The PKP POLSKIE LINIE KOLEJOWE S.A. has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 31 May 2018 and is scheduled to close on 05 Jul 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 23781665, while the tender notice number is 231669-2018 and Register on the platform.

Key facts

Summary
Contract notice: Construction work
TOT Ref. No.
23781665
Document Ref. No.
231669-2018
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
31 May 2018
Bid deadline
05 Jul 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 71322000, 45200000, 45230000, 45234000, 45234100, 45234113, 45234116, 45234115, 45231400, 45000000, 71322000, 45200000, 45230000, 45234000, 45234100, 45234113, 45234116, 45234115, 45231400, 71000000, 45100000
CPV Description: Construction work.
Engineering design services for the construction of civil engineering works.
Works for complete or part construction and civil engineering work.
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork.
Construction work for railways and cable transport systems.
Railway construction works.
Demolition of tracks.
Track construction works.
Railway signalling works.
Construction work for electricity power lines.
Architectural, construction, and engineering services.
Site preparation work.
"Revitalization of railway line 292 on the section Jelcz Miłoszyce Wrocław Sołtysowice in order to restore passenger transport in WrOF "
Reference Number: IREZA4g-216-15 / 2018
The subject of this Order is: Opracording of project documentation and execution of construction works within the project pn :. "Revitalization of railway line 292 on the section Jelcz Miłoszyce Wrocław Sołtysowice in order to restore passenger transport in WrOF." The subject of this Contract is divided into Part A and Part C. The contract covering Part A will be signed by PKP Polskie Linie Kolejowe S.A., while the contract coversca. Part C will be signed by the Czernica Commune.
Main Site: Railway line No. 292 Jelcz Miłoszyce Wrocław Osobowice on the section Jelcz Miłoszyce Wrocław Sołtysowice.
Part A:
1) development of project documentation;
2) obtaining the speed resulting from existing geometry, without going beyond existing earthworks, min. 100 km / h and max. 120 km / h and ensuring permissible pressure dla passenger trains on all sections covered by the investment of at least B2 at the maximum speed; for freight trains D4 at a speed of at least 60 km / h (unless the track geometry results in a lower speed for freight trains in the given location);
3) sub-track works on selected sections;
4) replacement of the surface covering only the replacement of existing wooden sleepers-and parts of concrete foundations for new ones along with cleaning and ballast filling; welding of existing rails to a non-contact rail; reconstruction and unblocking of drainage;
5) construction of a new street between Jelcz Miłoszyce and Wrocław Swojczyce stations (2 main tracks and 2 platform edges);
6) reconstruction of the track layout at the Wrocław Swojczyce station, to ensure: wjaz possibilitiesdu and departure from the station at a speed of min. 70 km / h, construction of an island platform that meets the requirements of technical regulations and TSI PRM and service of freight trains for neighboring production plants; - 7) adaptation of engineering facilities to traffic parameters, taking into account the durability of objects for at least 15 years by conducting revitalization works on facilities;
8) adjustment of roto fit platforms to the location of human settlements and purposes of travel in accordance with the assumptions set by ZIT WrOF, adaptation of platforms for the service of persons with limited mobility;
9) increase in category 3 of trips where the product of traffic is exceeded, lack of visibility, replacement of obsolete devices, equipment of crossings in SSP devices,
10) for the new passingconstruction of new, computerized railway traffic control devices, with a common computer in Wrocław Swojczyce station and line devices on the Wrocław Sołtysowice Jelcz Miłoszyce section with the adaptation of external devices (station built at Wrocław Swojczyce station);
11) replacement of worn-out telecommunications equipment, development of new networks and radio equipment• 12) replacement of worn out elements of the existing traction network, including replacement of individual damaged support structures;
13) at the construction of railway stops, construction of pedestrian routes, parking spaces for bicycles, lighting;
14) placing information and commemorative tables as an informational and promotional obligation Beneficiary associated with the designation of the place of project implementation.
1. Contractors who can not be excluded from the Proceedings under Art. 24 sec. 1 item 12-23 of the Act, excluding the premises specified in art. 24 sec. 1 point 13 lit. d) and point 14 for the offense referred to in Article 24 sec. 1 point 13 lit. d) of the Act (premises for mandatory exclusion) and in art. 24 sec. 5 points 1, 5 and 6 of the Act (prerequisitesoptional exclusion) and fulfilling the conditions for participation in the Proceedings, specified in item 8.2 of the IDW.
2. In accordance with art. 22 ust. 1b of the Act, the Contractors who meet the conditions regarding: a) Competence or entitlements to conduct a specific professional activity may apply for the award of the Contract, if it results from separate regulations, b) Economic or financial situation, c) Technical abilities3. The contractor may, in order to confirm compliance with the conditions for participation in the Proceedings in relevant situations and in relation to a specific order, or a part thereof, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the merger. him with him legal relations.
3.1. The contractor, which polega on the capacities or situation of other entities, financial or economic capacity, must prove to the Employer that in fulfilling the order, will have the necessary resources of these entities, in particular by presenting the commitment of these entities to give him the necessary resources for the implementation of the Contract
3.2. The ordering party will assess whether shared by youContractors, by other entities, technical or professional capacity will allow the Contractor to demonstrate compliance with the conditions for participation in the Proceedings and examine whether there are any exclusion entities referred to in Art. 24 sec. 1 item 12-23 of the Act, excluding the premises specified in art. 24 sec. 1 point 13 lit. d) and point 14 for the offense referred to in Article 24 sec. 1 point 13 lit. d) Ujoints and in art. 24 sec. 5 points 1, 5 and 6 of the Act
3.3. If the Contractor meets the conditions referred to in point 8 of the IDW and refers to the resources of other entities in order to demonstrate the absence of grounds for exclusion and fulfillment to the extent to which refers to their resources, the conditions for participation in the Procedure include information about these entities in the statement referred to-in point 9.1. IDW.
3.4. In order to assess whether the Contractor relies on the abilities or situation of other entities under the principles set out in Art. 22a of the Act, it will have the necessary resources to the extent enabling proper implementation of the public order and assessment whether the relationship between the Contractor and these entities guarantees effective access to their resources, the Ordering Party requests documents that specifyin particular:
a) scope of resources available to the Contractor of another entity,
b) manner of using the resources of another entity, by the Contractor, while executing the Order,
c) scope and period of participation of another entity, when executing the Order, or entity, on the capacities of which The Contractor relies in terms of the conditions of participation in the proceedings regarding the experience, he will carry out construction works whichthe abovementioned abilities refer.
4. In respect of conditions relating to education, professional qualifications or experience, economic operators may rely on the capacities of other entities if they perform the works or services for which those capacities are required.
5.If the ability technical or professional aspect of the entity referred to in point 8.3.2 IDW does not confirm the fulfillmentand by the Contractor of the conditions of participation in the proceedings or the grounds of exclusion are applicable to these entities, the Employer requests that the Contractor, within the time specified by the Employer: replaced that entity with another entity or entities, undertook to personally perform the relevant part of the order if it shows technical or professional capacity or economic or financial situation
I. In zakconditions specified in item 8.2.2 of the IDW is required to demonstrate by the Contractor that it is in an economic and financial situation ensuring the execution of the Order, i.e.: A: A: has in the last 3 financial years, and if the period of conducting the activity is shorter, for this period, the average annual net income from sales in the minimum amount of PLN 27, 300, 000.00
b) has financial resourcescreditworthiness - in the amount not less than 13, 600, 000.00 PLN
Cz.C:
a) has in the last 3 financial years, and if the period of business is shorter, for this period, the average annual net sales income in the minimum amount of 570, 000.00 PLN
b) has financial resources or creditworthiness - in the amount not less than 280, 000.00 PLN
As a conversion rate for PLN of financial data expressed in currencies other than PLN, the average exchange rate published by the National Bank of Poland on the first working day of the month in which the contract notice was published in the Official Journal of the European Union should be adopted - Documents and statements required from the Contractor to confirm the fulfillment of the conditions for participation in proceedings
1. part of the financial report (RZiS), -if the report is required by the law of the country in which the contractor has its registered office or place of residence, and if it is subject to auditing by the auditor in accordance with the accounting regulations, also an opinion on the audited financial statements ( its part), and in the case of contractors not required to prepare financial statements, other documentsthe minimum annual turnover for the last 3 financial years, and if the period of business is shorter for this period. If an offer is submitted for two Parts, this Annex should be submitted separately for each Part,
2. information from the bank or cooperative savings and credit union confirming the amount of funds held or the creditworthiness of the contractor, inesie not earlier than one month before the deadline for submission of tenders. If an offer is submitted for two Parts, this Annex should be submitted separately for each Part,
3. other documents if for a justified reason of objective nature the Contractor is not able to obtain the documents referred to above - II. Statements and documents to be provided by the Contractor:
1. In to the targetin proving that there are no grounds to exclude from the Procedure and to confirm that the conditions for participation in the Procedure have been met, each of the Contractors is obliged to submit a Single Document, model provided in Appendix. nr7 to IDW. If an offer is submitted for two Parts, this annex should be submitted separately for each Part.
2. In the case of applying jointly by the Contractorscow (Consortium), the Single Document is submitted by each of the Contractors jointly applying for the order. The Single Document confirms in particular the lack of grounds for exclusion and fulfillment of the conditions for participation in the proceedings in the scope in which each of the Contractors demonstrates compliance with the conditions for participation in the Procedure. Contractor who refers to the resources of other entities in order to demonstrate the lack of istnthe grounds for exclusion and compliance with them, to the extent that they refer to their resources, the condition of participation in the proceedings is also submitted by the Single Document regarding each of them, together with the obligation, the model of which is attached. No. 3 to IDW. In the case of an offer for two Parts, this annex should be submitted separately for each Part.
4. Contractor indicating in JednolitA document of the part of the orders which the contractor intends to entrust to subcontractors and information about subcontractors on the resources of which the Contractor does not relate, if it is known to the Contractor which subcontractors intends to entrust the execution of a part of the order to demonstrate the absence of grounds for exclusion, submits the EJ for each of these subcontractors
1. The means of communicationelectronic, used to submit the Single Document by the contractor, is e-mail. WARNING! Placing an EAT along with an offer on a data carrier (eg a CD, pendrive) or in writing is not allowed, because it does not constitute its submission using means of electronic communication within the meaning of the provisions of the Act of 18.7.2002 on the provision of electronic services. Ordering dit leaves the data transfer only in pdf format. The allowable size of one uploaded file is 15 MB.
3. After creating or generating by the contractor an electronic document, EAT, the contractor signs the above-mentioned dock. a qualified electronic signature, issued by a qualified trust service provider that is an entity providing certification services - an electronic signaturey, meeting the security requirements set out in the Act of 5 September 2016 on trust services and electronic identification (Journal of Laws of 2016, item 1579)
4. The ordering party, in accordance with - 4 of the Ordinance of the Prime Minister of 27 June 2017 on the use of electronic communication media in public procurement proceedings and the provision and storage of electronic documentsectronic (OJ of 2017 item 1320) specifies the acceptable format of qualified electronic signature as - Documents in the "pdf" format should be signed in PADES or CAdeS format.
5 The signed electronic EJP should be encrypted, ie with an access password, a tool with open-source 7 Zip license (password protected zipped archive). The contractor places a password to access-EAT in the Offer Form (attachment No. 1 to IDW) submitted in writing.
6. The Single Document should be sent to the e-mail address: [email protected].
7. Contractor, within 3 days from the date of posting on the website information referred to in art. 86 par. 5 of the Act, provides the Employer with a declaration of belonging or non-affiliation to the same capital group, for whichmentioned in art. 24 sec. 1 point 23 of the Act. With the submission of a statement, the Contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the Proceedings. In the case of a consortium, the declaration is submitted separately by each of the Contractors jointly applying for the order.
The contracting authority provides for the award of contracts referred to in Article. 134 sec. 6 point 3) of the Act.A similar order may be awarded in the single-hand order mode, after prior negotiations with the Contractor, in particular in terms of contract terms, including price, deadline, warranty period / warranty period and may include the following ranges: Part A: works of the surface and subgrade, engineering facilities, railway and power engineering, Part C: road works, works in-teletechnical industry, works in the electric power industry.
8. Section IV 2.6. The minimum period in which the bidder will be associated with the offer is 2 months, i.e. 60 days.
9. Section II 2.7) Date of order fulfillment: Starting from the date of signing the Agreement, Completion and settlement of the entire subject of the Agreement as determined by signing the final acceptance report on 30/09/2019
10. Values in SectionII1.5) and II 2.6) relate to the basic order. Net estimated value for part A: PLN 54 635 025.47, for parts C: 1 152 325.77 PLN.
11. The leading entity of the Proceeding is PKP Polskie Linie Kolejowe S.A. Investment Implementation Center Silesia Region in Wrocław, 50-525 Wrocław, ul. Joannitow 13 authorized to conduct proceedings on behalf and for the benefit of the Czernica Commune, ul. Kolejowa 3, -55-003 Czernica based on the Partnership Agreement regarding the implementation of project documentation and construction works and information and promotion activities for the project "Revitalization of railway line No. 292 on the section Jelcz Miłoszyce Wrocław Sołtysowice in order to restore passenger transport in Wrof".
Internet address (URL): http://www.plk-sa.pl
Directive: Classical Directive (2014/25/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Construction work was 05 Jul 2018. Bidding is closed.

This tender has been issued by PKP POLSKIE LINIE KOLEJOWE S.A. in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45000000 - Construction work, 71322000 - Engineering design services for the construction of civil engineering works, 45200000 - Works for complete or part construction and civil engineering work, 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, 45234000 - Construction work for railways and cable transport systems, 45234100 - Railway construction works, 45234113 - Demolition of tracks, 45234116 - Track construction works, 45234115 - Railway signalling works, 45231400 - Construction work for electricity power lines, 71000000 - Architectural, construction, engineering and inspection services, 45100000 - Site preparation work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 23781665. The purchaser document reference is 231669-2018.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.