system installation, including gullys and separators; cold water, hot utility water and circulation water installations as well as water for fire purposes; installation of mechanical supply and exhaust ventilation, water sewage system-rainwater (discharge to drainage ditches), cowraz installation with a boiler room, heat pump set, gas installation, e) electrical installations: basic and evacuation lighting, plug-in sockets, power supply and ventilation control, surge protection, installation of switchboards with complete equipment, TV installation (with antenna and sockets), installation-low-voltage complete: video intercoms, surveillance (internal and external monitoring), telephone and internet installations, computer logic network combining all rooms, lightning protection system, earthing installation and control connections, SSWiN burglary and robbery alarm system and other resulting from construction and executive documentation, f) assembly-personal lift adapted to transport disabled people, g) installation of a renewable energy source - air-water heat pump, h) technological equipment of kitchen rooms and equipment permanently associated with the facility, i) fire-fighting signs and equipment, j) road construction internal with parking spaces, k) land development including: - felling trees and tosubstitution plantings, - fencing, - execution of internal roads and parking lots, - playground construction, - playground construction, - assembly of small architecture elements, - supplementation and disposal of unnecessary land, - external lighting of buildings and terrain, - bicycle stands, - bicycle shelters. L) construction of a water supply connection, m) construction of a sanitary sewage connection with inclusion in sisewerage, n) construction of drainage and connection of storm water drainage system, including into drainage ditches, o) construction of internal energy installation and lighting of the area, p) construction of telecommunication ducts, q) execution, agreement and implementation of temporary and permanent traffic organization, r) execution of complete as-built documentation with geodetic inventory in paper version andelectronic (in 2 copies), 3) elaboration of the energy performance certificate of the building and fire safety instructions, 4) obtaining a usage permit - the Contractor applying for this public order must be in an economic and financial situation ensuring the execution of the order. In particular, the Contractor must demonstrate that: -a) has achieved total nett revenuesfor not less than PLN 60, 000, 000 in each of the last 3 financial years on the basis of "Profit and loss account" items: "Net income from the sale of products, goods and materials" or "Net revenue from sales and matched with them" and showed current liquidity ratio at the end of each financial year, higher or equal to 1.20 in the last 3 years, Current liquidity ratiofinancial interest is calculated as a quotient of: • Revolving assets excluding subsidiaries for the robot, supplies and services with a maturity of more than one year and short-term liabilities reduced by liabilities due to the robot, supplies and services with a maturity of more than one year. avoid any doubt in the situation where the Contractor's financial statements in accordance with the provisionAccounting is subject to examination, and as at the date of submitting bids, the Contractor does not have an opinion of a certified auditor regarding the report for the last financial year or when the financial year of the Contractor does not coincide with the calendar year, the Contractor submits financial statements for the last 3 financial years together with the auditors' opinions these years. In the case of joint application of 2 or more-Contractors for the award of this contract, the condition specified above in full must meet at least one of the Contractors jointly applying for the order. B) has financial resources or creditworthiness in an amount not lower than PLN 7, 000, 000, In the case of a joint application of two or more Contractors for granting this order, the condition specified aboveThe Contractors must fulfill jointly (jointly) or independently or relying on the resources of other entities. The Contracting Party requests that the Contractors pay a bid bond in the amount of PLN 700, 000 (in words: seven hundred thousand zlotys). The bid security should be submitted before the deadline for submission of offers. in one or several forms, in accordance with point 4 of the ToR. 2. The contractors who agree may apply for the contractNot from point 3.2 of the ToR - Are not subject to exclusion from the proceedings based on: a) art. 24 sec.1 of the Act; b) art. 24 sec. 5 of the Act, i.e.: - art. 24 sec. 5 point 1 - in relation to which the liquidation was opened, the court approved in the restructuring proceeding is expected to satisfy the creditors by liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 ust. 1 of the Act of 15.5.2015 - Restructuring Law (Journal of Laws of 2016, item 1574, 1579, 1948 and 2260) or whose bankruptcy was announced, with the exception of the contractor who, after the bankruptcy, concluded an arrangement approved by a legally valid court order, if the agreement does not provide for the satisfaction of the creditors by liquidating the assets of the bankrupt, unless the court ordered the liquidation of its assets in accordance with art.366 para. 1 of the Act of 28.2.2003 - Bankruptcy Law (Journal of Laws of 2016, item 2171, 2260 and 2261 and of 2017 item 791), - art. 24 sec. 5 point 2 - who in a manner of culpable seriously violated professional duties, which undermines his integrity, in particular when the contractor as a result of deliberate action or gross negligence did not perform or improperly performed the order, which the ordering party is inshow it by means of appropriate evidence, - art. 24 sec. 5 point 4 of the Public Procurement Law - which, for reasons attributable to him, did not perform or improperly performed a significant contract for a public contract or a concession contract concluded with the ordering party referred to in Art. 3 par. 1 points 1-4, which led to the termination of the contract or compensation, - art.24 sec. 5 point 8 - which has violated obligations regarding tax payments, fees or social security or health insurance premiums, which the orderer is able to prove by means of appropriate evidence centers, except in the case referred to in art. 24 sec. 1 point 15, unless the contractor has paid the due taxes, fees or premiums for social or health insurance together with odswith fines or fines or has a binding agreement to repay these debts. 3. In accordance with point 3.3 of the SIWZ, a list of statements or documents confirming compliance with the conditions of participation in the proceedings and no grounds for exclusion and other documents required in the proceedings - submitted together with the offer in accordance with point 3.3 of the SIWZ 3.3.1. Uniform European Order Document - every Contractorsubmits the current day of the offer (EAT) according to Annex 2 to the ToR. 3.3.2. Written commitment of entities for resources to which the Contractor refers in order to meet the conditions for participation in the proceedings. 3.3.3. The offer form with content in line with the one specified in the template constituting Annex No. 1 to the ToR. 3.3.4. Output data for cost estimation according to Annex No. 5B to the contract templatey 3.3.5. Declaration on the fulfillment of the information obligations provided for in Article 13 or art. FROM THE AGE OF CHILDREN 3.3.7. A power of attorney or other document indicating that the person signing the offer is authorized to do so. 3.3.8. Photocopy of payment of the bid bond. 4. The Awarding Entity does not provide for the order to be reimbursed by similar construction works as provided for in the entryOrder on the order for the basic order (in the mode of Article 67 paragraph 1 point 6 of the Public Procurement Law). Detailed information will be published in the ToR. The SIWZ will be posted on the website at http://www.bialoleka.waw.pl from the moment of publication of the announcement in the Publications Office of the European Union. Internet address (URL): www.bialoleka.waw.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 31 Jul 2018. Bidding is closed.
This tender has been issued by MIASTO STO?ECZNE WARSZAWA DZIELNICA BIA?O??KA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 71220000 - Architectural design services, 71221000 - Architectural services for buildings, 45100000 - Site preparation work, 45200000 - Works for complete or part construction and civil engineering work, 45300000 - Building installation work, 45400000 - Building completion work, 45112723 - Landscaping work for playgrounds, 37530000 - Articles for funfair, table or parlour games.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24352929. The purchaser document reference is 264905-2018.
This tender falls under Construction and Real Estate, Materials and Products in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.