Contract notice: Construction work Tender in Hungary - 22505939
Tender notice from Hungary, published on 17 Apr 2018.
Executive Summary
The KARCAGI TANKERÜLETI KÖZPONT has issued a Tender notice for the procurement of a Contract notice: Construction work in the Hungary. This Tender notice was published on 17 Apr 2018 and is scheduled to close on 23 May 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22505939, while the tender notice number is 163501-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Regional or local authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45000000, 45210000, 45421100, 45442100, 45331000, 45260000, 45000000, 45210000, 45421100, 45442100, 45331000, 45260000, 45112720, 45321000, 45262300, 45430000, 45310000, 45200000 CPV Description: Construction work. Building construction work. Installation of doors and windows and related components. Painting work. Heating, ventilation and air-conditioning installation work. Roof works and other special trade construction works. Landscaping work for sports grounds and recreational areas. Thermal insulation work. Concrete work. Floor and wall covering work. Electrical installation work. Workfor all or part of construction and civil engineering work Infrastructural developer of learning aids for coaching students in the framework of the EFOP 4.1.3.-17 program, in relation to the 8 projects of the Karcagi Tankerueleti Koezpont EFOP 4.1.3-17 program, Timekeepers maintaining the 8 learning chapters in educationThe main goal of the Kovacs Mihaly Altalanos School is to develop the infrastructural helpers of the "Letesitmeny" learning aids of the Kovacs Mih-ly Altalanos School (Abadszalok), and in the framework of the eight-day program, in the form of a controversial form of controversy, the developer is interested in the original epuelThe main tasks and the quantifiers of the whole project are: The jeweler remembers that the work listed below and the workloads involved in the work of the Agendas are the work of the big order of work and shall not be considered to be a breeder The development of the Letesitmeny developer with its terueles of the following: - Creation of a tower, - Facade leaks and epueletbeasas, with the replacement of the roof of a hidden rainwater drainage channel, cross-sectional with congestion Energetic modern rooms, which is the heating system primary side erosion (exchange of boilers, oscillators and steam - Infocommunikacios akadalymentesites, with the usual installation works, - Replacement of the fencing strips with the suppressed conductors with the clamp, with the atalakitasaval. Execute the main quantities: - point and upstairs elastic sports bench in 4 mm thick 64, 11 m - interior wall paint 150 m, wood-grooved honeysuckle 503 m, - - swinging arrows in the main wall system of the forming gymnasticsn oessz: 8 pcs, - lying canals with 650 mm wide widths, - new drain with 150 mm radius 204 m, - Placement of gas heated heating elements, water and gas boiler, foeldgaz or PB gas, - roof 503 m. Respectable information on the workmanship of the contractor and the exact boundaries of the tasks, technical requirements for the quality of the materials, • Provide a timely test of the quality of the project, including documentary, technical, technical, and non-verbal explanation of the relevant legislation, standards, work-experience and technical documentation. firewalls, taxes - The winner of the winner is to try to make the worker aware of the fact that he or she does not mean that he or she works there and does not end up in the workplace. Reconstruction of the school board is in the form of an artificial, upright interest. The task of the timer is to carry out the tasks of the artificial lifting elements- The winner is the winner of the 191/2009. - The winning bidder, writer of documents, the acquirer and the holder of any assignment to the Auction Manager and the payer of the debit card, who is responsible for the use of the Letter of Sale, a Letto a supporter of the presentation, and to a safe artificial puppet. This must be covered by the timeframe, - the documentation of the materials, structures and equipment of the assembled materials, structures and equipment, and the approval of the application for use, and the submission to the customer of the application for use. THEThe technical documentation of the Koezbeszerzesi document is a technical, technical and practical application of the documents. The winner of the Qualifier is extended until the limits set out in the export-level design document and the other applicable Koezbeszerzesi documents are met. Where the roster is triggered by the employee / document boundaryt originated from a type of reference, it is named only in the wording of the common definition of the tar character. Tenderer accepts a full-fledged full body. The all-in-one kivaltas must be equally reported in the given time. In all respects, There is no time-maker (AT) (in case of a timely appointment)and you can not take the opportunity to be a valid case by the economic operator who is the competent authority of the Kbt. (1) and (2) of Section 62. One of the exclusionary reasons contained in Article 62 para. (1) and (2) shall be the sub-contractor (hereafter referred to as AK) from the commencement of the business. Article 62 (1) and (2)The reasons for this are as follows: Verification mode: The AT and, where applicable, the eligible economic operator (s), who are eligible to receive the timing of the call for proposals in the 321/2015. (X.30.) Korm., In accordance with Article 4 (1) of the Basic Act, hereinafter "ESPD" shall be required to prove in advance that it does not fall under the provisions of Section 62 (1)-(2), and prior to the date of performance of the foregoing, the Kbt. In accordance with the provisions of Section 69 para. (4) of the Rules of Procedure, all members of the Democratic Party shall submit the ESPD form to the exclusionary grounds. (X.30.) Korm. Decree based on Article 15 (1) of the base of AT, the suitably justified-(s), only the ESPD should be summoned for the sole reason for the exclusion of the reasons for doing so. In the context of the subprojects that are not eligible to AT for AT. (4) of - 67. Non-issuance of a valid justification if the Kbt. Section 69 (11)It does. The Kbt. Section 64 may be based on the AT by the subordinate legal order. In this case, the final decision is to be submitted to the form with the same test. (X.30.) Korm. Decree, in the case of the registration of a variable in the case of a lawyer, the date must be attached to the date of the entry into the register and to the date it is sent from the building to the cegbirosag altalIf no ATP is in progress in the case of an AT, and in the case of an accountable body, in which case a declaration of a non-contentious declaration is not required. 2015th (X.30.) Government Decree 4 -, 6. - and 12-16. In the case of justifications for exclu- sion reasons, the Trustee's Appointment Attendance Attention is drawn to Article 321/2015. (X.30.) Of the Hungarian Government Decree No.- 321/2015. • The Hungarian statutory AT and, where applicable, the eligible economic operator (s) (X.30.) According to Section 8 of the Government Decree. Article 62 (1) egThe grounds for exclusion set out in paragraph 2 are not met. In the case of AT, which is not based in Hungary, AK is 321/2015. (X.30.) Korm. Decree and declarations according to - 10. WARNING SZ.1 please give professional qualifications. VI.4.3) Appealing of legal remedies! In all respects: Provider in the form does not choose host and pensionyou should be able to take a suitable test procedure, taking into account the low clamping force of the bush. 1. The timing shall include the time-limiting statement of the Kbt. (2) and (4) of Section 66 (Time Statement, ESPD) 2. Alvallalkokok: The Provider does not sign in and out of this License. Article 63 (a) and (b) of Article 66. 3. WARNINGlet me give you some quirks. VI.4.3) Enforcement of judicial remedies at a point. 4. Quoted by the timers, the number of eligible members of the list of qualified timers was fixed more strictly (M.1.). 5. Projects: Provides a timely and easy-to-use project portfolio for both time-consuming and challenging timesetters. Critical aspect: The 1st (Ar) brainstorming(26 March 2016) (EC 2016 (e) 147), Theory of Relationships, Relative Behavioral Methods, point 1, point (ba), Relative Reference Method, "Translated Goldness" . Grades 2 and 3 (Qualified) The co-ordinator of the Koezbeszerzesi Hattalag is used for the selection of the winning bidder(KE 2016 evi 147, December 21, 2016) 1st Breast Augmentation A. Relative Relationships Modes: "Straight Goldness" Modes of Relative Behavior of Sub-item 1 (bb) Adhato Score: 0-100. The information contained in the Koezbeszerzesi dokumentacio (Segedlet koetete) is provided by the Procurement Officer in accordance with Section 81 (5). 7. Responsibility: The Trustee reminds us that 322/2015. (X.30.) Korm. On the basis of Article 26 of the Constitution of the Republic of Hungary, the Contracting Party shall, at the time of the Contractor's request, extend the Subsidiary Contract to the Respondent to the Respondentbrain to the dictated liability liability of the documentary. The Trustee has a dictated liability liability: in cases of 3, 4 and 8 rescheduled: the lowest 10 000 000 HUF / contract period and the lowest 5 000 000 HUF / karememeny, the 1, 2, 5, 6 and 7 rows in case of rescheduling: lowest 5 000 000 HUF / contract term duration and minimum 2 500 000 HUF / karesem(epitesi-szerelesi) responsibility, which should be extended to the epithets of the company according to the requirements. In the event that the winning bidder does not have the liability of the responsible insurer up to the date of the contract, the Ajanlatkerő will contact you with the due date, in which case the Tenderer shall have the Kbt. Section 131 (4) is based on the trial 8. The most desirable winner of the contract is the contractor of the sub-contractor Eljaras, who has been awarded the highest qualification criteria of Section II.2.5), in the case of 1-8 cases, with a technical manager with high professional experience, whoduring the entire duration of the contract, full coverage of the contract must be provided. The breach of the probationary measure, the Winning Provider shall report back to the Contractor's Examination Document and the Kbt. Section (131) of Section 131 (4) may be tested by the contractor with the most favorable time. Tenderer applies in the breeder's contracta the Kb. Section 75 (2) (e). 10. The time limit for testing (AF IV.2.6) is specified: 60 days, according to Kbt. Section 81 (11) of the Constitution. 11. More detailed information can be found in the Koezbeszerzesi documents 12. FAKSZ: dr. Ferenc Kerekes registration number: 00140 13. The AF. II.1.6) Incorporation of information in the field of payment: If the Issuer makes 2 more respectable repaymentslast in the timeline, in the case of Timekeeping, Timely Giveaway an idle! Internet address (URL): http://kk.gov.hu/karcag Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 23 May 2018. Bidding is closed.
This tender has been issued by KARCAGI TANKERÜLETI KÖZPONT in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45210000 - Building construction work, 45421100 - Installation of doors and windows and related components, 45442100 - Painting work, 45331000 - Heating, ventilation and air-conditioning installation work, 45260000 - Roof works and other special trade construction works, 45112720 - Landscaping work for sports grounds and recreational areas, 45321000 - Thermal insulation work, 45262300 - Concrete work, 45430000 - Floor and wall covering work, 45310000 - Electrical installation work, 45200000 - Works for complete or part construction and civil engineering work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 22505939. The purchaser document reference is 163501-2018.