Contract notice: Construction work Tender in Poland - 22454529
Tender notice from Poland, published on 14 Apr 2018.
Executive Summary
The BIBLIOTEKA NARODOWA has issued a Tender notice for the procurement of a Contract notice: Construction work in the Poland. This Tender notice was published on 14 Apr 2018 and is scheduled to close on 24 May 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22454529, while the tender notice number is 161135-2018 and Register on the platform.
Object of the contract Construction work Description: Contract notice: Construction work Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45000000, 45100000, 45111000, 45112700, 45200000, 45223100, 45223220, 45233200, 45261000, 45262300, 45262500, 45313100, 45311000, 45300000, 45312000, 45314000, 45316200, 45320000, 45330000, 45400000, 45410000, 45421000, 45430000, 45432200, 45440000, 45450000, 45451200, 42416100, 45262660, 39150000, 39000000, 39155000, 39516100, 39151000, 31521200, 31521100, 31523200, 44423450, 45000000, 45100000, 45111000, 45112700, 45200000, 45223100, 45223220, 45233200, 45261000, 45262300, 45262500, 45313100, 45311000, 45300000, 45312000, 45314000, 45316200, 45320000, 45330000, 45400000, 45410000, 45421000, 45430000, 45432200, 45440000, 45450000, 45451200, 42416100, 45262660, 39150000, 39000000, 39155000, 39516100, 39151000, 31521200, 31521100, 31523200, 44423450 CPV Description: Construction work. Site preparation work. Demolition, site preparation and clearance work. Landscaping work. Works for complete or part construction and civil engineering work. Assembly of metal structures. Structural shell work. Various surface works. Erection and related works of roof frames and coverings. Concrete work. Masonry and bricklaying work. Lift installation work. Electrical wiring andfitting work. Building installation work. Alarm system and antenna installation work. Installation of telecommunications equipment. Installation of signalling equipment. Insulation work. Plumbing and sanitary works. Building completion work. Plastering work. Joinery work. Floor and wall covering work. Wall-covering and wall-papering work. Painting and glazing work. Other building completion work. Panelling work. Lifts. Asbestos-removal work. Miscellaneous furniture and equipment. Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products. Library furniture. Soft furnishings. Miscellaneous furniture. Floor-standing lamps. Desk lamps. Permanent message signs. Nameplates. Wyk. rob. bud. i instal. w zespole bud. „A" BN w Wa-wie przy al. Niepodl213 in the circle przeb. readers and space ogolnod. along with buildings patio and access equipment and wyp. in the framework of before pn. Nowa Biblioteka ... Reference Number: XIV / 264/5/18 Full name of the proceeding from Section II.1.1) Name: Execution of construction and installation works in the building complex "A" of the National Library in Warsaw at Niepodległości 213 in the area of reconstruction of reading rooms and spaceavailable with the patio construction and delivery of equipment and equipment under the project entitled "The New Library of the Commonwealth - modernization of reading rooms and public spaces of the National Library in Warsaw". Main Site: Biblioteka Narodowa, Niepodległości 213, 02-086 Warsaw. 1. The subject of the order is the execution of construction and installation works in the building complex "A" of the Libraryki Narodowa in the scope of redesigning reading rooms and publicly accessible spaces along with patio construction and supply of equipment and equipment for conducting cultural activities in the National Library, al. Niepodległości 213 in Warsaw, in accordance with the design documentation and the Description of the Subject of the Orders. The subject matter of this order is divided into two stages: • Stage I includes the performance of the task titled:"Modernization of the mechanical ventilation system installation of the mechanical ventilation supply and exhaust with recuperation", under the project entitled "Energy modernization in buildings" A "of the National Library at al. Niepodległości 213 in Warsaw ", implemented on the basis of a signed agreement on co-financing no. POIS.01.03.01-00-0057 / 16-00 with NFOŚiGW (the Implementing Authority for the Project);e 1.3.1; Priority axis I Reduction in the emission of the economy of the Operational Program Infrastructure and Environment 2014-2020. • Stage II involves the performance of two tasks: "Construction works" and "Equipment and equipment", under the project entitled "Modernization of reading rooms and public spaces of the Library Narodowa ", implemented on the basis of a signed co-financing agreement No. POIS.08.01.00-14-0003 / 16-00 with the Ministry of Culture and National Heritage (Intermediate Body); Measure 8.1 Priority axis VIII Protection of cultural heritage and development of cultural resources, Operational Program Infrastructure and Environment 2014-2020. Tasks falling within the scope of Stage I and Stage II in the framework of the present proceedings: Stage I consists of one task named: "Modernization of the system installation of mechanical ventilation installation of ventilation mmechanical, supply and exhaust with recuperation. "Stage II consists of two tasks: • Tasks under the name:" Construction work ", • Tasks under the name:" Equipment and equipment ". 2. Description of the subject of the order is included in Annexes No. 1 -34 to the Terms of Reference, whereby the Employer notes that: the design documentation specified in Annexes 2 to 34 to the ToR has been divided into four tasks.Tasks No. 3 and No. 4 separated in the project documentation are not implemented in the framework of the present proceedings. - Separated for the purpose of this procedure Stage I and Stage II, have the following reflection in the project documentation: - Stage I task under the name "Modernization of the ventilation installation system mechanical assembly of mechanical ventilation, supply and exhaust with recuperation ": - inproject documentation is task No. 1, - Stage II task under the name "Construction works" - in the project documentation it is task No. 2, - Stage II task under the name "Equipment and equipment" in the project documentation is task number 2. This mum drafting "The execution of construction and installation works in the building complex" A "of the National Library in Warsaw at Aleja Niepodległości 213accursion of reconstruction of reading rooms and publicly accessible spaces along with patio construction and delivery of equipment and furnishings as part of the project entitled "The New Library of the Commonwealth - modernization of reading rooms and public spaces of the National Library in Warsaw", is implemented as: - POIS project.01.03.01 -00-0057 / 16-00 sub-measure 1.3.1 Priority axis I Reduction of economic emissivityOperational Program Infrastructure and Environment 2014-2020. Co-financing from the National Fund for Environmental Protection and Water Management (Institution Implementing the Project) - "Energy modernization in buildings" A "of the National Library at 213 Niepodleglosci Avenue in Warsaw", - project POIS.08.01.00-14-0003 / 16-00 Measure 8.1 Priority axis VIII Protection cultural heritage and the development of cultural resources, the Operational Program Infrastructure and Weddowntime 2014-2020. Co-financing from the Ministry of Culture and National Heritage (Intermediate Body) - "Modernization of reading rooms and public spaces of the National Library." The Ordering Party does not set a specific condition in this respect. 1 To meet the condition in the economic situation, the Contractor proves that he is insured against civil liability in the scope of activities related to the subject of the contractfor at least PLN 10, 000, 000. 2. In order to meet the condition regarding the financial situation, the Contractor will prove that he has financial resources or creditworthiness in the amount not less than PLN 2, 000, 000. Employer's note: In case of providing information in a bank or social savings and credit union confirming the amount of funds held or ability to createthe contractor of values in a foreign currency, the Employer will convert this value into PLN in accordance with the average NBP exchange rate (Table A) for a given currency as of the date of placing the contract notice in the Official Journal of the European Union. If on the day the announcement was published in the Official Journal of the European Union, there were no publications of the National Bank of Average Currency Rates (Table A), then Orderingy will convert this value into zloty according to the average NBP exchange rate (table A) for a given currency from the first day following the publication of the contract notice in the Official Journal of the European Union, in which the average exchange rates of the NBP were published by the NBP (Table A). Note: The offer validity period is 60 days. The 2-month period indicated in point IV.2.6 is due to the lack of moin the notice of the period expressed in days. Detailed information and requirements of the Ordering Party are included in the order documents - SIWZ.-public order, if none of the conditions indicated in art. 24 sec. 1 point 12-23 of the Public Procurement Law and indicated by the Ordering Party in chapter Va SIWZ optional prerequisite referred to in art. 24 sec. 5 point 8 of the Public Procurement Law Act, subject to the instructions contained in art. 24 sec. 7-10 and 12 Public Procurement Laws A. Statements and documents attached by the contractor to the offer: 1) valid on the day ofa statement in the form of a Single European Order Document, hereinafter referred to as "EAT", drawn up in accordance with the standard form set out in the Commission Implementing Regulation issued on the basis of Article 59 (2) of Directive 2014/24 / EU. resources of other entities, in order to demonstrate the lack of exclusion for themand fulfillment, in the scope in which they refer to their resources, the conditions for participation in the procedure, submit "EAT" regarding these entities. In the case of joint application by the Contractors, "EAT" is submitted by each of the Contractors jointly applying for order. These documents confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion in the scope of, ktorym, each of the Contractors demonstrates fulfillment of the conditions for participation in the proceedings and no grounds for exclusion. 2) Obligations of another entity referred to in art. 22a paragraph 2 of the Public Procurement Law, to provide the Contractor with the necessary resources to fulfill the order, if the Contractor relies on the ability or situation of other entities to confirm compliance with the conditions for participation in thetępowaniu; 3) power of attorney in the case when the offer and attached statements and documents are signed by a person not listed as a person authorized to represent the Contractor in general registers concerning the Contractor. B. Declaration of belonging or non-affiliation to the same capital group within the meaning of the Act of 16.2.2007 on competition protection andConsumers (Journal of Laws of 2016, item 184, 1618 and 1634): Contractor, within 3 days from the date of posting on the website the information referred to in art. 86 par. 5 of the Public Procurement Law, submits to the Ordering Party a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 of the PPL Act, which is the Contractor who submitted separate offers. Model of the above axisThe certificate will be posted on the website by the Ordering Party at the same time with the information provided for in Article 86 par. 5 Public Procurement Law. C. Documents and declarations submitted at the request of the ordering party: in order to demonstrate the absence of grounds for exclusion of the Contractor in the circumstances referred to in art. 24 of the Public Procurement Law, the Employer requests submission of declarations and documents referred to in ArtRegulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the Contractor in the procedure for awarding the contract (Journal of Laws item 1126), hereinafter referred to as the Regulation, in -5 point 1, point 2, point 3, point 5, point 6, point 9, point 10. In the case when the Contractor relies on the abilities or situation of other entities on the terms specified in art. 22a of the PZP Act, Zamathe claiming person requests submission, in relation to these entities, of the documents specified in the Regulation in -5 point 1, point 2, point 3, point 5, point 6, point 9. If the Contractor is established or resides outside the territory of the Republic of Poland, he submits the above-mentioned documents in accordance with -7 para. 1-3 of the Regulation Internet address (URL): http://www.bn.org.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Construction work was 24 May 2018. Bidding is closed.
This tender has been issued by BIBLIOTEKA NARODOWA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45000000 - Construction work, 45100000 - Site preparation work, 45111000 - Demolition, site preparation and clearance work, 45112700 - Landscaping work, 45200000 - Works for complete or part construction and civil engineering work, 45223100 - Assembly of metal structures, 45223220 - Structural shell work, 45233200 - Various surface works, 45261000 - Erection and related works of roof frames and coverings, 45262300 - Concrete work, 45262500 - Masonry and bricklaying work, 45313100 - Lift installation work, 45311000 - Electrical wiring and fitting work, 45300000 - Building installation work, 45312000 - Alarm system and antenna installation work, 45314000 - Installation of telecommunications equipment, 45316200 - Installation of signalling equipment, 45320000 - Insulation work, 45330000 - Plumbing and sanitary works, 45400000 - Building completion work, 45410000 - Plastering work, 45421000 - Joinery work, 45430000 - Floor and wall covering work, 45432200 - Wall-covering and wall-papering work, 45440000 - Painting and glazing work, 45450000 - Other building completion work, 45451200 - Panelling work, 42416100 - Lifts, 45262660 - Asbestos-removal work, 39150000 - Miscellaneous furniture and equipment, 39000000 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products, 39155000 - Library furniture, 39516100 - Soft furnishings, 39151000 - Miscellaneous furniture, 31521200 - Floor-standing lamps, 31521100 - Desk lamps, 31523200 - Permanent message signs, 44423450 - Nameplates.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 22454529. The purchaser document reference is 161135-2018.
This tender falls under Construction and Real Estate, Technology and Equipment, Materials and Products, Defence and Security in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.