Contract notice: Construction work Tender in Poland - 22986199
Tender notice from Poland, published on 04 May 2018.
Exeutive Summary
The AKADEMIA SZTUK PI?KNYCH IM. W?ADYS?AWA STRZEMI?SKIEGO has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 04 May 2018 and is scheduled to close on 11 Jun 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22986199, while the tender notice number is 192400-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45000000, 45100000, 45223000, 45223100, 45223110, 45223200, 45223821, 45232460, 45262110, 45262120, 45262300, 45262310, 45262311, 45262321, 45262522, 45262700, 45300000, 45310000, 45311000, 45312000, 45312100, 45312200, 45312310, 45313100, 45314310, 45314320, 45316100, 45320000, 45321000, 45323000, 45324000, 45330000, 45331000, 45331100, 45332000, 45332400, 45343000, 45343220, 45400000, 45410000, 45420000, 45421100, 45421141, 45421146, 45421152, 45430000, 45432000, 45432113, 45432114, 45440000, 45442200, 45450000, 45453100, 45000000, 45100000, 45223000, 45223100, 45223110, 45223200, 45223821, 45232460, 45262110, 45262120, 45262300, 45262310, 45262311, 45262321, 45262522, 45262700, 45300000, 45310000, 45311000, 45312000, 45312100, 45312200, 45312310, 45313100, 45314310, 45314320, 45316100, 45320000, 45321000, 45323000, 45324000, 45330000, 45331000, 45331100, 45332000, 45332400, 45343000, 45343220, 45400000, 45410000, 45420000, 45421100, 45421141, 45421146, 45421152, 45430000, 45432000, 45432113, 45432114, 45440000, 45442200, 45450000, 45453100 CPV Description: Construction works under the project titled Academic Center of Design for the Development of Cultural Heritage and Artistic Education Construction work. Site preparation work. Structures construction work. Assembly of metal structures. Installation of metal structures. Structural works. Prefabricated units. Sanitary works. Scaffolding dismantling work. Scaffolding erection work. Concrete work. Reinforced-concrete work. Concrete carcassing work. Floor-screed works. Masonry work. Building alteration work. Building installation work. Electrical installation work. Electrical wiring and fitting work. Alarm system and antenna installation work. Fire-alarm system installation work. Burglar-alarm system installation work. Lightning-protection works. Lift installation work. Installation of cable laying. Installation of computer cabling. Installation of outdoor illumination equipment. Insulation work. Thermal insulation work. Sound insulation work. Plasterboard works. Plumbing and sanitary works. Heating, ventilation and air-conditioning installation work. Central-heating installation work. Plumbing and drain-laying work. Sanitary fixture installation work. Fire-prevention installation works. Fire-extinguishers installation work. Building completion work. Plastering work. Joinery and carpentry installation work. Installation of doors and windows and related components. Installation of partitioning. Installation of suspended ceilings. Installation of partition walls. Floor and wall covering work. Floor-laying and covering, wall-covering and wall-papering work. Parquet flooring. Wood flooring work. Painting and glazing work. Application work of anti-corrosive coatings. Other building. Work. Refurbishment work. The subject of the order is construction works in the facility located at ul. Księży Młyn 13/15 in Ł-dź. The order includes works in the main (historic) building, including: • Installation of the insulation and attic roof; • Installation of ventilation chimneys above the roof, • DemoNtaż temporary bridges, • Demolition, construction, masonry work in the axes JM; • Disassembly of old installations in the axes JM; • Making internal installations in the building, including: installation of water and sewage, making, electrical, installation of mechanical ventilation, air conditioning, teletechnical installations (including: AV, LAN, SSWiN, CCTV, DSO, SAP, BMS); • Installation of a lightning protection system, • Making floors; • Making ceilings; • Making new partition walls in plasterboard technology, • Making wall claddings; • Making internal window sills. • Painting colored walls; • Installing installation accessories and lighting. By installing the required pattern acceptance by the Employer; • Joinery and door and window joinery; • Delivery and assembly of fixed equipment elements• Installation required pattern approval by the Purchaser; • Restoration of metal stairs. According to recommendations and in consultation with WUOZ; • Renovation of the mural. According to the recommendations and in consultation with WUOZ; The detailed scope of works is included in the design documentation for tasks and annexes (developed by Agnieszka SZAL ARCHITEKTURA) implementing replacement solutions in a stackto the original documentation (developed by KONTRAPUNKT V-PROJEKT). When valuing the robot, take into account the existing condition of the historic building, for this purpose, the Employer encourages to take a vision of the local object. Local inspection is not mandatory. All product and material names, standards, European technical assessments, approvals, technical specifications and technical reference systems-The orders referred to in the Project Documentation serve to establish the desired standard of performance and to determine the technical properties and requirements established in the technical documentation. Devices and materials, equivalent solutions understood as devices / materials made by any manufacturer while maintaining identical or better technical parameters and use values are allowedand fully compatible with the rest of the equipment provided that they meet the same technical characteristics and at the implementation stage they will be approved by the Employer. The Awarding Entity's decisions in this respect will be based on the requirements formulated in the contract documents as well as standards and guidelines. The detailed description of the subject of the contract is contained in the project documentationj the attachment to the Terms of Reference and the model contract, constituting an attachment to the ToR. DEADLINE 1. The ordering party demands a deposit of PLN 300, 000. (three hundred thousand zlotys). 2. The bid bond must be submitted before the deadline for submitting bids. 3. The bid bond can be contributed in one or several of the following forms, referred to in art. 45 par. 6 PPL: a) money, b) bank sureties or company suretiesa savings and credit union, however, the surety is always a cash guarantee, c) bank guarantees, d) insurance guarantees, e) sureties granted by entities referred to in art. 6b par. 5 point 2 of the Act of November 9, 2000. on the establishment of the Polish Agency for Enterprise Development 4. The contents of the guarantees and sureties referred to in art. 45 par. 6-points 2-5 of the PPL must be unconditional, irrevocable and at the first written request of the ordering party, obliging the guarantor to pay to the ordering party the amount specified in the guarantee: 4.1. if the contractor whose offer has been selected: a) the refusal to sign the public procurement contract on terms specified in the offer, - b) fails to provide the required performance bondo, c) it will not be possible to conclude a public procurement contract for reasons attributable to the contractor. 4.2. if the contractor in response to the call referred to in art. 26 par. 3 and 3a Pzp, for reasons attributable to him, shall not submit declarations or documents confirming the circumstances referred to in art. 25 ust. 1 PPL, the statement referred to in art. 25a para. 1 Pzp, power of attorney or does not agree to correct the mistake referred to in art. 87 par. 2 point 3 Pzp, which will make it impossible to select the offer submitted by the contractor as the most advantageous 5. The bid bond must be submitted before the deadline for submission of offers. The bid security paid in cash is paid by bank transfer to the bank account of the ordering party 33 1130 1163 0014 7148 7820 0011. A copy of the transfer order or inThe printout of an electronic transfer should be submitted along with the offer. 6. The payment of the deposit in money by bank transfer to the bank account indicated by the ordering party will be effective upon crediting the bank account with the amount of the bid bond (if the cash flow to the bank account indicated by the ordering party will occur before the deadline for submission of tenders). Original document confirming wbringing a deposit in the forms referred to in art. 45 par. 6 points 2-5 Pzp, the contractor submits with the offer. 8. In order to convert to PLN all values and financial data given in other currencies, the Employer will apply the average exchange rate of a given currency of the National Bank of Poland (NBP) as of the date of publication of the contract notice in the Official Journal of the European Union, andji is the day on which the National Bank of Poland does not publish the average exchange rate, the exchange rate will be adopted on the day following the day of publication of the notice 9. If the deposit is paid in the forms referred to in art. 45 par. 6 points 2-5 of the PPL and the amount of the deposit will be determined in a foreign currency in such forms in order to convert to PLN all the values and financial data provided in other currencies, the Purchaserwill apply the average exchange rate of a given currency of the National Bank of Poland (NBP) valid as of the date of publication of the contract notice in the Official Journal of the European Union, and if the date of publication is the day on which the NBP does not publish the average exchange rate, the exchange rate will be adopted on the day following the day of publication of the announcement. 10. In the case of a security lodged in cash and from the contents of the guarantee and the handrailreferred to in art. 45 par. 6 points 2 - 5 PPL, if the deposit will be paid in these forms, it must be concluded that the bid security secures the contractor's offer submitted in the public procurement procedure for "Construction works under the project entitled. Academic Center of Design for the development of cultural heritage and art education "designation of the case: KBZ.261.11.2018. 11. With the consent of thethe contractor may change the form of the bid bond into one or several forms referred to in Article 45 par. 6 Pzp. Terms of Reference. The change in the form of the bid bond must be made with the continuity of securing the offer with the amount of the bid bond. In the event of a bid bond in the money, the contractor may agree to include the amount of the security against the security. GUARANTEE AND WARRANTY. The contractor is obligedelić a minimum of 60 months warranty and a warranty for construction works performed. The offer by the Contractor of the warranty and warranty period below the indicated period will result in rejection of the offer under Art. 89 paragraph 1 point of the Public Procurement Law as inconsistent with the contents of the ToR. The warranty period and warranty is the criterion for the evaluation of offers - item 15.2.C. SIWZ. PROTECTION OF REQUIRED PERFORMANCE OF THE AGREEMENT. 1. Securing the lipsIt amounts to 5% of the total price indicated in the offer. The Contractor shall provide security before signing the public procurement contract. 2. The security for the due performance of the contract paid in cash is paid by bank transfer to the bank account of the ordering party 75 1130 1163 0014 7148 7820 0031. Contribution of the performance bond in cash by bank transfer to the bank account inordered by the orderer will be effective at the moment the bank account is credited with the amount of the collateral (the effect of cash funds on the bank account indicated by the ordering party must take place before the public procurement contract is signed). 3. The security for proper performance of the contract may be brought in one or several of the following forms referred to in art. 148 para. 1 PPA: a) money, b) bank guarantees or credit-savings bank guarantees, however, the surety is always a cash guarantee, c) bank guarantees, d) insurance guarantees, e) sureties granted by entities referred to in art 6b par. 5 point 2 of the Act of November 9, 2000 on the establishment of the Polish Agency for Enterprise Development(Journal of Laws of 2007 No. 42, item 275, as amended). In the case of lodging security in the forms referred to in art. 148 para. 1 point 2 - 5 PPA, the contractor submits the original document confirming the lodging of security in these forms. 4. Subject to point 17.5. The ToR, from the content of the guarantees and sureties referred to in art. 148 para. 1 point 2 - 5 of the PPL must be unconditional, irrevocable and on pithe written request of the awarding entity (beneficiary), obliging the guarantor to pay to the orderer the amount constituting 5% of the total price specified in the offer, due to non-performance or improper performance of the public procurement contract by the contractor (obligated). The ordering party returns the security within 30 days from the date of the order's execution and recognition by the ordering partyo duly made. The amount left to secure claims under the warranty for defects may not exceed 30% of the security amount. 6. The contents of the guarantees and sureties referred to in art. 148 para. 1 point 2 - 5 PPL must indicate that the amount left to secure claims under the warranty for defects is 30% of the security. 7 The amount referred to in point 17.6. SIWZ isreturned no later than on the 15th day after the end of the warranty period for defects. 8. The Ordering Party does not agree to provide security: a) in promissory notes with a promissory note of a bank or cooperative savings and credit union, b) by establishing a pledge on securities issued by the State Treasury or a local government unit, c) by establishing a registered pledgeo on the terms set out in the provisions on registered pledges and the pledge register. 9. With the consent of the ordering party, the contractor may change the form of security for one or several forms referred to in art. 148 para. 1 Pzp. The change in the form of the collateral must be made with the continuity of the collateral and without reducing its amount. 10. From the document stating the security depositand in a form other than in money, it must appear that the security concerns the proper performance of the public procurement contract for "Construction work under the project entitled. Academic Center of Design for the development of cultural heritage and artistic education "Designation of the case: KBZ.261.11.2018.". 11. The Employer does not agree to the creation of collateral by deductions from receivablesfor partially completed works. 12. If the contractor provides security in a foreign currency, the security amount will be converted into PLN according to the average PLN exchange rate in relation to foreign currencies announced by the National Bank of Poland (Table A of average foreign exchange rates) in force on the day of placing the contract notice on the day of publication of the contract notice Official Journal of the Euro UnionUnion. 13. If the security is provided in the forms referred to in art. 148 para. 1 point 2 - 5 Pzp and the amount of collateral will be determined in a foreign currency, the amount of collateral will be converted into PLN according to the average PLN exchange rate in relation to foreign currencies announced by the National Bank of Poland (Table A of average foreign exchange rates) on the day of publication of the announcement o zamoin the Official Journal of the European Union 14. If the collateral was provided in cash, the orderer stores them on an interest bearing bank account. The ordering party returns the security lodged in cash with interest resulting from the bank account agreement on which it was stored, less the cost of running the account and the bank commission for transferring the money tothe bank's performance of the contractor. 15. During the performance of the contract, the contractor may change the form of security for one or several forms referred to in Article 148 para. 1 point 2 - 5 PPL. The change in the form of the collateral is made with continuity of the collateral and without reducing its amount. In the case of lodging a security in a form other than money, the Contractor should present Zaproviding a guarantee or guarantee model for acceptance. 1. Settlements between the ordering party and the contractor will be carried out in PLN currency. 2. The price of the offer calculated by the Contractor should contain all indirect and direct costs that the Contractor considers necessary to bear for the timely and correct execution of the subject of the order (must include all costs related to the realigation of orders, resulting from project documentation and technical specification of performance and acceptance of construction works, as well as the following costs: all preparatory, reconstruction, ordinal works, development of construction site and maintenance of construction facilities, management of waste, landfills and temporary storage, implementation of as-built documentation, array andinforming, switching off and switching on devices, supervision by user's employees) Contractor's profit as well as all taxes and charges required by law, in particular VAT tax. 3. Attached to the ToR, the robot should be treated as an auxiliary material, not directly used to calculate the offer price. The prices indicated by the Contractor should be specified in accordance with art. 2 points 1 of the ActPzp, which states that the price should be understood as a price within the meaning of art. 3 par. 1 point 1 and par. 2 of the Act of May 09, 2014 on information on prices of goods and services (Journal of Laws of 2014, item 915, as amended), i.e. the value expressed in monetary units, which the buyer is obliged to pay to the entrepreneur for goods or services ; the price includes tax on goods and services and excise duty, if, on the basis of separate regulations, the sale of goods (services) is subject to a tax on goods and services or excise duty. The price also means the tariff rate. Pursuant to the Act of 7 July 1994 on the denomination of the zloty (Journal of Laws No. 84 item 386 as amended), the Polish monetary unit is zloty, which is divided into 100 groszes. Thus, the smallest monetary value is PLN 0.01-(1 penny). 5. According to art. 91 par. 3a Pzp, if an offer was made, the election of which would lead to the creation of a tax obligation in accordance with the provisions on the tax on goods and services, the contracting authority adds to the price of the tax on goods and services listed therein, which would be required to settle according to these regulations. The Contractor, by submitting an offer, informsIf the choice of the offer will lead to the creation of the tax obligation by the contracting authority, indicating the name of the construction work, whose performance will lead to its creation, and indicating its value without the amount of tax. 6. The payment of remuneration will be made in parts, once a month, after the end of the unqualified robot planned in the Material and Financial Timetable for the givenmonthly billing period, with the proviso that the first billing period ends on the last day of the full calendar month counted from the date of signing the contract, and that the last part of the remuneration may not be more than 10% of the gross remuneration. Payment of each part of the remuneration will be made on the basis of a part properly issued by the General ContractorVAT invoice, up to 30 days from the date of its delivery to the Investor, by transfer to the bank account indicated in the invoice. 7. According to art. 91 par. 3a of the Public Procurement Law, the Contractor, when submitting the offer, is obliged to inform the Employer (in the Offer Form) whether the selection of his offer will lead to the creation of tax obligation by the Employer in accordance with the provisions on tax on goods and services, indicating the name (type) of the good or service whose delivery or performance will lead to its creation, and indicating their value without the amount of VAT. 8. In the case of subcontracts for works that are subject of a delivery or service, the obligation to submit a subcontract only applies to subcontracts: - for a value greater or equal to0.5% of the value of the contract or, - with a value greater than PLN 30, 000 1. Contractors can apply for the contract awarding: a) they are not subject to exclusion in the circumstances referred to in art. 24 sec. 1 and par. 5 point 1) of the PPL (items 5.4 and 5.5 of the ToR); b) meet the conditions for participation in the procedure specified by the contracting authority in the notice of procurement and the ToR. 2. Conditions for participation in the proceedings. 2.1. The contractors who meet the conditions for participation in the proceedings may apply for the award of the contract: - a) competence or entitlements to conduct a specific professional activity, if it results from separate regulations, - b) economic or financial situation, - c) technical capacity or professional Defined by the ordering party in the contract notice and SIWZ. Pursuant to art. 24 usBar 1 of the Public Procurement Law, the following is excluded: - 1) a contractor who did not show compliance with the conditions for participation in the procedure or was not invited to negotiate or submit initial offers or offers, or showed no grounds for exclusion; - 2) a contractor who is a natural person who has been validly convicted of a crime: a) referred to in art. 165a, art. 181-188, art. 189a, art. 218-221, art. 228-230a, art. 250a, art. 258 or art. 270-309 of the Act of June 6, 1997 - the Penal Code (Journal of Laws of 2016, item 1137, as amended by resolution 6)) or art. 46 or art. 48 of the Act of June 25, 2010 on Sport (Journal of Laws of 2016, items 176, 1170 and 1171 and of 2017, item 60 and 1051), b) of a terrorist nature, referred to in art. 115 - 20 of the Act of June 6, 1997 - the Penal Code, c) fiscal, d) referred to in art. 9 or art. 10 of the Act of 15 June 2012 on the consequences of entrusting work to foreigners staying against the provisions of the territory of the Republic of Poland (Journal of Laws item 769); 3) the contractor, if a member of its management or supervisory body, a partner of the company in the company overt or partner or general partner in the company of commandosor a limited joint-stock partnership or commercial proxy was convicted for an offense referred to in point 13; 4) a contractor against whom a final court judgment or final administrative decision was issued on the payment of taxes, fees or social security or health insurance premiums, unless that the contractor made payment of taxes, fees or social insurance contributions duee or health, including interest or fines, or made a binding agreement regarding the repayment of such claims; - 5) a contractor who, as a result of intentional action or gross negligence, misleads the purchaser on the information that he is not subject to exclusion, meets the conditions for participation in the proceedings or objective and non-discriminatory criteria, hereinafter referred to as 'selection criteria', -or who has concealed this information or is unable to produce the required documents; 6) a contractor who, as a result of carelessness or negligence, provided misleading information, which could have a significant impact on the decisions made by the ordering party in the procurement procedure; 7) a contractor who unlawfully influenced or attempted to influence the contracting activitieshim or obtain confidential information that may give him an advantage in the procurement procedure; 8) the contractor who participated in the preparation of the contract award procedure or employee, as well as a person who performs work on the basis of a contract of mandate, task, agency or other contracts for the provision of services, he participated in the preparation of such proceedings, unless caused by itcompetition blocking can be eliminated in other ways than by excluding the contractor from participation in the procedure, 9) contractor, who with other contractors has concluded an agreement to distort competition between contractors in the contract award procedure, which the contracting authority is able to demonstrate by appropriate evidence center; 10) contractor who is a collective entity, -which court ruled on the prohibition of applying for public orders under the Act of 28 October 2002 on the liability of collective entities for acts prohibited under penalty (Journal of Laws of 2016 item 1541 and of 2017 item 724 and 933); 11) a contractor, for whom a preventive measure was ordered to apply for public orders; 12) contractors who belonged to thosej of the capital group itself, within the meaning of the Act of 16 February 2007 on competition and consumer protection (Journal of Laws of 2017, item 229, 1089 and 1132), submitted separate offers, partial offers or requests to participate in the proceedings, unless they prove that the interconnections between them do not lead to distortion of competition in the procurement procedure. Based on Article. 24 par. 5 of the Public Procurement Law, the contracting authority also excludes the contractor: 1) in relation to which the liquidation has been opened, the court approved in the restructuring proceedings is expected to satisfy the creditors by liquidating its assets or the court ordered the liquidation of its property pursuant to art. 332 par. 1 of the Act of 15 May 2015 - Restructuring Lawjne (Journal of Laws of 2015, item 978, 1259, 1513, 1830 and 1844 and of 2016 item 615) or whose bankruptcy was announced, with the exception of the contractor who, after the bankruptcy, concluded an arrangement approved by a legally valid court order, if the arrangement does not provide for the satisfaction of the creditors by liquidation of the bankrupt's assets, unless the court ordered the liquidation of its assets pursuant to art. 366 para. 1 of the Act of 2February 8, 2003 - Bankruptcy Law (Journal of Laws of 2015, item 233, 978, 1166, 1259 and 1844 and of 2016 item 615); In order to confirm the lack of grounds for excluding the contractor from participation in the proceedings the ordering party requests the following documents: 1) information from the National Criminal Register in the scope specified in art. 24 sec. 1 items 13, 14 and 21 Pzp. 2) excerpt from the relevant register or central recordsand business information, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 Pzp; 3) the contractor's statement on the lack of issuing a final court judgment or final administrative decision on default of payment of taxes, fees or social security contributions to him or her;-health or - in the event of issuing such a verdict or decision - documents confirming payment of such receivables with possible interest or fines or conclusion of a binding agreement on repayment of such claims; - 4) declaration by the contractor about the lack of a ruling against him as a preventive measure public orders; 5) statements of performanceabout belonging or not belonging to the same capital group; in the case of belonging to the same capital group, the contractor may submit together with the declaration documents or information confirming that connections with another contractor do not lead to distortion of competition in the proceedings (see item 6.6 of this ToR). 24 sec. 11 Pzp contractor, within 3 days-from posting on the website information on the amount he intends to spend to finance the order, companies and addresses of contractors who submitted offers on time, price, order completion date, warranty period and payment conditions included in offers, provides the orderer with a declaration of affiliation or non-membership to the same capital group, o-which is mentioned in art. 24 sec. 1 point 23 Pzp. With the submission of a statement, the contractor may provide evidence that links with another contractor do not lead to distortion of competition in the procurement procedure. Internet address (URL): http://www.asp.lodz.pl Directive: Classical Directive (2004/18/EC)
The bid deadline for Contract notice: Construction work was 11 Jun 2018. Bidding is closed.
This tender has been issued by AKADEMIA SZTUK PI?KNYCH IM. W?ADYS?AWA STRZEMI?SKIEGO in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45223000 - Structures construction work, 45223100 - Assembly of metal structures, 45223110 - Installation of metal structures, 45223200 - Structural works, 45223821 - Prefabricated units, 45232460 - Sanitary works, 45262110 - Scaffolding dismantling work, 45262120 - Scaffolding erection work, 45262300 - Concrete work, 45262310 - Reinforced-concrete work, 45262311 - Concrete carcassing work, 45262321 - Floor-screed works, 45262522 - Masonry work, 45262700 - Building alteration work, 45300000 - Building installation work, 45310000 - Electrical installation work, 45311000 - Electrical wiring and fitting work, 45312000 - Alarm system and antenna installation work, 45312100 - Fire-alarm system installation work, 45312200 - Burglar-alarm system installation work, 45312310 - Lightning-protection works, 45313100 - Lift installation work, 45314310 - Installation of cable laying, 45314320 - Installation of computer cabling, 45316100 - Installation of outdoor illumination equipment, 45320000 - Insulation work, 45321000 - Thermal insulation work, 45323000 - Sound insulation work, 45324000 - Plasterboard works, 45330000 - Plumbing and sanitary works, 45331000 - Heating, ventilation and air-conditioning installation work, 45331100 - Central-heating installation work, 45332000 - Plumbing and drain-laying work, 45332400 - Sanitary fixture installation work, 45343000 - Fire-prevention installation works, 45343220 - Fire-extinguishers installation work, 45400000 - Building completion work, 45410000 - Plastering work, 45420000 - Joinery and carpentry installation work, 45421100 - Installation of doors and windows and related components, 45421141 - Installation of partitioning, 45421146 - Installation of suspended ceilings, 45421152 - Installation of partition walls, 45430000 - Floor and wall covering work, 45432000 - Floor-laying and covering, wall-covering and wall-papering work, 45432113 - Parquet flooring, 45432114 - Wood flooring work, 45440000 - Painting and glazing work, 45442200 - Application work of anti-corrosive coatings, 45450000 - Other building completion work, 45453100 - Refurbishment work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 22986199. The purchaser document reference is 192400-2018.